Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23017A026 | 27 December 2022 | Independent Safety Committee - Annual Report Response on Safety of Operations | |
ML23041A378 | 26 December 2022 | Independent Safety Committee; Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations | |
ML23037A832 | 26 December 2022 | Independent Safety Committee; Submittal of Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations | |
ML21242A216 | 21 December 2022 | Issuance of Amendment Nos. 243 and 244 Technical Specifications and Revised License Conditions for the Permanently Defueled Condition (EPID: L-2020-LLA-0261 | Safe Shutdown Boric Acid Time of Discovery Shutdown Margin High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Post Accident Monitoring Cyber Security Aging Management Pressure and Temperature Limits Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Safeguards Contingency Plan Earthquake Maintenance Rule Program Control of Heavy Loads Minimum staff Recently irradiated fuel Fire Protection Program Unidentified leakage |
DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage | 20 December 2022 | Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage | Nondestructive Examination |
DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 24 | 20 December 2022 | Core Operating Limits Report for Unit 2 Cycle 24 | Shutdown Margin Coast down |
ML22342B244 | 13 December 2022 | DC-2023-07 Corporate Notification Letter | |
ML22342B239 | 6 December 2022 | LTR-22-0335 Jane Swanson, Board President, San Luis Obispo Mothers for Peace, Et Al., PG&E Must Be Required to Submit New License Renewal Application for Diablo Canyon Units 1 and 2 | Aging Management Exemption Request |
ML22339A102 | 5 December 2022 | Pg_E Presentation for NRC Public Meeting | Probabilistic Risk Assessment Aging Management |
PMNS20221204, Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 2 | 5 December 2022 | Public Meeting for License Renewal Application - Diablo Canyon Power Plant, Units 1 and 2 | |
ML22334A082 | 1 December 2022 | Correction to Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition | Minimum staff |
ML22326A163 | 21 November 2022 | Licensee Comment Email on Post-Shutdown Emergency Plan Amendment | |
ML22187A025 | 16 November 2022 | Issuance of Amendment Nos. 242 and 243 Revision to Emergency Plan for Post-Shutdown and Permanently Defueled Condition | Health Physics Network Minimum staff |
DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application | 31 October 2022 | Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application | License Renewal Exemption Request Fuel cladding |
IR 05000275/2022402 | 26 October 2022 | Security Baseline Inspection Report 05000275/2022402 and 05000323/ 2022402 | Preemption Authority |
IR 05000275/2022003 | 24 October 2022 | Integrated Inspection Report 05000275/2022003 and 05000323/2022003 and Exercise of Enforcement Discretion | Enforcement Discretion Functionality Assessment FLEX Operability Determination Severe Accident Management Guideline Fatigue Rule Fire Protection Program |
DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 1 | 12 October 2022 | Post-Shutdown Decommissioning Activities Report, Revision 1 | Anticipated operational occurrence Arc flash Environmental Justice |
DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 1 | 12 October 2022 | Site-Specific Decommissioning Cost Estimate, Revision 1 | Grab sample Offsite Dose Calculation Manual Coatings Affidavit |
DCL-22-039, Irradiated Fuel Management Plan, Revision 1 | 12 October 2022 | Irradiated Fuel Management Plan, Revision 1 | Decommissioning Funding Plan Aging Management |
ML22278A296 | 5 October 2022 | FAQ 22-02- Diablo Canyon Scram - Final Approved | |
ML22276A240 | 3 October 2022 | 1) FAQ Response Provided by NEI | |
ML22272A507 | 29 September 2022 | Summary of September 27, 2022, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 | Cyber Security |
ML23037A830 | 28 September 2022 | Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume I - Main Report | Safe Shutdown Boric Acid Fitness for Duty High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Probabilistic Risk Assessment Cyber Security Emergency Lighting Condition Adverse to Quality FLEX Aging Management Significance Determination Process Annual Radioactive Effluent Release Report Foreign Material Exclusion Annual Radiological Environmental Operating Report B.5.b Mitigating Strategies Exemption Request Earthquake Maintenance Rule Program Pandemic Coronavirus COVID-19 Fire Protection Program Scaffolding Power change Fatality |
DCL-22-080, Material Status Report for the Period Ending August 31, 2022 | 28 September 2022 | Material Status Report for the Period Ending August 31, 2022 | Depleted uranium |
DCL-22-077, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update | 28 September 2022 | Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update | Fuel cladding |
ML23037A831 | 28 September 2022 | Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits | Boric Acid Fitness for Duty High winds High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Cyber Security Finite Element Analysis Condition Adverse to Quality FLEX Decommissioning Funding Plan Aging Management Fukushima Dai-Ichi Significance Determination Process Annual Radioactive Effluent Release Report Open Phase Condition Design basis earthquake Foreign Material Exclusion Annual Radiological Environmental Operating Report Earthquake Maintenance Rule Program Pandemic Coronavirus COVID-19 Fuel cladding Biofouling Minimum staff Fire Protection Program Fire Watch Scaffolding Backfit Power change Fatality |
ML22271A885 | 27 September 2022 | Nuclear Utility Group on Equipment Qualification (Nugeq)'S Concern with Generic Implications Clarification | |
ML22266A001 | 22 September 2022 | (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons | |
DCL-22-074, Nuclear Material Transaction Report for New Fuel | 21 September 2022 | Nuclear Material Transaction Report for New Fuel | |
DCL-22-075, Upcoming Meeting with Nuclear Security and Incident Response Staff | 21 September 2022 | Upcoming Meeting with Nuclear Security and Incident Response Staff | |
ML22258A111 | 14 September 2022 | 2022 Diablo Canyon PIR Request for Information | Temporary Modification Pandemic |
DCL-22-071, Evacuation Time Estimate Analysis Using Most Recent Decennial Census Data | 13 September 2022 | Evacuation Time Estimate Analysis Using Most Recent Decennial Census Data | Pandemic Coronavirus COVID-19 COVID19 Siren |
DCL-22-069, Independent Spent Fuel Storage Installation, Revision to License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System | 9 September 2022 | Independent Spent Fuel Storage Installation, Revision to License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System | |
ML22238A239 | 8 September 2022 | ISFSI Renewal Acceptance Letter | |
DCL-22-070, Nuclear Material Transaction Report for New Fuel | 7 September 2022 | Nuclear Material Transaction Report for New Fuel | |
PMNS20220933, Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 | 7 September 2022 | Closed Meeting with Pacific Gas and Electric Company Regarding Planned Security Plan Changes for Diablo Canyon Nuclear Power Plant, Units 1 and 2 | |
ML22221A168 | 6 September 2022 | Issuance of Amendment Nos. 241 and 242 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspection | Nondestructive Examination |
DCL-22-067, Nuclear Material Transaction Report for New Fuel | 31 August 2022 | Nuclear Material Transaction Report for New Fuel | |
ML22241A114 | 29 August 2022 | NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions | |
ML22236A547 | 24 August 2022 | NRC Slides for Decommissioning Engagement Panel 8-24-2022 Meeting | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
DCL-22-065, Nuclear Material Transaction Report for New Fuel | 24 August 2022 | Nuclear Material Transaction Report for New Fuel | |
IR 05000275/2022005 | 23 August 2022 | Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2022005 and 05000323/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML22228A164 | 15 August 2022 | Comment (5) of Cindy Marie Absey, Neil Havlik & Kim Murry on Behalf of League of Women Voters of San Luis Obispo County, Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activ | |
IR 05000275/2022002 | 10 August 2022 | Integrated Inspection Report 05000275/2022002 and 05000323/2022002 | Boric Acid High winds High Radiation Area Internal Flooding Probabilistic Risk Assessment Coatings Nondestructive Examination Temporary Modification VT-2 Emergency Lighting Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program Power change Downpower |
IR 05000275/2022011 | 9 August 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2022011 and 05000323/2022011 | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Anchor Darling Significance Determination Process Large early release frequency Weak link |
IR 05000275/2022401 | 3 August 2022 | NRC Security Inspection Report 05000275/2022401, 05000323/2022401 | Safeguards Contingency Plan |
DCL-22-059, License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions | 26 July 2022 | License Amendment Request 22-03 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions | Shutdown Margin Surveillance Frequency Control Program Pressure Boundary Leakage |
ML22196A368 | 25 July 2022 | Withdrawal Acknowledgement of Temporary Exemption from Annual Force on Force Exercise Requirement of 10 CFR Part 73, Appendix B, Section VI, Subsections C.3(I)(1) and A.7 (EPID L-2022-LLE-0023 (COVID-19) | Exemption Request Coronavirus |
NRC-2022-0132, Comment (4) of Anonymous on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post Shutdown Decommissioning Activities Report | 22 July 2022 | Comment (4) of Anonymous on Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post Shutdown Decommissioning Activities Report | |
ML22238A346 | 21 July 2022 | Post-Shutdown Decommissioning Activities Report Public Meeting Transcript, Pages 1-132, July 21, 2022 | Earthquake Pandemic Chernobyl |