ML22238A239

From kanterella
Jump to navigation Jump to search

ISFSI Renewal Acceptance Letter
ML22238A239
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 09/08/2022
From: Christopher Markley
Storage and Transportation Licensing Branch
To: Zawalick M
Pacific Gas & Electric Co
Chris Markley NMSS/DFM/STLB 415-6293
References
EPID L-2022-RNW-0007
Download: ML22238A239 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Maureen R. Zawalick Vice President, Decommissioning and Technical Services Pacific Gas & Electric Company Mail code 104/6/608 P.O. Box 56 Avila Beach, CA 93424

SUBJECT:

APPLICATION FOR RENEWAL OF THE DIABLO CANYON INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE NO. SNM-2511 - ACCEPTED FOR REVIEW (EPID NO. L-2022-RNW-0007)

Dear Maureen Zawalick:

By letter dated March 9, 2022, Pacific Gas & Electric Company (PG&E) submitted an application for renewal of License No. SNM-2511 for the Diablo Canyon Independent Spent Fuel Storage Installation (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML22068A189). The current license expires on March 22, 2024. The submittal of the renewal application was timely per the requirements of Title 10 Code of Federal Regulations 72.42(b). In the application, PG&E requested to renew the license for an additional 40 years.

U.S. Nuclear Regulatory Commission (NRC) staff performed an acceptance review of your application to determine if the application contains sufficient technical information in scope and depth to allow the staff to conduct the detailed technical review.

This letter acknowledges acceptance of your application. The application appears to contain the information needed for the NRC staff to conduct a detailed technical review. We have established a schedule for the review and estimated that the staff may need approximately 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> to complete its review. The schedule allows for the staff to complete its technical review and issue a request for additional information (RAI) in February 2023 and the license renewal in November 2023, based on you adequately responding to the RAI in April 2023. If no RAI is needed, and based on the staffs evaluation, the approval may be issued at an earlier time. If a RAI is needed, the staff will keep you informed of any schedule changes. In general, no additional changes to the application should be submitted except for changes resulting from your response to an RAI.

September 8, 2022

M. Zawalick 2

If you have any questions regarding this matter, please contact me at (301) 415-6293 or at Christopher.Markley@nrc.gov.

Sincerely, Christopher T. Markley, Systems Performance Analyst Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-26 License No. SNM-2511 EPID No. L-20122-RNW-0007 cc: Diablo Canyon Service List Signed by Markley, Christopher on 09/08/22

Diablo Canyon Power Plant, Unit 1 and 2 Service List cc:

NRC Resident Inspector Diablo Canyon Nuclear Power Plant c/o U.S. Nuclear Regulatory Commission P.O. Box 369 Avila Beach, CA 93424 Energy Chair Sierra Club California 1100 11th Street, Suite 311 Sacramento, CA 95814 Diane Curran Harmon, Curran, Spielberg,

& Eisenberg, L.L.P 1726 M Street N.W., Suite 600 Washington, D.C. 20036 San Luis Obispo Mothers for Peace 1037 Ritchie Rd.

Grover Beach, CA 93433 Chairman, San Luis Obispo County Board of Supervisors County Government Center 1050 Monterey Avenue, Room 370 San Luis Obispo, CA 93408 California Public Utilities Commission 505 Van Ness, Room 4102 San Francisco, CA 94102 Diablo Canyon Independent Safety Committee ATTN: Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 Ms. Jennifer Post Pacific Gas & Electric Company P.O. Box 7442 San Francisco, CA 94120

Diablo Canyon Power Plant, Unit 1 and 2 Service List cc:

Mr. David H. Oatley, Vice President Diablo Canyon Operations and Plant Manager Diablo Canyon Nuclear Power Plant P.O. Box 3 Avila Beach, CA 93424 Telegram-Tribune ATTN: Managing Editor 1321 Johnson Avenue P.O. Box 112 San Luis Obispo, CA 93406 Mr. Gonzalo L Perez, Branch Chief California Department of Health Services Radiologic Health Branch, MS 7610 1500 Capitol Avenue Sacramento, CA 95814-5006 Mr. Robert B. Weiseniller, Ph.D.

California Energy Commission 1516 Ninth Street (MS 29)

Sacramento, CA 95814 Vice President, Special Projects Green Car Journal 1241 Johnson Avenue #356 San Luis Obispo, CA 93401 Ellen Carroll, Environmental Coordinator Department of Planning and Building County of San Luis Obispo 976 Osos Street, Room 300 San Luis Obispo, CA 93408-2040 Susan Strachan Nuclear Power Plant Decommissioning Manager Department of Planning and Building County of San Luis Obispo 976 Osos St #200 San Luis Obispo, CA 93401 The Honorable Lois Capps Member, United States House of Representatives ATTN: Greg Hass, District Representative 1411 Marsh Street San Luis Obispo, CA 93401

Diablo Canyon Power Plant, Unit 1 and 2 Service List cc:

California Energy Commission 1516 Ninth Street (MS 14)

Sacramento, CA 95814-5512 County Supervisor County Government Center 1050 Monterey Avenue San Luis Obispo, CA 93408 David A. Repka Winston & Strawn 1400 L Street N.W.

Washington, D.C. 20005-3502 Office of the County Counsel County Government Center, Room D320 San Luis Obispo, CA 93408 Arocles Aguilar, General Counsel Legal Division California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102 Jim Hartig, Chairman Diablo Canyon Comm.

Avila Valley Advisory P.O. Box 65 Avila Beach, CA 93424 Klaus Schumann Mary Jane Adams 26 Hillcrest Drive Paso Robles, CA 93446 General Manager & District Engineer Avila Beach Community Services District P.O. Box 309 Avila Beach, CA 93424 Nuclear Policy Advisor California Energy Commission 1516 Ninth Street Sacramento, CA 95814

ML22238A239 OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NAME CMarkley WWheatley YDiazSanabria DATE 8 / 24 /2022 9 / 6 /2022 9 / 8 /2022