ML073550467 | 21 December 2007 | Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss FENOC Fleet Wide Performance | |
ML073190511 | 20 December 2007 | Request for Alternative RR-A30, Revision 2 to Use Proposed Alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Structural Weld Overlays (Tac No. MD4452) | Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML073532235 | 19 December 2007 | Inspection Plan 1/1/08 - 12/31/08 | |
ML073230183 | 14 December 2007 | Request for Alternative RR-A31 for Pressurizer J-Groove Nozzle Weld Repairs (Tac No. MD5956) | Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML073470930 | 13 December 2007 | Notification of Inspection and Request for Information | Boric Acid Nondestructive Examination VT-2 Scaffolding |
ML072950144 | 27 November 2007 | Request to Use Later ASME Code Edition | Incorporated by reference |
ML073400824 | 27 November 2007 | Ohio Department of Public Safety/Request Permission to Observe Perry Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Inspection and Davis-Besse Radioactive Material Processing and Transportation Inspection/Letters | Fitness for Duty |
L-07-138, Actions Required by Confirmatory Order EA-07-199 | 26 November 2007 | Actions Required by Confirmatory Order EA-07-199 | Boric Acid |
ML073310381 | 21 November 2007 | Notification of Potential Part 21 Report Welding of Safety Related Components | |
ML073300013 | 19 November 2007 | Supplemental Information Regarding Proposed Alternative to American Society of Mechanical Engineers Code Section XI Repair Requirements | Weld Overlay Dissimilar Metal Weld |
ML073180505 | 19 November 2007 | RAI Related to Measurement Uncertainty Recapture Power Uprate License Amendment Request | |
ML073180358 | 19 November 2007 | Review of Measurement Uncertainty Recapture Power Uprate Application | |
ML073170716 | 8 November 2007 | Letter from FENOC to NRC Submittal of the 2007 Engineering Programs Effectiveness Independent Assessment Report for the Davis-Besse Nuclear Power Station | Safe Shutdown Boric Acid Packing leak Fire Barrier Probabilistic Risk Assessment Temporary Modification Cyber Security Operability Determination License Renewal Control of Heavy Loads Fire Watch |
ML073170697 | 8 November 2007 | Letter from FENOC to NRC Re Submittal of the Organizational Safety Culture and Safety Conscious Work Environment Independent Assessment Plan for the Davis-Besse Nuclear Power Station - Year 2007, Revision 1 | |
ML072900117 | 7 November 2007 | 09/12/2007 - Meeting Summary with Fenco to Discuss Licensee'S ITS Conversion License Amendment Request for Davis-Besse | |
ML073110497 | 1 November 2007 | David Geisen - Letter to Board Regarding Status of Geisen Criminal Proceeding | |
ML073100248 | 1 November 2007 | Comment (2) of Todd a Henderson on Behalf of Firstenergy Nuclear Operating Company (FENOC) on Energy Solutions PRM-50-88 Re to Amend 10 CFR 50.82., Termination of License | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
IR 05000346/2007004 | 25 October 2007 | EA-03-0214, IR 05000346-07-004, on 7/1/2007 - 9/30/2007, Davis-Besse Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control | High Radiation Area Fire Barrier Internal Flooding Past operability Temporary Modification Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Control of Heavy Loads Substantial potential for an overexposure |
ML072960032 | 19 October 2007 | Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate (License Amendment Request No. 05-0007) | |
ML072780387 | 18 October 2007 | Joseph J. Hagan Ltr. Acknowledgement of Receipt of Response Letters Required by Confirmatory Order | |
ML072390260 | 17 October 2007 | License Amendment, Issuance of Amendment Administrative Control of Penetrations During Refueling | |
ML072960181 | 17 October 2007 | Technical Specifications, Issuance of Amendment Administrative Control of Penetrations During Refueling | |
TAC:MD4421 | 17 October 2007 | ||
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072831360 | 10 October 2007 | LTR-07-0689 - E-mail James Foster Re NRC OI Deputized for Davis Besse | |
ML072830028 | 8 October 2007 | Response to Request for Additional Information Regarding License Amendment Application for Measurement Uncertainty Recapture Power Uprate (License Amendment Request No. 05-0007) | |
ML072690019 | 3 October 2007 | RAI Related to Measurement Uncertainty Recapture Power Uprate | |
ML072760279 | 2 October 2007 | Re Facility Preparing Examination | |
ML072750034 | 28 September 2007 | Response to Request for Additional Information Regarding Proposed Alternative to American Society of Mechanical Engineers Code Section XI Repair Requirements | Weld Overlay Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
TAC:MD6555 | 27 September 2007 | ||
ML072550181 | 27 September 2007 | G20070585/LTR-07-0553 - Robert Leyse Ltr Nrc'S Reactor Oversight Program | Nondestructive Examination |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
TAC:MD4681 | 20 September 2007 | ||
ML072640612 | 18 September 2007 | Response to Request for Additional Information Regarding License Amendment Application for Measurement Uncertainty Recapture Power Uprate | Safe Shutdown Boric Acid Coatings Aging Management Time Critical Operator Action Power-Operated Valves Fuel cladding Fire Protection Program Backfit Flow Induced Vibration |
ML072610565 | 17 September 2007 | Confirmatory Order, 2007 Independent Assessment of Corrective Action Program (FENOC) | Boric Acid Fitness for Duty Packing leak High Radiation Area Weld Overlay Probabilistic Risk Assessment Temporary Modification Cyber Security Finite Element Analysis Condition Adverse to Quality Foreign Material Exclusion Through-Wall Leak |
TAC:L24117 | 14 September 2007 | ||
TAC:L24116 | 14 September 2007 | ||
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
L-07-121, Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-199 | 13 September 2007 | Cynthia Carpenter Ltr. Actions Required by Confirmatory Order EA-07-199 | |
ML072600260 | 13 September 2007 | Davis-Besse - in the Matter of David Geisen Letter Criminal Trial Developments | |
ML072560056 | 12 September 2007 | 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides | Backfit |
ML072560046 | 11 September 2007 | 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides | |
TAC:MD6398 | 11 September 2007 | ||
ML072410041 | 31 August 2007 | Request for Additional Information Related to Measurement Uncertainty Recapture Power Uprate | |
ML072430311 | 31 August 2007 | 8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan | |
ML072430723 | 29 August 2007 | Response to Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML072430711 | 29 August 2007 | Semiannual Fitness-For-Duty Report, January - June 2007 | Fitness for Duty |
ML072330222 | 28 August 2007 | 09/12/2007 Notice of Meeting with Firstenergy to Discuss the August 3, 2007 License Amendment Request for Conversion to Improved Technical Specifications for Davis-Besse, Unit 1 |