Response to Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations
ML072430723
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/29/2007
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3361, RIS-07-017
Download: ML072430723 (4)


Text

FENOC 5501 North State Route 2 FirstEnergyNuclearOperating Company Oak Harbor. Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3361 August 29, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Response to Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlemen:

The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2007-17, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2011 for Operator License Examinations and through calendar year 2009 for the Generic Fundamentals Examination.

Should you have any questions or require additional information, please contact Mr. Robert C.

Hovland, Site Training Manager, at (419) 321-8406.

Very truly yours, K35/ V Mark B. Bezilla LJS Attachment Enclosure cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board M003

Docket Number 50-346 License Number NPF-3 Serial Number 3361 Page 1 of 1 COMMITMENT LIST The following list identifies actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in the submittal represent intended or planned actions by the DBNPS. They are described only as information and are not regulatory commitments. Please notify the Manager - Regulatory Compliance at 419-321-8000, at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A

Docket Number 50-345 License Number NPF-3 Serial Number 3361 Form NRC - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 NRC Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2008 CY2009 CY2010 CY2011 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2008 CY2009 C'12010 CY2011 NUMBER OF REACTOR 4 6 0 4 OPERATORS NUMBER OF SENIOR REACTOR 10 10 0 10 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/18/2008 09/14/2009 09/19/2011 ALTERNATE DATE 03/17/2008 10/19/2009 10/17/2011 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 CY 2009 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER