Letter Sequence Approval |
---|
|
|
MONTHYEARML0729601812007-10-17017 October 2007 Technical Specifications, Issuance of Amendment Administrative Control of Penetrations During Refueling Project stage: Approval ML0723902602007-10-17017 October 2007 License Amendment, Issuance of Amendment Administrative Control of Penetrations During Refueling Project stage: Approval 2007-10-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24057A0772024-03-0101 March 2024 Conforming License Amendments - Enclosure 1 ML24057A0782024-03-0101 March 2024 Amendments to Indemnity Agreements - Enclosure 2 ML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML20280A8272020-11-0303 November 2020 Issuance of Amendment No. 301 to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML20213C7262020-08-24024 August 2020 Issuance of Amendment No. 300 to Revise the Containment Leakage Rate Testing Program ML20030A4402020-02-27027 February 2020 Issuance of Amendment Nos. 304, 194, 299, and 187; Order Approving Transfers of Facility Operating Licenses and Independent Spent Fuel Storage Installation General Licenses and Conforming Amendments ML19326A7592019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Non-Proprietary, Letter & Encl 2-5, Order Approving Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML17270A1122017-10-19019 October 2017 Issuance of Amendment Revising Technical Specification Requirements for Ultrasonic Flow Meter Outage Time (CAC No. MF9080; EPID L-2017-LLA-0167) ML17219A0182017-08-0808 August 2017 License Renewal Commitment No. 42 ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML16342C9462017-01-12012 January 2017 Issuance of Amendment Revising Emergency Action Level Scheme ML16298A3492017-01-11011 January 2017 Issuance of Amendment Revising Technical Specification Requirements for the Radioactive Effluent Controls Program ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML16083A4812016-04-27027 April 2016 Issuance of Amendment Revising Emergency Diesel Generator Minimum Voltage and Frequency Acceptance Criteria ML15302A0752016-03-0808 March 2016 Issuance of Amendment Revising the Completion Date for Milestone 8 of the Cyber Security Plan ML15316A0562015-12-0808 December 2015 Renewal License ML15295A3192015-12-0707 December 2015 License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1 - Record of Decision ML15251A0462015-10-20020 October 2015 Issuance of Amendment Revising Containment Spray Nozzle Surveillance Requirement ML15239B2932015-10-0909 October 2015 Issuance of Amendment Related to Containment Leakage Rate Testing Program L-15-186, Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 572015-06-0505 June 2015 Supplemental Information for the Review Reactor Vessel Internals Inspection Plan and License Renewal Application Amendment No. 57 ML14205A6192014-08-29029 August 2014 Amendments to Indemnity Agreements (TAC MF0701, MF0702, MF0703, and MF0704) ML14023A7662014-03-31031 March 2014 Issuance of Amendment Related to Steam Generator Inventory Change (TAC No. MF0536)(L-13-040) ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML1208604472012-04-18018 April 2012 Issuance of Amendment Modification of the Special Visual Inspection Requirement of TS 5.5.8 Steam Generator Program ML1202502702011-12-27027 December 2011 2011 Davis - Besse Nuclear Power Station Initial Examination Administrative Files ML1125904312011-12-0909 December 2011 Issuance of Amendment Adoption of Technical Specifications Task Force Change Traveler 513, Revision to Technical Specification 3.4.14 L-11-289, License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report2011-09-19019 September 2011 License Renewal Application Amendment No. 16, Supplemental Information for the Review of the License Renewal Application Environmental Report ML1118902982011-08-31031 August 2011 Issuance of Amendment Cyber Security Plan ML1036101482011-01-28028 January 2011 Issuance of Amendment Request to Incorporate the Use of Alternative Methodologies for the Development of the Reactor Coolant System Pressure-Temperature Curves ML1009705492010-04-0909 April 2010 Corrections of Typographical Errors Amendment No. 281 and Safety Evaluation ML1006405062010-03-24024 March 2010 Issuance of Amendment Application to Update the Leak-Before-Break Evaluation for the Reactor Coolant Pump Suction and Discharge Nozzle Dissimilar Metal Welds ML1003506402010-02-0404 February 2010 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License ML0918103972009-07-16016 July 2009 Issuance of Amendments Application for TS Change for Adoption of TSTF-511 ML0829006002008-11-20020 November 2008 Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues ML0824902622008-10-0202 October 2008 Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD ML0814106522008-06-30030 June 2008 Issuance of Amendment 278 Regarding Measurement Uncertainty Recapture Power Uprate ML0723902602007-10-17017 October 2007 License Amendment, Issuance of Amendment Administrative Control of Penetrations During Refueling ML0720404172007-07-31031 July 2007 License Amendment, Issuance of Amendment Steam Generator Tube Integrity TS Amendment Using the Consolidated Line Item Improvement Process ML0719200042007-07-11011 July 2007 Revised Pages of Facility Operating License No. NPF-3 ML0604004722006-08-0909 August 2006 License Amendment, Issuance of Amendment Safety Features Actuation System Instrumentation Setpoints and Surveillance Testing Requirements, MC3084 ML0604005522006-03-0202 March 2006 License Amendment 274 Framatome Mark B-HTP Fuel Design for Cycle 15 ML0604102252006-03-0202 March 2006 Amendment License Application to Revise TS 3/4.8.1.1 A.C.Sources-Operating ML0526403932006-02-0707 February 2006 Licensing Amendment - Issuance of Amendment Administrative Controls 2024-03-01
[Table view] Category:Safety Evaluation
MONTHYEARML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML22269A3582022-11-15015 November 2022 Issuance of Amendment No. 305 Revising the Emergency Plan ML22277A6012022-10-14014 October 2022 Issuance of Amendment No. 304 Revising the Design Basis for the Shield Building Containment Structure ML22210A0102022-09-16016 September 2022 Energy Harbor Fleet- Issuance of Amendments Regarding Adoption of TSTF 554, Revise Reactor Coolant Leakage Requirements ML22147A1492022-06-0202 June 2022 Relief Request RP-3 Regarding Fuel Oil Transfer Pump Testing ML22136A1092022-05-24024 May 2022 Proposed Alternative Request RP-2 Regarding the Inservice Testing of Certain Pumps ML22118B0382022-05-0505 May 2022 Proposed Alternative Request RP-4 Regarding the Inservice Testing of High-Pressure Injection Pumps ML22096A3162022-04-12012 April 2022 Proposed Alternative Request RP-1 Regarding Digital Instrumentation for Inservice Testing ML22082A2532022-03-29029 March 2022 Correction Letter - Issuance of Authorization of Proposed Alternative to Use ASME OM Code Case OMN-27 ML22012A2972022-01-21021 January 2022 Proposed Alternative to Use ASME OM Code Case OMN-27 ML21075A1132021-04-16016 April 2021 Issuance of Amendment Nos. 311, 200, and 302 to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, Into the Technical Specifications ML20280A8272020-11-0303 November 2020 Issuance of Amendment No. 301 to Relocate Specific Surveillance Frequencies to a Licensee-Controlled Program ML20279A4402020-10-0808 October 2020 Energy Harbor Fleet-Beaver Valley Power Station; Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant - Request to Use a Provision of a Later Edition of the ASME Engineers Boiler and Pressure Vessel Code, Section XI ML20213C7262020-08-24024 August 2020 Issuance of Amendment No. 300 to Revise the Containment Leakage Rate Testing Program ML19305B1312019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 6, Non-Proprietary Safety Evaluation, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML19100A3062019-06-21021 June 2019 Issuance of Amendment No. 298 to Adopt National Fire Protection Association Standard 805 ML19028A0302019-04-11011 April 2019 FENOC - Beaver Valley Power Station, Unit 1 & 2; Davis-Besse Nuclear Power Station Unit 1; and Perry Nuclear Power Plant Unit 1 - Approval of Certified Fuel Handler Training and Retraining Program ML18179A4672018-07-30030 July 2018 FENOC-Beaver Valley Power Station, Unit No. 1 and 2; Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Issuance of Amendments Request to Adopt TSTF-529, Clarify Use and Application Rules ML18004A1222018-01-22022 January 2018 FENOC-Beaver Valley, Davis-Besse, and Perry - Alternative for the Use of ASME Code Case N-513-4 (CAC Nos. MG0120, MG0121, MG0122, and MG0123; EPID L-2017-LLR-0088) ML17270A1122017-10-19019 October 2017 Issuance of Amendment Revising Technical Specification Requirements for Ultrasonic Flow Meter Outage Time (CAC No. MF9080; EPID L-2017-LLA-0167) ML17256B1902017-10-12012 October 2017 Time-Limited Aging Analysis for the Reactor Vessel Internals Loss of Ductility at 60 Years ML17081A5092017-05-11011 May 2017 ISFSI, Davis-Besse ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI - Issuance of Amendments Re. Application to Revise Technical Specifications to Adopt TSTF-545 Revision 3 ML17017A3402017-01-31031 January 2017 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-051 and EA-12-049 ML16328A1252017-01-23023 January 2017 Relief from the Requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code) (TAC No. MF7780 - MF7783) ML16342C9462017-01-12012 January 2017 Issuance of Amendment Revising Emergency Action Level Scheme ML16298A3492017-01-11011 January 2017 Issuance of Amendment Revising Technical Specification Requirements for the Radioactive Effluent Controls Program ML16040A0842016-06-0707 June 2016 FENOC, Beaver Valley Power Station, Unit Nos. 1 and 2; and Davis-Besse Nuclear Power Station, Unit No. 1 - Issuance of Amendments Revision to Technical Specification 5.3.1, Unit Staff Qualifications ML16083A4812016-04-27027 April 2016 Issuance of Amendment Revising Emergency Diesel Generator Minimum Voltage and Frequency Acceptance Criteria ML15302A0752016-03-0808 March 2016 Issuance of Amendment Revising the Completion Date for Milestone 8 of the Cyber Security Plan ML15251A0462015-10-20020 October 2015 Issuance of Amendment Revising Containment Spray Nozzle Surveillance Requirement ML15211A1612015-10-16016 October 2015 FENOC-Beaver Valley Power Station, Unit No. 1; Beaver Valley Power Station ISFSI, Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Perry Nuclear Power Plant ISFSI Annual Financial Test for a Parent Company Guarantee ML15239B2932015-10-0909 October 2015 Issuance of Amendment Related to Containment Leakage Rate Testing Program ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML14142A2922014-09-12012 September 2014 BVPS, Unit No. 1, BVPS (ISFSI) Davis-Besse Nuclear Power Station ISFSI, Perry Nuclear Power Plant, Unit 1, and Perry Nuclear Power Plant ISFSI - Annual Financial Test for Firstenergy Nuclear Operating Company Parent Company Guarantee (MF374 ML14030A5742014-03-31031 March 2014 Safety Evaluation Concerning Comprehensive Pump Testing Relief Request (TAC No. MF0756) (L-13-067) ML14023A7662014-03-31031 March 2014 Issuance of Amendment Related to Steam Generator Inventory Change (TAC No. MF0536)(L-13-040) ML14030A5922014-02-10010 February 2014 Safety Evaluation for Relief Requests RR-A1 and RR-B1 ML14002A4442014-02-0505 February 2014 Safety Evaluation for Relief Request RP-3 (TAC No. MF0757)(L-13-076) ML14003A2662014-01-27027 January 2014 Davis-besse Nuclear Power Station, Unit 1, Safety Evaluation for Relief Requests RP-1 and RP-1A ML13210A4672013-08-0101 August 2013 Safety Evaluation for Relief Requests RP-6 and RV-1 ML13121A4042013-05-0808 May 2013 Safety Evaluation in Support of Proposed Alternative Regarding Post-Repair Pressure Testing Requirements ML12221A4132012-10-0202 October 2012 Issuance of Amendments Change of the Name of a Owner Licensee to Firstenergy Nuclear Generation, LLC ML12242A4992012-09-11011 September 2012 Safety Evaluation in Support of 10 CFR 50.55a Requests RP-2 and RP-4 Regarding Inservice Pump Testing ML1210706862012-05-11011 May 2012 Safety Evaluation Regarding the Reactor Coolant System Pressure and Temperature Limits Report, Revision 1 ML1208604472012-04-18018 April 2012 Issuance of Amendment Modification of the Special Visual Inspection Requirement of TS 5.5.8 Steam Generator Program ML1207504812012-04-0909 April 2012 Safety Evaluation in Support of 10 CFR 50.55a Request RR-A35, Proposed Alternative to System Leakage Test Requirements ML1124305562011-09-22022 September 2011 Request for Threshold Determination Under 10 CFR 50.80 - Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 ML1118903222011-07-11011 July 2011 Review of the Steam Generator Tube Inspections Performed During Refueling Outage No. 16 in 2010 2024-01-17
[Table view] |
Text
October 17, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: ADMINISTRATIVE CONTROL OF PENETRATIONS DURING REFUELING (TAC NO. MD4421)
Dear Mr. Bezilla:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 277 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1. The amendment revises the technical specifications (TS) in response to your application dated February 12, 2007.
This amendment revises TS 3/4.9.4, Containment Penetrations, to allow containment penetrations that provide direct access from the containment atmosphere to the outside atmosphere to be open during refueling activities if appropriate administrative controls are established.
TS page 3/4 9-5 is not changed by this amendment. The page has been reformatted for proper pagination.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. Amendment No. 277 to NPF-3
- 2. Safety Evaluation cc w/encls: See next page
Mr. Mark B. Bezilla October 17, 2007 Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 - ISSUANCE OF AMENDMENT RE: ADMINISTRATIVE CONTROL OF PENETRATIONS DURING REFUELING (TAC NO. MD4421)
Dear Mr. Bezilla:
The U.S. Nuclear Regulatory Commission (the Commission) has issued the enclosed Amendment No. 277 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No. 1. The amendment revises the technical specifications (TS) in response to your application dated February 12, 2007.
This amendment revises TS 3/4.9.4, Containment Penetrations, to allow containment penetrations that provide direct access from the containment atmosphere to the outside atmosphere to be open during refueling activities if appropriate administrative controls are established.
TS page 3/4 9-5 is not changed by this amendment. The page has been reformatted for proper pagination A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Thomas J. Wengert, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. Amendment No. 277 to NPF-3
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC LPL3-2 R/F RidsNrrPMTWengert RidsNrrDssScvb RidsNrrDirsItsb RidsOgcRp RidsRgn3MailCenter RidsNrrDirsIolb RidsAcrsAcnwMailCenter GHill (2) RidsNrrLAEWhitt RidsNrrDraAadb RidsNrrDorlLpl3-2 RidsNrrDorlDpr JParillo, NRR Package Accession Number: ML072630545 Amendment Accession Number: ML072390260 TS Accession Number: ML OFFICE LPL3-2/PM LPL3-2/LA DRA/AADB/BC DSS/SCVB/BC DIRS/IOLB/BC DIRS/ITSB/BC OGC LPL3-2/BC NAME TWengert EWhitt MHart RDennig NSalgado TKobetz RHolmes RGibbs DATE 9/2707 9/27/07 9/27/07 9/28/07 9/28/07 10/4/07 10/15/07 10/17/07 OFFICIAL RECORD COPY
Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Manager, Site Regulatory Compliance President, Board of County FirstEnergy Nuclear Operating Company Commissioners of Ottawa County Davis-Besse Nuclear Power Station Port Clinton, OH 43252 Mail Stop A-DB-3065 5501 North State Route 2 President, Board of County Oak Harbor, OH 43449-9760 Commissioners of Lucas County One Government Center, Suite 800 Director, Ohio Department of Commerce Toledo, OH 43604-6506 Division of Industrial Compliance Bureau of Operations & Maintenance The Honorable Dennis J. Kucinich 6606 Tussing Road United States House of Representatives P.O. Box 4009 Washington, D.C. 20515 Reynoldsburg, OH 43068-9009 The Honorable Dennis J. Kucinich Resident Inspector United States House of Representatives U.S. Nuclear Regulatory Commission 14400 Detroit Avenue 5503 North State Route 2 Lakewood, OH 44107 Oak Harbor, OH 43449-9760 Joseph J. Hagan Stephen Helmer President and Chief Nuclear Officer Supervisor, Technical Support Section FirstEnergy Nuclear Operating Company Bureau of Radiation Protection Mail Stop A-GO-14 Ohio Department of Health 76 South Main Street 35 East Chestnut Street, 7th Floor Akron, OH 44308 Columbus, OH 43215 David W. Jenkins, Attorney Carol OClaire, Chief, Radiological Branch FirstEnergy Corporation Ohio Emergency Management Agency Mail Stop A-GO-15 2855 West Dublin Granville Road 76 South Main Street Columbus, OH 43235-2206 Akron, OH 44308 Zack A. Clayton Danny L. Pace DERR Senior Vice President, Fleet Engineering Ohio Environmental Protection Agency FirstEnergy Nuclear Operating Company P.O. Box 1049 Mail Stop A-GO-14 Columbus, OH 43266-0149 76 South Main Street Akron, OH 44308 State of Ohio Public Utilities Commission Manager, Fleet Licensing 180 East Broad Street FirstEnergy Nuclear Operating Company Columbus, OH 43266-0573 Mail Stop A-GO-2 76 South Main Street Attorney General Akron, OH 44308 Office of Attorney General 30 East Broad Street Columbus, OH 43216
Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 4430 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308
FIRSTENERGY NUCLEAR OPERATING COMPANY AND FIRSTENERGY NUCLEAR GENERATION CORP.
DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 277 License No. NPF-3
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment filed by FirstEnergy Nuclear Operating Company et al. (the licensee), dated February 12, 2007, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-3 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.277, are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Russell Gibbs, Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications and Facility Operating License Date of Issuance: October 17, 2007
ATTACHMENT TO LICENSE AMENDMENT NO. 277 FACILITY OPERATING LICENSE NO. NPF-3 DOCKET NO. 50-346 Replace the following pages of the Facility Operating License and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert License NPF-3 License NPF-3 Page 4 Page 4 TSs TSs 3/4 9-4 3/4 9-4 3/4 9-5 3/4 9-5
2.C. This license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level FENOC is authorized to operate the facility at steady state reactor core power levels not in excess of 2772 megawatts (thermal).
Prior to attaining the power level, Toledo Edison Company shall comply with the conditions identified in Paragraph (3) (o) below and complete the preoperational tests, startup tests and other items identified in Attachment 2 to this license in the sequence specified. Attachment 2 is an integral part of this license.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 277, are hereby incorporated in the license. FENOC shall operate the facility in accordance with the Technical Specifications.
(3) Additional Conditions The matters specified in the following conditions shall be completed to the satisfaction of the Commission within the stated time periods following the issuance of the license or within the operational restrictions indicated. The removal of these conditions shall be made by an amendment to the license supported by a favorable evaluation by the Commission:
(a) FENOC shall not operate the reactor in operational Modes 1 and 2 with less than three reactor coolant pumps in operation.
(b) Deleted per Amendment 6 (c) Deleted per Amendment 5 Amendment No. 277
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 277 TO FACILITY OPERATING LICENSE NO. NPF-3 FIRSTENERGY NUCLEAR OPERATING COMPANY FIRSTENERGY NUCLEAR GENERATION CORP.
DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 DOCKET NO. 50-346
1.0 INTRODUCTION
By letter to the Nuclear Regulatory Commission (NRC, the Commission) dated February 12, 2007, FirstEnergy Nuclear Operating Company, et al. (the licensee) requested changes to the technical specifications (TSs) for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS).
The proposed amendment would revise TS 3/4.9.4, Containment Penetrations, by adding a note which allows containment penetrations that provide direct access from the containment atmosphere to the outside atmosphere to be open during refueling activities, provided that appropriate administrative controls are established. The proposed changes are consistent with the NRC-approved TS Task Force (TSTF) Traveler TSTF-312-A, Revision 1.
2.0 REGULATORY EVALUATION
The NRC staff evaluated the impact of the proposed changes as they relate to the radiological consequences of affected design basis accidents (DBAs). For this license amendment request (LAR), the only affected DBA is the fuel handling accident (FHA) inside containment. The licensee has not submitted a revised FHA analysis. This LAR relies on the current design basis FHA as described in Section 15.4.7, of the DBNPS updated safety analysis report (USAR). For the current design basis FHA analysis, the licensee incorporates the source term as defined in Technical Information Document (TID) 14844, Atomic Energy Commission, U.S., 1962, Calculation of Distance Factors for Power and Test Reactors Sites. Therefore, the NRC staffs review is based on the regulatory guidance provided in NUREG-0800, AStandard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,@ Section 15.7.4, Radiological Consequences of Fuel Handling Accidents.
Since the licensee evaluated the FHA using the TID 14844 source term, the maximum dose criteria to the whole body and the thyroid that an individual at the exclusion area boundary can receive for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> following an accident, and at the low population zone outer boundary for the duration of the radiological release, are as specified in Title 10 of the Code of Federal Regulations (10 CFR) Part 100.11. These criteria are 25 roentgen equivalent man (rem) total whole body dose and 300 rem thyroid dose from iodine exposure. The accident dose criteria in 10 CFR 100.11 is supplemented by accident-specific dose acceptance criteria in SRP 15.7.4 which states that, The plant site and dose mitigating engineered safety feature systems are acceptable with respect to the radiological consequences of a postulated fuel handling accident if the calculated whole-body and thyroid doses at the exclusion area and low
population zone boundaries are well within the exposure guideline values of 10 CFR Part 100.11. Well within means 25 percent or less of the 10 CFR Part 100.11 exposure guideline values, i.e., 75 rem for the thyroid and 6 rem for the whole-body doses.
For control room dose consequence analyses that use the TID 14844 source term, the regulatory requirement for which the NRC staff bases its acceptance is General Design Criterion (GDC) 19 of Appendix A to 10 CFR Part 50, AControl Room@. GDC 19 requires that adequate radiation protection be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident. NUREG-0800, SRP Section 6.4, AControl Room Habitability System,@ Revision 2, July 1981, provides guidelines defining the dose equivalency of 5 rem whole body as 30 rem for both the thyroid and skin dose.
3.0 TECHNICAL EVALUATION
3.1 Description of TS revision The licensee has proposed a TS revision applicable to containment penetrations capable of closure by a manual or automatic isolation valve, blind flange, or equivalent. The proposed revision would allow the applicable containment building penetrations that provide direct access from the containment atmosphere to the outside atmosphere to be open during refueling activities, if appropriate, administrative controls are established. Currently, TS 3.9.4(c) requires that during core alterations or movement of irradiated fuel within the containment: Each penetration providing direct access from the containment atmosphere to the atmosphere outside containment shall be : (1) closed by a manual or automatic isolation valve, blind flange, or equivalent, or (2) be capable of being closed from the control room by an OPERABLE containment purge and exhaust valve upon receipt of a high radiation signal from the containment purge and exhaust system noble gas monitor.
The proposed change would allow containment penetration flow paths controlled by TS 3.9.4(c) to be open during operations involving core alterations or fuel movement inside containment if appropriate administrative controls are established and maintained. The proposed change would revise TS Limiting Condition for Operation 3.9.4, Containment Penetrations, and is consistent with NRC approved Technical Specification Task Force (TSTF) Traveler TSTF-312-A, Revision 1, Administratively Control Containment Penetrations, which was approved on August 16, 1999, and the corresponding note to the Babcock and Wilcox Owners Group Standard Technical Specification (STS) 3.9.3, "Containment Penetrations." TSTF-312-A was approved based on the condition that licensees using TSTF-312-A: (1) demonstrate acceptable radiological consequences from a FHA inside containment, and (2) commit to implementation of administrative procedures that ensure that open containment penetrations can and will be promptly closed in the event of an FHA inside containment.
The proposed amendment would add a note applicable to TS 3/4.9.4, Containment Penetrations, to allow penetrations included under TS 3.9.4(c) to be opened during core alterations or movement of irradiated fuel, under administrative controls. This class of penetrations includes those penetrations which provide direct access from the containment atmosphere to the atmosphere outside containment. Specifically, the proposed change would add the following note, applicable to TS 3.9.4(c): NOTE: Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere may be unisolated under administrative controls.
As part of the implementation of the proposed amendment, the licensee will revise applicable procedures to permit opening the affected penetrations during fuel movement as long as administrative controls are in place, to ensure prompt closure of the affected penetration in the event of a FHA. These controls will entail assignment of a designated individual who will be readily available to isolate the flow path in the event of a FHA. This individual may be a part of the team assigned to perform local leak rate testing of the associated penetration. The licensee states that the purpose of this change is to allow local leak rate testing of containment penetrations to be performed during refueling outages, while fuel movement is in progress. The licensee expects that this change will result in a reduction in future outage durations.
3.2. Technical basis for the TS revision DBNPS USAR section 15.4.7, Fuel Handling Accident, provides the results of the FHA analysis, performed in accordance with the assumptions and guidelines of Safety Guide 25, Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Handling and Storage Facility for Boiling and Pressurized Water Reactors, dated March 23, 1972. The licensees evaluation did not credit containment isolation, and is based on the release of the activity from one fuel assembly with a burnup of 60,000 megawatt-days per metric ton uranium (MWD/MTU). The release is assumed to occur over a two hour period. The results meet the acceptance criteria provided in SRP Section 15.7.4, and are well within the dose guidelines of 10 CFR 100.11.
DBNPS License Amendment No. 202 (Agencywide Documents and Management System Accession No. ML021210175) permitted both doors of the containment personnel air lock to be open during core alterations or movement of irradiated fuel in containment. Analyses performed in support of Amendment No. 202 are summarized in USAR section 15.4.7.3. These analyses calculated the control room dose for a FHA inside containment, assuming fuel activity consistent with a fuel assembly with 60,000 MWD/MTU burnup, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of fuel assembly decay, and no credit for removal of iodine activity by the control room emergency ventilation system.
As a part of the review of DBNPS License Amendment No. 202, the NRC staff completed an independent analysis of the potential radiological consequences of a FHA with the containment personnel air lock open, and determined that the results were within the acceptance criteria given in SRP Section 15.7.4 and GDC 19. The licensee asserts, and the NRC staff agrees, that the dose consequences of this change are bounded by the dose consequences of TS 3.9.4.b, which allows both personnel air lock doors to be open during core alterations or movement of irradiated fuel within the containment.
The proposed change will not impact the dose consequence of the licensing basis FHA, which is the only applicable DBA, because the proposed change will not result in changes to any of the values assumed in the radiological dose consequence analysis. The NRC staff has reasonable assurance that the requirements of 10 CFR 100.11, GDC 19, and the accident-specific dose criteria in SRP 15.7.4 will continue to be met for DBNPS. Therefore the NRC staff finds that the proposed change is acceptable from a radiological dose perspective.
In addition, the licensee proposed to reformat TS page 3/4 9-5 for proper pagination. This change is to correct the format/pagination of the TS document. This change is administrative in nature and is, therefore, acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Ohio State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
This amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluent that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration and there has been no public comment on such finding (72 FR 17949; April 10, 2007). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The NRC staff has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: John Parillo, NRR Date: October 17, 2007