8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan
ML072430311
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/2007
From: Burgess B
NRC/RGN-III/DRP/RPB6
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML072430311 (7)


Text

August 31, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Bezilla:

On August 14, 2007, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections as noted below.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. In addition to the program defined inspection activities, additional oversight activities will be conducted to follow up on the independent assessments in the areas of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The plan includes a component design bases inspection and a biennial PI&R inspection. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Davis Besse\Davis Besse 2007 MOC ltr.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PZurawski:dtp BBurgess DATE 08/22/07 08/22/07 OFFICIAL RECORD COPY

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION cc w/encl: The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Richard Anderson, Vice President, Nuclear Support - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:

TEB RAG1 SPS1 TJW2 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Davis-Besse DRPIII DRSIII PLB1 TXN

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type HD REPL - RPV HEAD DROP CALCULATIONS 1 IP 7111120 Refueling and Other Outage Activities 07/09/2007 11/18/2007 Baseline Inspections 95003 - 07 INDP ENG ASSESSMENT OBS 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 09/17/2007 09/21/2007 Supplemental Program 95003 - 07 INDP CAP RPT REVIEW 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/01/2007 10/05/2007 Supplemental Program BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 10/22/2007 11/30/2007 Baseline Inspections 95003 - 07 INDP SC/SCWE OBSERVATION 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 10/29/2007 11/02/2007 Supplemental Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 12/10/2007 12/14/2007 Baseline Inspections IP 7112202 Radioactive Material Processing and Transportation 12/10/2007 12/14/2007 Baseline Inspections BI ENG - ENGINEERING INSERVICE INSPECTION/ TI-150 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 01/01/2008 01/28/2008 Safety Issues IP 7111108P Inservice Inspection Activities - PWR 01/01/2008 01/28/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 2 IP 7112101 Access Control to Radiologically Significant Areas 01/07/2008 01/11/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 01/07/2008 01/11/2008 Baseline Inspections ORDER - 07 SC/SCWE REPORT REVIEW 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 02/04/2008 02/08/2008 Supplemental Program OL EXAM - DAVIS-BESSE INIT PREP 08/2007 3 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 01/28/2008 02/01/2008 Not Applicable BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 1 IP 7111402 Alert and Notification System Testing 02/25/2008 03/01/2008 Baseline Inspections IP 7111403 Emergency Response Organization Augmentation Testing 02/25/2008 03/01/2008 Baseline Inspections IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP01 Drill/Exercise Performance 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 02/25/2008 03/01/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 02/25/2008 03/01/2008 Baseline Inspections OL EXAM - DAVIS-BESSE INIT EXAM 09/2007 3 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 02/18/2008 02/29/2008 Not Applicable BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 03/03/2008 03/07/2008 Baseline Inspections

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type 95003 - INDEP OPS ASSESSMENT F/U 2 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 04/01/2008 09/30/2008 Supplemental Program 95003 - INDP ENGR ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 04/01/2008 09/30/2008 Supplemental Program BI PI&R - BIENNIAL PI&R INSPECTION 3 IP 71152B Identification and Resolution of Problems 04/21/2008 05/09/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 05/26/2008 05/30/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 05/26/2008 05/30/2008 Baseline Inspections BI ENG - ENGINEERING MODIFICATIONS / 50.59 INSP. 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/02/2008 06/20/2008 Baseline Inspections IP 7111117B Permanent Plant Modifications 06/02/2008 06/20/2008 Baseline Inspections 95003 - INDEP CAP ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 07/01/2008 12/31/2008 Supplemental Program 95003 - INDP SC/SCWE ASSESS. F/U 1 IP 95003 Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 07/01/2008 12/31/2008 Supplemental Program BI ENG - BIENNIAL HEAT SINK INSPECTION 1 IP 7111107B Heat Sink Performance 08/25/2008 08/29/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 09/01/2008 09/05/2008 Baseline Inspections IP 7112102 ALARA Planning and Controls 09/01/2008 09/05/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 09/01/2008 09/05/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 09/01/2008 09/05/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 11/10/2008 11/14/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 11/24/2008 11/28/2008 Baseline Inspections