8/31/07 Davis-Besse - Mid-Cycle Performance Review and Inspection Plan
ML072430311
Person / Time
Site: Davis Besse 
Issue date: 08/31/2007
From: Burgess B
NRC/RGN-III/DRP/RPB6
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML072430311 (7)


Text

August 31, 2007 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Bezilla:

On August 14, 2007, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections as noted below.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. In addition to the program defined inspection activities, additional oversight activities will be conducted to follow up on the independent assessments in the areas of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The plan includes a component design bases inspection and a biennial PI&R inspection. The inspections scheduled within the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page

M. Bezilla In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9629 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\\Branch TSS\\ALL MOC\\midcycle 2006 to 2007\\Davis Besse\\Davis Besse 2007 MOC ltr.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME PZurawski:dtp BBurgess DATE 08/22/07 08/22/07 OFFICIAL RECORD COPY

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION cc w/encl:

The Honorable Dennis Kucinich J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and Chief Operating Officer - FENOC Richard Anderson, Vice President, Nuclear Support - FENOC Manager - Site Regulatory Compliance - FENOC D. Pace, Senior Vice President of Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight - FENOC D. Jenkins, Attorney, FirstEnergy Corp.

Director, Fleet Regulatory Affairs - FENOC Manager - Fleet Licensing - FENOC Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

Letter to M. Bezilla from B. Burgess dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION DISTRIBUTION:

TEB RAG1 SPS1 TJW2 RidsNrrDirslpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Davis-Besse DRPIII DRSIII PLB1 TXN

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1

HD REPL

- RPV HEAD DROP CALCULATIONS Baseline Inspections 07/09/2007 11/18/2007 7111120 IP Refueling and Other Outage Activities 1

95003

- 07 INDP ENG ASSESSMENT OBS Supplemental Program 09/17/2007 09/21/2007 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 1

95003

- 07 INDP CAP RPT REVIEW Supplemental Program 10/01/2007 10/05/2007 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 6

BI ENG

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/22/2007 11/30/2007 7111121 IP Component Design Bases Inspection 1

95003

- 07 INDP SC/SCWE OBSERVATION Supplemental Program 10/29/2007 11/02/2007 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 2

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 12/10/2007 12/14/2007 7112202 IP Radioactive Material Processing and Transportation 1

BI ENG

- ENGINEERING INSERVICE INSPECTION/ TI-150 Safety Issues 01/01/2008 01/28/2008 2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA Baseline Inspections 01/01/2008 01/28/2008 7111108P IP Inservice Inspection Activities - PWR 2

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 01/07/2008 01/11/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/07/2008 01/11/2008 7112102 IP ALARA Planning and Controls 1

ORDER

- 07 SC/SCWE REPORT REVIEW Supplemental Program 02/04/2008 02/08/2008 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 3

OL EXAM

- DAVIS-BESSE INIT PREP 08/2007 Not Applicable 01/28/2008 02/01/2008 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 1

BI EP

- EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 02/25/2008 03/01/2008 7111402 IP Alert and Notification System Testing Baseline Inspections 02/25/2008 03/01/2008 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/25/2008 03/01/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/25/2008 03/01/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/25/2008 03/01/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/25/2008 03/01/2008 71151-EP03 IP Alert & Notification System 3

OL EXAM

- DAVIS-BESSE INIT EXAM 09/2007 Not Applicable 02/18/2008 02/29/2008 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/03/2008 03/07/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment

Davis-Besse Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 2

95003

- INDEP OPS ASSESSMENT F/U Supplemental Program 04/01/2008 09/30/2008 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 1

95003

- INDP ENGR ASSESS. F/U Supplemental Program 04/01/2008 09/30/2008 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 3

BI PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 04/21/2008 05/09/2008 71152B IP Identification and Resolution of Problems 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 05/26/2008 05/30/2008 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 05/26/2008 05/30/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 2

BI ENG

- ENGINEERING MODIFICATIONS / 50.59 INSP.

Baseline Inspections 06/02/2008 06/20/2008 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 06/02/2008 06/20/2008 7111117B IP Permanent Plant Modifications 1

95003

- INDEP CAP ASSESS. F/U Supplemental Program 07/01/2008 12/31/2008 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 1

95003

- INDP SC/SCWE ASSESS. F/U Supplemental Program 07/01/2008 12/31/2008 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple 1

BI ENG

- BIENNIAL HEAT SINK INSPECTION Baseline Inspections 08/25/2008 08/29/2008 7111107B IP Heat Sink Performance 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/01/2008 09/05/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/01/2008 09/05/2008 7112102 IP ALARA Planning and Controls Baseline Inspections 09/01/2008 09/05/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 09/01/2008 09/05/2008 71151-OR01 IP Occupational Exposure Control Effectiveness 2

BI OL

- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 11/10/2008 11/14/2008 7111111B IP Licensed Operator Requalification Program 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/24/2008 11/28/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems