Letter Sequence Meeting |
---|
TAC:MD6398, Increase Flexibility in Mode Restraints, Addition of LCO 3.0.8, Inoperability of Snubbers, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec, Changes to Reflect Revision of 10 CFR 50.55A, Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Correct Example 1.4-1, Containment Structural Integrity, TSTF-28, Correct LCO 3.0.6 Bases, Add Restriction for Lowest LOOP Tave During Mode 2 Physics Testing (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement
Results
Other: L-08-161, Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.0, L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs, L-08-338, Copy of Improved Technical Specifications (ITS), L-08-378, Implementation of Improved Technical Specification Amendment No. 279, ML073531253, ML081350505, ML082000451, ML082270661, ML082270662, ML082270663, ML082270664, ML082270665, ML082270666, ML082270667, ML082270669, ML082270670, ML082600577, ML082840099, ML082900630, ML082900882, ML082910125
|
MONTHYEARML0725600462007-09-11011 September 2007 9/11/2007-Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) - 9/11/2007 NRC Meeting Slides Project stage: Meeting ML0725600562007-09-12012 September 2007 9/12/2007 Meeting to Discuss Davis-Besse License Amendment Request for Conversion to Improved Technical Specifications (ITS) 9/12/2007 NRC Meeting Slides Project stage: Meeting ML0729001172007-11-0707 November 2007 09/12/2007 - Meeting Summary with Fenco to Discuss Licensee'S ITS Conversion License Amendment Request for Davis-Besse Project stage: Meeting ML0735312532008-02-0404 February 2008 Improved Technical Specification Conversion Project stage: Other ML0814804652008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 5, (Revision 1), Section 3.0 - LCO and SR Applicability Project stage: Request ML0801400252008-05-16016 May 2008 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for a Hearing (Tac Nos. MD6319-MD3622, MD6324-MD6333, MD6398-MD6403, MD6644-MD6649, and MD6684) Project stage: Acceptance Review L-08-161, Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.02008-05-16016 May 2008 Copy of Applicable Portions of the NRC and Davis-Besse Improved Technical Specifications Conversion Website - Sections 3.0, 3.1, 3.2, 3.4, and 3.6 and Chapter 4.0 Project stage: Other L-08-159, Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD63982008-05-16016 May 2008 Supplement to License Amendment Request: Conversion of Current Technical Specifications (CTS) to Improved Technical Specifications (ITS) - Volumes 5, 6, 7, 9, 11, and 15, TAC No. MD6398 Project stage: Supplement ML0814804712008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 15, (Revision 1), Chapter 4.0 - Design Features Project stage: Request ML0814804692008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 11, (Revision 1), Section 3.6 - Containment Systems Project stage: Request ML0814804682008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 9, (Revision 1), Section 3.4 - Reactor Coolant System (RCS) Project stage: Request ML0814804672008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 7, (Revision 1), Section 3.2 - Power Distribution Limits Project stage: Request ML0814804662008-05-16016 May 2008 Improved Technical Specification Conversion License Amendment Request, Volume 6, (Revision 1), Section 3.1 - Reactivity Control Systems Project stage: Request ML0826005772008-05-30030 May 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website Project stage: Other ML0813505052008-06-17017 June 2008 Improved Technical Specifications Conversion Milestone Schedule Project stage: Other ML0815705882008-06-18018 June 2008 Request for Additional Information Related to Improved Technical Specifications Conversion Project stage: RAI ML0816503642008-06-20020 June 2008 RAI Related to Improved Technical Specifications Conversion Project stage: RAI L-08-221, Response to Request for Additional Information Related to Improved Technical Specifications Conversion2008-07-23023 July 2008 Response to Request for Additional Information Related to Improved Technical Specifications Conversion Project stage: Response to RAI ML0822706582008-08-0707 August 2008 Supplement to License Amendment Request: Conversion of Current Technical Specifications to Improved Technical Specifications - Volumes 1, 2, 3, 4, 8, 10, 12, 13, 14, and 16 Project stage: Supplement L-08-240, Improved Technical Specification Conversion License Amendment Request, Volume 14, Revision 1, ITS Section 3.9, Refueling Operations2008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 14, Revision 1, ITS Section 3.9, Refueling Operations Project stage: Request ML0822706612008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 1, Revision 1, Application of Selection Criteria to the Dbnps Technical Specifications Project stage: Other ML0822706622008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 2, Revision 1, Generic Determination of No Significant Hazards Consideration and Environmental Assessment Project stage: Other ML0822706672008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 16, Revision 1, ITS Chapter 5.0, Administrative Controls Project stage: Other ML0822706702008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 13, Revision 1, ITS Section 3.8, Electrical Power Systems Project stage: Other ML0822706692008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 12, Revision 1, ITS Section 3.7, Plant Systems Project stage: Other ML0822706662008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 10, Revision 1, ITS Section 3.5, Emergency Core Cooling Systems Project stage: Other ML0822706652008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 8, Revision 1, Section 3.3 - Instrumentation Project stage: Other ML0822706642008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request, Volume 4, Revision 1, ITS Chapter 2.0, Safety Limits Project stage: Other ML0822706632008-08-0707 August 2008 Improved Technical Specification Conversion License Amendment Request Volume 3, Revision 1, ITS Chapter 1.0, Use and Application Project stage: Other L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs Project stage: Other L-08-224, Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its.2008-09-0303 September 2008 Response to Request for Additional Information License Amendment Request to Convert Current Technical Specifications (CTS) to Improved Technical Specifications (Its), and Copy of Two Questions from NRC and Davis-Besse Its. Project stage: Response to RAI ML0824903002008-10-0202 October 2008 ITSB Draft R, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902622008-10-0202 October 2008 Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD Project stage: Draft Approval ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion Project stage: Draft Other ML0824902752008-10-0202 October 2008 Draft a, Attachment to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902802008-10-0202 October 2008 ITSB Draft La, to Davis Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902892008-10-0202 October 2008 ITSB Draft L, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0824902952008-10-0202 October 2008 ITSB Draft M, to Davis-Besse Amendment Conversion Improved Technical Specifications with Beyond Scope Issues Project stage: Draft Other ML0828400992008-10-0808 October 2008 Assessment -Davis-Besse Nuclear Power Station, Unit No. 1 - Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications (TAC 6398) Project stage: Other ML0820004512008-10-0808 October 2008 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications Project stage: Other L-08-338, Copy of Improved Technical Specifications (ITS)2008-10-21021 October 2008 Copy of Improved Technical Specifications (ITS) Project stage: Other ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues Project stage: Acceptance Review ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues Project stage: Acceptance Review ML0829008822008-11-20020 November 2008 ITSB LA-Removed Details - Attachment to Davis-Besse Beyond Scope Issues Project stage: Other ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues Project stage: Other ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues Project stage: Other ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues Project stage: Acceptance Review ML0829006002008-11-20020 November 2008 Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues Project stage: Approval L-08-378, Implementation of Improved Technical Specification Amendment No. 2792008-12-16016 December 2008 Implementation of Improved Technical Specification Amendment No. 279 Project stage: Other 2008-02-04
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24248A2332024-09-0505 September 2024 Summary of the August 29, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML23152A2552023-06-0505 June 2023 Summary of the May 17, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML22178A2312022-06-28028 June 2022 Summary of the June 22, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Davis Besse Nuclear Power Station ML22088A1972022-03-30030 March 2022 Summary of March 11, 2022, Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22084A1022022-03-27027 March 2022 Reissue Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML22077A8062022-03-23023 March 2022 Summary of the February 1, 2022, Regulatory Conference Between Energy Harbor, Davis-Besse Nuclear Power Station and the Nuclear Regulatory Commission ML21314A5362021-11-18018 November 2021 Summary of November 8, 2021, Meeting with Energy Harbor Nuclear Corp. Regarding Its Proposed Alternate for Examination of Steam Generator Welds at ML21180A4632021-06-29029 June 2021 Summary of the June 22, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML20240A2942020-08-27027 August 2020 July 23, 2020 Summary of Public Webinar to Discuss the Nrc 2019 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station and the Perry Nuclear Power Plant ML19249C7112019-09-0404 September 2019 Summary of the July 18, 2019 Public Outreach/Open House to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of the Davis-Besse Nuclear Power Station ML18313A1982018-11-14014 November 2018 Summary of Meeting with Firstenergy Nuclear Operating Company Regarding Planned Submittal of Post-Shutdown Emergency Plan for Davis-Besse Nuclear Power Station ML18192A6522018-07-10010 July 2018 Summary of Public Meeting to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17258A1462017-09-20020 September 2017 Summary of September 12, 2017, Meeting with Firstenergy Nuclear Operating Company Regarding Its Licensing Amendment Request to Adopt National Fire Protection Association Standard 805 at Davis-Besse Nuclear Power Station, Unit No. 1 ML17229B1362017-08-16016 August 2017 Summary of July 19, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Power Station ML17087A1882017-03-28028 March 2017 Summary of Closed Meeting with Firstenergy Nuclear Operating Company Regarding Changes to the Davis-Besse Nuclear Power Station, Unit No. 1, Security Plan ML16197A0522016-07-14014 July 2016 Summary of June 21, 2016, Public Meeting with Firstenergy Nuclear Operating Company to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Davis-Besse Nuclear Station ML16130A7502016-05-12012 May 2016 Summary of April 12, 2016, Teleconference Regarding Steam Generator Tube Inservice Inspection ML14177A5782016-02-22022 February 2016 November 13, 2013, Summary of Meeting with Firstenergy Nuclear Operating Company to Discuss Delay in Submittal of Fire Risk Reduction Amendment Request ML16006A3512016-01-20020 January 2016 December 17,2015 Summary of Meeting with Firstenergy Nuclear Operating Company on Its License Amendment Request to Revise the Emergency Diesel Generator Surveillance Requirements at Davis-Besse Nuclear Power Station, Unit 1 ML16007A3962016-01-12012 January 2016 Summary of January 5, 2016, Meeting with Firstenergy Nuclear Operating Company on Its Planned License Amendment Request to Revise the Emergency Action Level Scheme at Davis-Besse Nuclear Power Station, Unit No. 1 ML15196A5162015-07-24024 July 2015 Summary of Telephone Conference Call Held on May 06, 2015, and May 19, 2015 Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML15170A2862015-06-18018 June 2015 Summary of the Public Open House Regarding Davis-Besse Nuclear Power Station ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15056A4562015-04-20020 April 2015 Summary of Teleconference Call Held February 20, 2015, Between U.S. Nuclear Regulatory Commission and First Energy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML14325A7782014-12-16016 December 2014 October 6, 2014, Summary of Pre-Application Meeting with Firstenergy Nuclear Operating Company to Discuss Proposed Combination of Site Emergency Plans ML14224A6142014-08-12012 August 2014 Summary of Public Meeting to Discuss the 2013 Performance of Davis-Besse Nuclear Power Station ML14160B1032014-07-10010 July 2014 June 6, 2014 Summary of Meeting with FENOC Flooding Hazard Reevaluation Extension Request for Beaver Valley Power Station, Units 1 and 2 and Flooding Hazard Reevaluation Report for Davis-Besse Nuclear Power Station, Unit 1 ML14099A4642014-05-0606 May 2014 Summary of Public Meetings to Discuss Draft Supplement 52 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Davis-Besse Nuclear Generating Station, Unit 1 ML14099A3392014-04-22022 April 2014 March 27, 2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and First Energy Nuclear Operating Company Concerning Commitment 13 of the Safety Evaluation Report Pertaining to the Davis Besse Unit 1, Licens ML14080A1842014-03-21021 March 2014 Summary of Webinar Meeting to Discuss NRC Inspection Activities Associated with the Davis-Besse Nuclear Power Station Installation of Two New Steam Generators ML13240A0702013-08-29029 August 2013 8 22 2013 DB NRC Telecon Summary License Condition ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13182A4082013-07-17017 July 2013 Summary of Telephone Conference Call Held on October 16, 2012, Between NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA (TAC No. ME640) ML13197A2572013-07-17017 July 2013 5 28 2013 DB Hs Bolts Telecon Summary ML13149A2862013-07-12012 July 2013 Summary of Telephone Conference Call Held on May 2, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station License Renewal Application ML13182A4432013-07-12012 July 2013 Summary of Telephone Conference Call Held on April 11, 2013, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Powe ML13149A2882013-07-0909 July 2013 May 9, 2013, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Stat ML13168A2422013-06-14014 June 2013 6/11/2013 - Summary of Open House to Discuss the 2012 Davis-Besse Nuclear Power Station End-Of-Cycle Performance ML13091A3272013-03-29029 March 2013 Summary of Public Meeting to Discuss the Davis-Besse Replacement Activities ML13051A0682013-03-26026 March 2013 January 16, 2013 Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company ML13051A6602013-03-26026 March 2013 Summary of Telephone Conference Call Held on January 23, 2013, Between the NRC and FENOC, Concerning RAI Pertaining to the Davis-Besse Nuclear Power Station, LRA ML13025A0272013-02-14014 February 2013 October 23, 2012 Summary of Telephone Conference Call Held Between the Nuclear Regulatory and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station, License ML12277A4082012-10-0303 October 2012 September 26, 2012, Summary of Public Meeting to Discuss FENOC Fleet Performance ML12243A2832012-08-30030 August 2012 Summary of Public Meeting to Discuss Nrc'S Review of Fenoc'S Root Cause Analysis of Davis-Besse Shield Building Cracks ML12237A0432012-08-24024 August 2012 August 15, 2012 - Summary of Public Meeting to Discuss the Davis-Besse Nuclear Power Station, Unit 1, End-Of-Cycle Plant Performance Assessment ML12165A3502012-07-16016 July 2012 Summary of Conference Call for Stream Generator Tube Inservice Inspections for Spring 2012 Refueling Outage ML12195A1132012-07-16016 July 2012 Summary of Public Meeting with FENOC Regarding Licensing Practices and Processes ML12052A1792012-05-15015 May 2012 July 19, 2011, Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power Station ML12061A2582012-04-0202 April 2012 Summary of Telephone Conference Call Held on July 12,2011, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Power ML12059A0782012-04-0202 April 2012 Summary of Telephone Conference Call Held on February 9, 2012, Between the U.S. Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company Concerning Requests for Additional Information Pertaining to the Davis-Besse Nuclear Pow 2024-09-05
[Table view] |
Text
November 7, 2007 LICENSEE: FirstEnergy Nuclear Operating Company (FENOC)
FACILITY: Davis-Besse Nuclear Power Station, Unit No. 1
SUBJECT:
SUMMARY
OF SEPTEMBER 11 B 12, 2007, MEETING WITH FENOC TO DISCUSS THE LICENSEE=S IMPROVED TECHNICAL SPECIFICATION CONVERSION LICENSE AMENDMENT REQUEST DATED AUGUST 3, 2007 (TAC NO. MD6398)
On September 11, 2007, and September 12, 2007, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of FirstEnergy Nuclear Operating Company (FENOC) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee=s August 3, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072200448), license amendment request for conversion to improved technical specifications (ITSs) for Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). A list of attendees is provided as Enclosure 1.
On the first day of the meeting, the NRC staff presented information concerning the ITS conversion in-scope items and beyond-scope items (BSIs), pending application acceptance review items, preliminary project schedule and milestones, and the project plan revision process.
(See ADAMS Accession No. ML072560046 for the NRC=s Day 1 slide presentation).
The licensee and NRC agreed on the preliminary project schedule with the understanding that, since the NRC=s work planning had not yet been completed, it does not include the BSI=s that have already been identified and any additional BSIs that may be discovered during the review.
It was understood that this could impact the current schedule dates. The NRC staff stated that NRC will provide a more detailed schedule so the licensee will know when to expect the issuance of final requests for additional information (RAIs) for each section.
The licensee advised that, during the month of January, 2008, DBNPS will be in a refueling outage, which may challenge the RAI response turnaround due to limited resources. However, the licensee stated that they will still be able to provide some support using core ITS members.
The NRC and licensee agreed to conduct bi-weekly status calls throughout the project.
On the second day of the meeting, the NRC staff presented training materials for the staff=s utilization of the ITS question and answer database. (See ADAMS Accession No. ML072560056 for the NRC=s Day 2 slide presentation).
Members of the public were not in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
/RA/
Thomas J. Wengert Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
- 1. List of Attendees cc w/encl: See next page
Please direct any inquiries to me at 301-415-4037, or tjw2@nrc.gov.
/RA/
Thomas J. Wengert Plant Licensing Branch LPLIII-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
- 1. List of Attendees cc w/encl: See next page Distribution PUBLIC MHamm, NRR RClark, NRR LPL3-2 R/F ALising, NRR MHart, NRR RidsNrrDorlLpl3-2 WCartwright, NRR MMcConnell, NRR RidsNrrDorl DJackson, NRR GWilson, NRR RidsNrrDirsItsb RTelson, NRR WKemper, NRR RidsNrrPMTWengert CSchulten, NRR GCranston, NRR RidsNrrLAEWhitt RGrover, NRR RidsOgcRp GWaig, NRR RidsAcrsAcnwMailCenter JPaige, NRR TBloomer, EDO, Region III TKolb, NRR RidsRgn3MailCenter ALewin, NRR Package Accession Number ML072560043 Meeting Summary Accession Number ML072900117 Slides Accession Numbers ML072560046 and ML072560056 OFFICE LPL3-2/PM LPL3-2/LA DIRS/ITSB/BC LPL3-2/BC NAME TWengert EWhitt TKobetz RGibbs DATE 10 / 22 /2007 10 / 22 /2007 10 / 24 /2007 11 / 07 /2007 OFFICIAL RECORD COPY
LIST OF ATTENDEES CATEGORY 1 MEETING WITH FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC), ET AL.
LICENSE AMENDMENT APPLICATION FOR IMPROVED TECHNICAL SPECIFICATION CONVERSION FOR DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO. 1 SEPTEMBER 11/12, 2007 NAME ORGANIZATION
- 1. T. Wengert NRC
- 2. C. Schulten NRC
- 3. A. Lising NRC
- 4. M. Hamm NRC
- 5. R. Grover NRC
- 6. W. Cartwright NRC
- 7. J. Paige NRC
- 8. D. Jackson NRC
- 9. G. Waig NRC
- 10. R. Gibbs NRC
- 11. T. Kobetz NRC
- 12. T. Kolb NRC
- 13. A. Lewin NRC
- 14. R. Clark NRC
- 15. M. Hart NRC
- 16. M. McConnell NRC
- 17. G. Wilson NRC
- 18. R. Telson NRC
- 19. B. Kemper NRC
- 20. G. Cranston NRC
- 21. T. Lentz FENOC
- 22. R. Scheile EXCEL
- 23. R. Lakis FENOC
- 24. W. Bentley FENOC Enclosure
Davis-Besse Nuclear Power Station, Unit No. 1 cc:
Manager, Site Regulatory Compliance Columbus, OH 43216 FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station President, Board of County Mail Stop A-DB-3065 Commissioners of Ottawa County 5501 North State Route 2 Port Clinton, OH 43252 Oak Harbor, OH 43449-9760 President, Board of County Director, Ohio Department of Commerce Commissioners of Lucas County Division of Industrial Compliance One Government Center, Suite 800 Bureau of Operations & Maintenance Toledo, OH 43604-6506 6606 Tussing Road P.O. Box 4009 The Honorable Dennis J. Kucinich Reynoldsburg, OH 43068-9009 United States House of Representatives Washington, D.C. 20515 Resident Inspector U.S. Nuclear Regulatory Commission The Honorable Dennis J. Kucinich 5503 North State Route 2 United States House of Representatives Oak Harbor, OH 43449-9760 14400 Detroit Avenue Lakewood, OH 44107 Stephen Helmer Supervisor, Technical Support Section Joseph J. Hagan Bureau of Radiation Protection President and Chief Nuclear Officer Ohio Department of Health FirstEnergy Nuclear Operating Company 35 East Chestnut Street, 7th Floor Mail Stop A-GO-14 Columbus, OH 43215 76 South Main Street Akron, OH 44308 Carol O=Claire, Chief, Radiological Branch Ohio Emergency Management Agency David W. Jenkins, Attorney 2855 West Dublin Granville Road FirstEnergy Corporation Columbus, OH 43235-2206 Mail Stop A-GO-15 76 South Main Street Zack A. Clayton Akron, OH 44308 DERR Ohio Environmental Protection Agency Danny L. Pace P.O. Box 1049 Senior Vice President, Fleet Engineering Columbus, OH 43266-0149 FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 State of Ohio 76 South Main Street Public Utilities Commission Akron, OH 44308 180 East Broad Street Columbus, OH 43266-0573 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Attorney General Mail Stop A-GO-2 Office of Attorney General 76 South Main Street 30 East Broad Street Akron, OH 44308
Davis-Besse Nuclear Power Station, Unit 1 cc:
Director, Fleet Regulatory Affairs FirstEnergy Nuclear Operating Company Mail Stop A-GO-2 76 South Main Street Akron, OH 44308 Jeannie M. Rinckel Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 Richard Anderson Vice President, Nuclear Support FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308 James H. Lash Senior Vice President of Operations and Chief Operating Officer FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 76 South Main Street Akron, OH 44308