Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML0422302072 August 2004Oconee
Mcguire
Catawba
McGuire
Duke Energy Corp Topical Report, Quality Assurance Program, Revision 33 - Catawba, McGuire & Oconee Nuclear Station
ML04174071910 June 2004Oconee
Mcguire
Catawba
McGuire
Duke Power Company, Quality Assurance Program Topical Report, Revision 32
ML20138H13431 December 1996WaterfordAdvises That Waterford 3 Annual Exercise for 1997 Scheduled for 971105
ML20133A52526 December 1996WaterfordSubmits Revised Tech Spec Change Request Re 3/4.8.1, Electrical Power Systems - AC Sources, Per 961007 & 1204 Telcons W/Nrc
ML20133A19926 December 1996WaterfordResponds to NRC Ltr Re Violations Noted in Insp Rept 50-382/96-24.Corrective Actions:Upon Discovery,Calculations Were Performed to Include Additional Makeup Requirements
ML20132G87120 December 1996WaterfordRequests NRC Review & Approval of Proposed Change to Basemat Monitoring Program
ML20132C06113 December 1996WaterfordResponds to NRC Ltr Re Violations Noted in Insp Rept 50-382/96-12.Corrective Actions:Operations Manager Held Meeting W/Operations Personnel on 961123 to Discuss Personnel Errors Occurring in Operations Dept
ML20135F75310 December 1996WaterfordSubmits Tornado Missile Protection for Ultimate Heat Sink Update
ML20132B94430 November 1996WaterfordMonthly Operating Rept for Nov 1996 for Waterford 3 Ses
ML20134K98315 November 1996WaterfordIdentifies & Describes Containment Penetrations That Include Remote Manual Containment Isolation Valves That Were Determined by Waterford 3 Not to Have Closed Safety Function.Nrc Review & Evaluation of Info,Requested
ML20134K54431 October 1996WaterfordMonthly Operating Rept for Oct 1996 for Waterford 3 Ses
ML20134E38830 October 1996WaterfordAdvises That Written Summary Rept Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions within 120 Days
ML20134E14329 October 1996WaterfordSummarizes Current Licensing Position & Provides Interim Measures W/Respect to Isolation of Preliminary Action Plan for air-operated Isolation Valves,In Response to Special Insp of Containment Penetrations
ML20129G31128 October 1996Arkansas Nuclear
River Bend
Waterford
Requests Exemption from 10CFR50.55a Requiring Licensee to Adopt Specific Procedures for Isi,Repair & Replacement of Class Mc & Class CC Metallic & Concrete Containment Components
ML20129G18628 October 1996WaterfordResponds to NRC Re Violations Noted in Insp Rept 50-382/95-23.C/As:commitment Change Was Discussed with Waterford 3 NRC Region IV Branch Chief During Conference Call on 960912
ML20129E93224 October 1996WaterfordProvides Response to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks
ML20129C61521 October 1996WaterfordDiscusses Technical Issues,Principals & Concepts on Design & Licensing Basis of Waterford 3 Re Tornado Missile Protection for Ultimate Heat Sink.Basis for Evaluations Performed,Provided
ML20129B96121 October 1996WaterfordSubmits Response to Violations Noted in Insp Rept 50-382/96-11.Corrective Actions:Operations Mgt Reviewed Event W/Operations Crew That on Shift When ACCW Pump B Inadvertently Started
ML20129B95318 October 1996WaterfordInforms That Aj Harris Individual Currently Included in NRC Operator Licensing Tracking Sys Who No Longer Requires SRO License at Plant
ML20128Q96417 October 1996WaterfordForwards Rev 8 to EP-002-051, Offsite Dose Assessment. W/O Encl
ML20128R11617 October 1996WaterfordForwards Rev 20 to EP-001-010, Unusual Event,Rev 23 to EP- 001-020, Alert, Rev 22 to EP-001-030, Site Area Emergency & Rev 23 to EP-001-040, General Emergency. W/O Encl
ML20128Q93316 October 1996WaterfordSubmits Comments for Consideration Re Generic Fundamentals Exam
ML20128M36110 October 1996WaterfordSubmits 12-month Special Rept SR-96-002-00 of SG Eddy Current Exam for 7th Refueling,Per TS 4.4.4.5.b & 6.9.2
ML20128G2453 October 1996WaterfordProvides NRC W/Status of Plant Actions to Address Recent Concern Involving Discovery of Suspect/Missing Fasteners on safety-related Mov,Per 961002 Request
ML20128P99230 September 1996WaterfordMonthly Operating Rept for Sept 1996 for Waterford 3 Ses
ML20129D47625 September 1996WaterfordForwards Rev 6 to Security Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790(d)(1))
ML20134C19324 September 1996WaterfordSubmits Original Three Copies of Affected Pages of Physical Security Plan,Rev 17.Encl Withheld
ML20117L18411 September 1996WaterfordRequests Approval to Delete Code Required VT-2 Exam for Addl Class 3 Components as Defined by ASME Section XI,1980 Edition,Winter 1981 Addenda,Exam Category D-A
ML20117L16311 September 1996WaterfordInforms That Rj Ciminel Currently Included in Us NRC Operator Licensing Tracking Sys,No Longer Requires SRO License at Plant
ML20117K97310 September 1996WaterfordFollow-up Part 21 Rept of Re Failures of Waterford 3 Dedication Testing Process of Seven Commercial Grade Barksdale Pressure Switches
ML20117K2515 September 1996WaterfordResponds to NRC Ltr Re Violations Noted in Insp Rept 50-382/96-10.Corrective Actions:Standing Instruction 96-10 Was Issued to Operations Personnel W/Listed Info
ML20129A68531 August 1996WaterfordMonthly Operating Rept for Waterford 3 Ses for Aug 1996
ML20117E64328 August 1996WaterfordForwards fitness-for-duty Performance Data for Period 960101-0630
ML20117D47126 August 1996WaterfordRevises Service List Used for All Correspondence from NRC to Entergy for Plant Due to Recent Organizational Changes
ML20117A55222 August 1996WaterfordInforms Waterford 3 Agreed to Supply SE Upon Final Approval.Se Was Reviewed & Approved on 960728
ML20116M76719 August 1996WaterfordResponds to Violations Noted in Insp Rept 50-382/96-05.C/A: Dispatched Control Room Supervisor & RAB Watch to Verify Correct Position of Fuel Rack Override Lever & Issued Memo Reinforcing Expectations Re Operation of Plant Equipment
ML20116L52715 August 1996WaterfordForwards Comments on Review of Preliminary Accident Sequence Precursor Analysis
ML20116K72913 August 1996WaterfordResponds to Violations Noted in Insp Rept 50-382/96-15. Corrective Actions:Addressed Individuals Re Operations Control,Worker Performance & Supervision
ML20116H2507 August 1996WaterfordRequests Extension of Due Date to 960930 Re Rev of Administrative Procedure OP-100-010
ML20116E3941 August 1996WaterfordResponds to RAI Re GL 95-07, Pressure Locking and Thermal Binding of Safety-Related Power-Operated Valves
ML20116E5841 August 1996WaterfordResponds to Re Spent Fuel Survey Commitments for Waterford Steam Electric Station,Unit 3
ML20116L04331 July 1996WaterfordMonthly Operating Rept for Jul 1996 for Waterford 3
ML20116E58031 July 1996WaterfordAddresses Physical Fitness Evaluation of Security Personnel. Util After Reviewing Alternative Methods Has Substituted Previous Portions of Test Deemed Unsafe W/Simulated Testing Using Devices Such as Treadmills & Stair Climbers
ML20116D56831 July 1996WaterfordForwards Results of 1996 Survey of Toxic Chemicals Stored, Processed or Transported in Vicinity of Waterford 3 & Results of 1996 Survey & Analysis of Pipelines & Explosive Hazards in Vicinity of Waterford 3
ML20116C70329 July 1996WaterfordPart 21 Rept Re Failures Identified by Waterford 3 Dedication Testing Process of 7 Commercial Grade Barksdale Pressure Switches
ML20116B07725 July 1996WaterfordSubmits Response to Emergency Preparedness Weakness Documented in NRC Insp Rept 50-382/96-06 & Provides Info Re follow-up Item & Other Observations Noted in Insp Rept
ML20115G59718 July 1996WaterfordSubmits Request to Delete Surface Exam of Reactor Pressure Vessel Re Support Integral Attachment Welds Relief Request ISI-017
ML20115G53018 July 1996WaterfordProvides NRC W/Confirmation of Committment Re Changes to Rev 16 of Physical Security Plan
ML20115F50616 July 1996WaterfordDockets Request to Commit NRC Resources for Review of Waterford 3 Power Uprate License Amend & Confirm 960723 Meeting to Discuss Scope for Project
ML20115F40315 July 1996WaterfordForwards Rev 16 to EP-003-070, Emergency Communications Sys Routine Testing. Procedure Rev Does Not Decrease Effectiveness of Plan