ML20134C193

From kanterella
Jump to navigation Jump to search
Submits Original Three Copies of Affected Pages of Physical Security Plan,Rev 17.Encl Withheld
ML20134C193
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/24/1996
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-96-0165, W3F1-96-165, NUDOCS 9609260030
Download: ML20134C193 (2)


Text

1 8 Entergy Oper:ti:ns. Inc.

Miona LA 70066 l Tel 504 739 6242 James J. Fisicaro e $*a*

I W3F1-96-0165 i A4.05 l PR September 24,1996 SAFEGUARDS INFORMATION I

U.S. Nuclear Regulatory Commission "THIS LETTER NOT SUBJECT TO  !

ATTN: Document Control Desk PROTECTIVE REQUIREMENTS Washington, D.C. 20555 WHEN SEPARATED FROM MATERIAL CONTAINING

Subject:

Waterfo4 3 SES SAFEGUARDS INFORMATION".

Docket No. 50-382 License No. NPF-38 l Physical Security Plan Revision 17 Gentlemen:

In accordance with 10CFR50.54(p), Entergy Operations, Inc. hereby submits the original and three copies of the affected pages of the Physical Security Plan, Revision 17. This version of Revision 17 to the plan addresses verbalinput your office provided, as well as supersedes the Revision 17 of the Physical Security Plan that was dated March,1996 and which was originally forwarded to your office via ,

correspondence dated May 13,1996. A listing describing the plan changes is attached. The changes do not decrease the safeguards effectiveness of the security plan.

Per your letter dated August 11,1995, you issued an exemption to us from the 10CFR73.55(d)(5) requirement that will now allow contractors to remove their Photo badge / key cards offsite. The deletion of this requirement and the use of the hand geometry biometrics system represent the major portion of this submittal.

Additionally, your August 11,1995 letter stated that prior to the implementation of the hand geometry access control system, we must submit our revised Physical Security Plan which is attached. The use of the hand geometry system, along with the aforementioned exemption, represent a significant burden reduction to Waterford 3 Plant.  !

n 5

9609260030 960924 ADOCK 05000382 b(f/v'

  1. lf PDR F PDR

[ d i

9 i

t Physical Security Plan, Rev.17 W3F1-96-0165 Page 2 The attachment contains Sai guards information as defined by 10CFR73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. We kindly request that it be withheld from public  !

j disclosure. '

If there are any questions on this matter, please contact Eddie Beckendorf, Security Superintendent at (504) 739 6340.

Very truly yours,

+m . h.>dw v J.J. Fi caro Director Nuclear Safety JJF/ PRS /tjs Attachment  !

(w/ Attachment) l cc: L.J Callan, NRC Region IV (2 copies) -l (w/o Attachment) cc: C.P.Patel, NRC-NRR N.S. Reynolds i R.B. McGehee NRC Resident inspectors Office SAFEGUARDS INFORMATION  ;

"THIS LETTER NOT SUBJECT TO PROTECTIVE REQUIREMENTS WHEN SEPARATED FROM MATERIAL CONTAINING SAFEGUARDS INFORMATION".