ML20117A552

From kanterella
Jump to navigation Jump to search
Informs Waterford 3 Agreed to Supply SE Upon Final Approval.Se Was Reviewed & Approved on 960728
ML20117A552
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/22/1996
From: James Fisicaro
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117A554 List:
References
W3F1-96-0146, W3F1-96-146, NUDOCS 9608260198
Download: ML20117A552 (2)


Text

__,

n.

w y

EntIrgy Operations,Inc.

Killona LA 70066 Tel 504 739 6242 mes J. Fisicaro 2$55?'

W3F1-96-0146 A4.05 PR August 22,1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Safety Evaluation Referenced in Discussirns with the Staff Gentlemen:

The attached Safety Evaluation was discussed with the Staff on July 27,1996. At that time the evaluation was in draft form. Waterford 3 agreed to supply the evaluation upon final approval. The attached evaluation was reviewed and approved on July 28,1996.

Should you have any questions or comments concerning this request, please contact me at (504) 739-6242 or Tim Gaudet at (504) 739-6666.

Very truly yours, kW J.J. Fisicaro Director Nuclear Safety JJF/PLC/ssf Attachment cc:

L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR), R.B. McGehee, N.S. Reynolds, NRC Resident Inspectors Office jk[0l 9608260198 960822 DR ADOCK 0500 2

.y e

J i

PORC AN 3

REVIEW AND APPROVAL SHEET 1

REVIEW OF; L D CR 97-ooV7 PORC E

t.c c A79 0 W e f CA B t WG T1 C An ( 6) tw b l'4 DODC S!C O

(

Oaiso og c.YA s %cu bn t.y - RE V t.

e l

The PORC em has reviewed this item and determined that a Safety /

Commitment Review was performed (if applicable), that a Safety Evaluation was

[

performed (if applicable), that an unreviewed safety question does not exist, and that nuclear safety is/was not adversely affected.

l RECOMMENDED FOR APPROVAL j.

PORC MEMBER MEMBER SIGNATURE YES NO NON-VOTING Maintenance Manager jn

]

Supenntendent

/0 /l

(.d.,,,1 k]-

/

}

Operations Manager ii SWpenn%endent

/

Radiation Protection s

Superintendent L

k i

Quality Assurance

[

Manager

[

f l

Mgmt Knowledgeable {-

g m Engineering mWa -

}

Manager Operations &

'[

l Maintenenee Management l-Trainee t.

PORC-SIC-Member f

j Design Engr. Manager 64,

N poRC-Sec44 ember RORC-S/C44 ember i

l Meeting No.

es- 077 Item No.

I-A Date: NB/96 l

This item is recommended for approval?

E YES O

NO This item requires SRC/NRC review prior to implementation?

O YES E NO If yes, ensure documentation supporting review is attached.

j 10CFR50.59 EVALUATION ATTACHED (( #2 SCREENING /YES [ ]

RECOMMENDED FOR j

' APPROVAL j

SIGNATURE YES NO DATE i

M

~

1 PORC Chairman lWg

/

o /25/%

)

Comments:

1.

1 J11 a

}

Approved by

_L jf1 f /]L/ Y. An Date D7/19/w enerai$ager Plant Operations

~

I UNT-001 Revision 14 23.1 (1 of 1) i l

A l

-