ML20059L25514 September 1990Advises of Preparation for Final Refueling Outage to Complete Second 10-yr Interval for Inservice InspsHydrostatic
Scram Discharge Volume
ML20059F5125 September 1990Requests Exemption from Filing Requirement of 10CFR55.45(b)(2)(iii) to Allow Submittal of NRC Form 474, Simulator Facility Certification, After 910326 Deadline & to Allow Administering of Simulator Portion of Test
ML20059F74431 August 1990Forwards Util Review of NRC Backfit Analysis for Hardened Wetwell Vent.Nrc Analysis Does Not Support Conclusion That Hardening Existing Vent Is cost-beneficial Mod for PlantHardened vent
Backfit
ML20059E90630 August 1990Forwards Response to 900808 Request for Addl Info Re NRC Bulletin 90-002, Loss of Thermal Margin Caused by Fuel Channel Box Bow
ML20059G18429 August 1990Ack NRC Request to Perform Type C Testing During Unscheduled Outage,As Plant Conditions Will Allow.Type C Exemptions Should Remain in Effect Until New Outage Start Date
ML20059C82327 August 1990Advises That SPDS Enhancements Described in Completed,Per 900628 Request.Offline & Online Testing Completed & Enhancements Considered to Be Operational
ML20059C85724 August 1990Provides Results of Evaluation of Ability to Meet Acceptance Criteria for Eccs,In Response to 900804 Notice of Violation. Plant Meets Acceptance Criteria Contained in 10CFR50.46 W/ Valve Logic Design Deficiency in Containment Spray SysUltimate heat sink
ML20063P9529 August 1990Advises That Response to NRC 900523 Request for Assessment of Hazardous Matl Shipment Will Be Sent by 910531
ML20058N0789 August 1990Submits Info Re pressure-temp Operating Limits for Facility, Per Generic Ltr 88-11.Util Recalculated Adjusted Ref Temp for Each Belt Line Matl as Result of New Displacement Per Atom Values
ML20058L9523 August 1990Forwards Rev 2 to Security Contingency Plan.Rev Withheld (Ref 10CFR73.21)
ML20058L9553 August 1990Responds to SALP Rept 50-219/88-99.Although Minor,Several Factual Errors Noted.Dialogue Promotes & Identifies Areas Where Improvements Should Be MadeSystematic Assessment of Licensee Performance
ML20056A20730 July 1990Forwards Response to NRC Bulletin 90-001, Loss of Fill-Oil in Transmitters Mfg by Rosemount. Record Review Performed & Sys Walkdowns Completed to Assemble Requisite List
ML20058N99120 July 1990Partially Withheld Response to NRC Bulletin 90-002 Re Loss of Thermal Margin Caused by Box Bow (Ref 10CFR2.790(b)(1))
ML20055H79620 July 1990Advises of Change to Preventive Maint Program for Electromatic Relief Valves.Rebuild Schedule Will Be Modified to Require Rebuilding Two or Three Valves During Refueling Outage & Remaining Valves During Next Refueling Outage
ML20055J04819 July 1990Requests 2-wk Extension for Submittal of Response to Re Installation of Hardened Wetwell Vent W/ Appropriate Extension Period to Be Decided Pending Outcome of 900724 Meeting Discussion W/Bwr Owners GroupHardened vent
Backfit
ML20064A12211 July 1990Discusses 900710 Telcon W/Nrc Re Util Corrective Actions in Response to NRC Finding That Operator Received Passing Grade on Administered Requalification Exam in 1989 Should Have Received Failing Grade.Corrective Actions Listed
ML20055F84910 July 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 188,reducing Low Condenser Vacuum Scram Setpoint
ML20043H74721 June 1990Confirms Telcon W/A Dromerick Re Util Plans to Inspect CRD Hydraulic Control Units During Plant Walkdown to Address USI A-46, Seismic Qualification of Equipment in Operating Nuclear Power Plants. Walkdown Planned in Oct 1992
ML20043H23014 June 1990Documents Licensee Commitment to Improve Seismic Restraints for Diesel Generator Switchgear Encls,Per 900613 Telcon W/ Nrc.Engineering Will Be Finalized & Mods Completed Prior to 900622
ML20043F7587 June 1990Responds to Request for Info Re Util Compliance W/Generic Ltr 88-01 & Insp Plans for Upcoming 13R Outage.Frequency of Insp of Welds Classified as IGSCC Categories C,D & E Will Not Be Reduced During 13R Outage
ML20043C24625 May 1990Forwards Rev 7 to EPIP 9473-IMP-1300.06 & Rev 4 to Radiological Controls Policy & Procedure Manual 9300-ADM-4010.03, Emergency Dose Calculation Manual.
ML20043C58025 May 1990Provides Descriptions & Conclusions of Three Remaining Issues of SEP Topic III-7B.Issues Include,Evaluation of Drywell Concrete Subj to High Temp & Thermal Transients
ML20043B29821 May 1990Responds to NRC 900420 Ltr Re Violations Noted in Insp Rept 50-219/90-06.Corrective Actions:Incident Critique Rept Incorporated as Required Reading for Appropriate Operations Personnel & Change Made to Procedure 201.1
ML20043D07017 May 1990Provides NRC W/Addl Info Re SPDS & Responds to Concerns Raised During 900117 & 18 SPDS Audit Documented in 900130 Ltr
ML20043B3909 May 1990Responds to NRC 900408 Ltr Re Violations Noted in Insp of License DPR-16.Corrective Actions:Two Narrow Range Drywell Pressure Monitoring Instruments to Be Provided During Cycle 14R Refueling Outage,Per Reg Guide 1.97,Category 1
ML20042G7078 May 1990Forwards Summary of Initiatives & Accomplishments Re SALP, Per 891031 Commitment at mid-SALP Meeting.Plant Div Responsibilities Now Include Conduct of Maint Outages & Emergency Operating Procedure Training ConductedFitness for Duty
High Radiation Area
Locked High Radiation Area
Backfit
ML20042G2297 May 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 180,revising Tech Specs Re Fuel cycle-specific Parameters
ML20042G2604 May 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 187,revising Tech Specs to Accommodate Implementation of 24-month Plant Refueling Cycle
ML20042E94320 April 1990Forwards Revised Epips,Consisting of Rev 7 to 9473-IMP-1300.01,Rev 4 to 9473-1300.11 & Rev 2 to 9473-ADM-1319.04.Deleted EPIPs Listed,Including Rev 3 to 9473-1300.19,Rev 2 to 9473-1300.21 & Rev 5 to 9473.1300.24
ML20042E63716 April 1990Informs of Plans to Install Safety Grade Check Valve in Supply Line Inside Emergency Diesel Generator Fuel Tank Room Coincident W/Replacement or Repair of Emergency Diesel Generator Fuel Oil Tank
ML20042E50013 April 1990Forwards Rev 1 to Topical Rept 028, Oyster Creek Response to NRC Reg Guide 1.97.
ML20012E87128 March 1990Lists Property Insurance Coverage,Effective 900401,per 10CFR50.54(w)(2)
ML20012D43919 March 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 186,allowing Idle Recirculation Loop to Be Isolated During Power Operation by Closing Suction,Discharge & Bypass Valves
ML20012B6782 March 1990Requests Exemption of Specified Local Leak Rate Test Intervals to Include Next Plant Refueling Outage Scheduled for Jan 1991,per 10CFR50,App JExemption Request
ML17347B5881 March 1990Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits
ML15217A10328 February 1990Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation ManualsOffsite Dose Calculation Manual
Process Control Program
ML18094B32228 February 1990Forwards Executed Amend 14 to Indemnity Agreement B-74
ML20011F38226 February 1990Confirms Amount Electronically Transferred to Us Dept of Treasury,Nrc on 900223 for Payment of NRC Review Fees of 10CFR50 Applications & 10CFR55 Svcs Per 10CFR170,for Period of 890101-0617 for Listed Invoices
ML20012A15023 February 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 184,removing 3.25 Limit on Extending Surveillance Intervals,Per Generic Ltr 89-14
ML20006G06222 February 1990Forwards Revised Proprietary Pages to DPC-NE-2004, Core Thermal Hydraulic Methodology Using VIPRE-01, Reflecting Minor Methodology Changes Made During Review & Approval Process.Pages Withheld
ML20006G01021 February 1990Discusses 900110 Meeting W/Nrr Re 13R Insp Criteria for RWCU Welds Outboard of Second Containment Isolation Valve. All Welds Required 100% Radiography Based on Review of Piping Spec.Response to Generic Ltr 88-01 Will Be Revised
ML20011F25721 February 1990Advises That 891003 Request for Appropriate Tech Specs for Chlorine Detection Re Control Room Habitability,Not Warranted
ML20011F66420 February 1990Responds to NRC 900122 Notice of Violation & Forwards Payment of Civil Penalty in Amount of $25,000.Corrective Actions:Change Made to Sys Component Lineup Sheets in 125- Volt Dc Operating Procedure to Include Selector SwitchesCondition Adverse to Quality
ML20006F59320 February 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 177.Amend Changes Tech Spec 4.7.B to Include Battery Svc Test Every Refueling Outage & Mod of Frequency of Existing Battery Performance Test
ML20006E90716 February 1990Discusses Plants Design Control Program.Util Adopted Concept of Design Change Implementation Package (Dcip).Dcip Will Contain or Ref Design Change Notice Prepared Per Approved Procedures
ML20006E14416 February 1990Forwards Suppl to Rev 1 to Updated FSAR for Braidwood Station,Units 1 & 2 & Byron Station,Units 1 & 2,per 881214 & 891214 Submittals
ML20006F91815 February 1990Forwards Application for Amend to License DPR-16,consisting of Tech Spec Change Request 183,permitting No Limitation on Number of Inoperable Position Indicators for 16 ASME Code Safety Valves During Power Operation
ML20006E42014 February 1990Requests NRC Approval for Use of Alloy 690 Steam Generator Tube Plugs for Facility,Prior to 900301,pending Final ASME Approval of Code Case for Alloy 690
ML20011E61512 February 1990Forwards Revs 1 to Security Plan & Security Training & Qualification Plan & Rev 2 to Security Contingency Plan. Salem Switchyard Project Delayed.Revs Withheld (Ref 10CFR73.21)
ML20011E4996 February 1990Discusses Liability & Funding Requirements Re NRC Decommissioning Funding Rules & Verifies Understanding of Rules.Ltr from NRC Explaining Liability & Requirements of Rule Requested