Issue date | Title | Topic | |
---|---|---|---|
ML23348A357 | 14 December 2023 | Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting | Surveillance Frequency Control Program Affidavit |
ML22342B280 | 28 December 2022 | Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 | |
ML22104A222 | 12 May 2022 | Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML21279A231 | 6 October 2021 | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement | Shutdown Margin Packing leak Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Surveillance Frequency Control Program Process Control Program Pressure Boundary Leakage |
ML21162A211 | 2 July 2021 | Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection | Safe Shutdown Fire Protection Program |
ML21011A048 | 1 February 2021 | Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems | Surveillance Frequency Control Program |
ML20244A011 | 28 September 2020 | Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b | Water Inventory Control Surveillance Frequency Control Program |
ML19308B107 | 11 December 2019 | Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) | Reactor Vessel Water Level Anticipated operational occurrence Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML19175A042 | 11 September 2019 | Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules | Time of Discovery Fire Protection Program |
ML18284A370 | 20 December 2018 | Renewed Facility Operating License NPF-47 Attachments and Appendices | Safe Shutdown Time of Discovery Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Post Accident Monitoring Hydrostatic Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Spiral reload Overtravel Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Fire Protection Program Unidentified leakage Power Uprate |
ML16224B075 | 19 September 2016 | NRC Response to Request for Interpretation of Technical Specifications | Safe Shutdown Ultimate heat sink Functionality Assessment |
RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors | 27 October 2015 | ISFSI - Correction of Technical Specification Typographical Errors | |
ML15195A061 | 21 September 2015 | Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation | |
ML15138A440 | 14 August 2015 | Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation | |
RBG-47600, Request for Interpretation of Technical Specifications | 4 August 2015 | Request for Interpretation of Technical Specifications | Safe Shutdown Probabilistic Risk Assessment Recently irradiated fuel |
ML15187A127 | 30 July 2015 | Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating | Safe Shutdown Mission time Stroke time Anticipated operational occurrence Offsite Circuit |
ML15117A575 | 2 June 2015 | Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies | Safe Shutdown Control of Heavy Loads |
ML14106A167 | 27 February 2015 | Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Large early release frequency Recently irradiated fuel Offsite Circuit Backfit |
ML14192A831 | 11 December 2014 | Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation | Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
ML14136A008 | 18 June 2014 | Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions | Anticipated operational occurrence Abnormal operational transient Battery sizing |
ML13322A429 | 5 March 2014 | Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process | Shutdown Margin Anticipated operational occurrence |
RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | 25 July 2013 | Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | Safe Shutdown Reactor Vessel Water Level Grab sample Fire Barrier Internal Flooding Tornado Generated Missile Turbine Missile Pressure Boundary Leakage Offsite Circuit |
RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs | 28 May 2013 | License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs | Unanalyzed Condition Reactor Vessel Water Level Anticipated operational occurrence Fuel cladding |
RBG-47345, Supplement to License Amendment Request 2011-05 | 8 March 2013 | Supplement to License Amendment Request 2011-05 | |
CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications | 20 November 2012 | Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications | High Radiation Area Process Control Program Fire Protection Program |
RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating. | 8 December 2011 | Changes to Technical Specification 3.8.1; AC Sources - Operating. | Safe Shutdown Slow transfer Offsite Circuit |
RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation | 27 July 2011 | License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation | Anticipated operational occurrence Probabilistic Risk Assessment |
RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... | 27 July 2011 | Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... | Fire Barrier Internal Flooding Tornado Generated Missile Turbine Missile |
RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles | 17 August 2010 | Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles | |
ML093360581 | 14 December 2009 | Correction of Errors in Amendment Nos. 165 and 166 | |
RBG-46981, Correction of Technical Specification Typographical Errors | 30 November 2009 | Correction of Technical Specification Typographical Errors | |
ML080280230 | 28 February 2008 | License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater | |
ML080440293 | 25 January 2008 | License Amendment Request, Main Turbine Bypass System | Anticipated operational occurrence Feedwater Controller Failure Fuel cladding |
ML072220026 | 30 August 2007 | Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). | |
ML070920458 | 3 May 2007 | Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves | |
RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves | 19 September 2006 | License Amendment Request, Leakage Rate Testing of Containment Purge Valves | |
ML061380236 | 17 May 2006 | Technical Specifications, Removal of Temp Note to Loss of Power | |
ML060600426 | 9 February 2006 | Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval | |
RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements | 19 December 2005 | License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements | |
ML052980069 | 7 October 2005 | Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger | |
ML052730323 | 15 September 2005 | Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements | |
RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements | 31 August 2005 | License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements | Missed surveillance |
ML052630396 | 25 August 2005 | Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation | |
ML051520096 | 25 May 2005 | Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval | 8 March 2005 | License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval | Probabilistic Risk Assessment Large early release frequency |
ML043210130 | 15 October 2004 | Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification | Hydrostatic |
ML043210140 | 15 October 2004 | Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval | |
ML042790222 | 4 October 2004 | Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors | Reactor Vessel Water Level Post Accident Monitoring |
ML042330122 | 12 August 2004 | Tech Spec Pages for Amendment 141 Removal of Mode Restrictions for Surveillance Testing of the Division III Battery | |
ML041760484 | 16 June 2004 | Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Valves | Scram Discharge Volume |