Letter Sequence Other |
---|
TAC:ME0157, Control Room Habitability, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, Control Rod SCRAM Time Testing, TSTF-1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling, Minimum Vs. Steady State Voltage and Frequency (Approved, Closed) TAC:ME0406, Control Room Habitability, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration, Control Rod SCRAM Time Testing, TSTF-1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling, Minimum Vs. Steady State Voltage and Frequency (Approved, Closed) |
|
MONTHYEARML0835701922008-11-20020 November 2008 License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) Project stage: Request ML0900600462009-01-0606 January 2009 E-Mail Acceptance Review for License Amendment Request Project stage: Acceptance Review ML0834704082009-01-0808 January 2009 Request for Withholding Proprietary Information from Public Disclosure, License Amendment Request to Revise Technical Specification 5.6.5, Core Operating Limits Report (COLR) Project stage: Other ML0902701982009-01-21021 January 2009 License Amendment Request 2009-01, Application for Technical Specifications (TS) Change to Adopt NRC Approved Generic Changes TSTF-163, TSTF-222, TSTF-230, and TSTF-306 to the Improved Technical Specifications Project stage: Request RBG-46883, Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 3062009-01-23023 January 2009 Unit 1, Supplement to License Amendment Request, Application for Technical Specification Change to Adopt NRC Approved Generic Changes TSTF-163, -222, -230 and 306 Project stage: Supplement ML0906200672009-03-0303 March 2009 Acceptance Review Project stage: Acceptance Review ML0908305222009-03-24024 March 2009 Acknowledgement of Change in Commitment Project stage: Other RBG-46926, Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements2009-06-22022 June 2009 Unit 1 - Supplement to License Amendment Request (Lar), to Implement Changes Consistent with TSTF-163 on Diesel Generator Surveillance Requirements Project stage: Supplement ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 Project stage: Other RBG-46943, Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr)2009-08-12012 August 2009 Supplement to License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (Colr) Project stage: Supplement ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method Project stage: Approval RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors Project stage: Request ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 Project stage: Other 2009-12-14
[Table View] |
|
---|
Category:Letter
MONTHYEARML25027A4212025-01-27027 January 2025 Entergy Operations, Inc. - Application to Revise Technical Specifications to Adopt TSTF-591, Revised Risk Informed Completion Time (RICT) Program RBG-48323, License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink2024-12-30030 December 2024 License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink ML24339B3042024-12-0404 December 2024 Application to Revise Technical Specifications to Use Online Monitoring Methodology ML24338A0522024-12-0303 December 2024 Entergy - 2024 Certification of Foreign Ownership and Control or Influence (FOCI) IR 05000458/20244012024-12-0202 December 2024 Material Control and Accounting Program Inspection Report 05000458/2024401 (Public Report) IR 05000458/20244032024-11-27027 November 2024 Security Baseline Inspection Report 05000458/2024403 (Public) IR 05000458/20244042024-11-21021 November 2024 Security Baseline Inspection Report 05000458/2024404 (Cover Letter Only) IR 05000458/20213012024-11-14014 November 2024 NRC Initial Operator Licensing Examination Approval 05000458/2021301 ML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000458/20240102024-10-31031 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2024010 IR 05000458/20240032024-10-31031 October 2024 Integrated Inspection Report 05000458/2024003 RBG-48306, Report of Changes and Errors to 10CFR50.462024-09-24024 September 2024 Report of Changes and Errors to 10CFR50.46 RBG-48315, Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement2024-09-24024 September 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 Supplement ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1192024-09-16016 September 2024 Notification of NRC Follow Up Inspection for One Severity Level (SL) III and Two SL IV or Three or More SL IV Violations and Request for Additional Information RBG-48311, Reply to a Notice of Violation, NRC Inspection Report 05000458/20240022024-08-28028 August 2024 Reply to a Notice of Violation, NRC Inspection Report 05000458/2024002 IR 05000458/20240052024-08-22022 August 2024 Updated Inspection Plan for River Bend Station (Report 05000458/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24214A2752024-08-0202 August 2024 Acknowledgement of Readiness for Supplemental Inspection RBG-48308, Notification of Readiness for Supplemental Inspection2024-07-31031 July 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20240022024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24205A0392024-07-30030 July 2024 Integrated Inspection Report 05000458/2024002 and Notice of Violation ML24164A0862024-06-12012 June 2024 Notification of Commercial Grade Dedication Inspection (05000458/2024010) and Request for Information 05000458/LER-2023-005-01, Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String2024-06-0404 June 2024 Manual Reactor Scram Due to Lowering Feedwater Temperature Following an Automatic Isolation of Feedwater Heater String ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24093A0892024-05-16016 May 2024 Issuance of Amendment No. 214 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML24081A0072024-05-16016 May 2024 Issuance of Amendment No. 213 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000458/20240012024-05-14014 May 2024 Integrated Inspection Report 05000458/2024001 ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions ML24102A2842024-05-0707 May 2024 Summary of Regulatory Audit in Support of LARs to Revise Technical Specifications to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48276, 2023 Annual Radioactive Effluent Release Report2024-04-23023 April 2024 2023 Annual Radioactive Effluent Release Report RBG-48288, Louisiana Pollutant Discharge Elimination System Permit Renewal2024-04-15015 April 2024 Louisiana Pollutant Discharge Elimination System Permit Renewal IR 05000458/20244022024-04-15015 April 2024 Security Baseline Inspection Report 05000458/2024402 (Full Report) ML24106A0432024-04-11011 April 2024 June 2024 Emergency Preparedness Exercise Inspection Request for Information ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair RBG-48277, 2023 Annual Radiological Environmental Operating Report2024-04-10010 April 2024 2023 Annual Radiological Environmental Operating Report ML24093A1122024-04-0202 April 2024 Notification of NRC Initial Operator Licensing Examination 05000458/2024301 ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) IR 05000458/20240402024-03-15015 March 2024 – 95001 Supplemental Inspection Report 05000458/2024040 and Follow-Up Assessment ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24066A1802024-03-0707 March 2024 Notification of NRC Follow-Up Inspection for Any Severity Level I or II Traditional Enforcement Violation IR 05000458/20230062024-02-28028 February 2024 Annual Assessment Letter for River Bend Station - Report 05000458/2023006 RBG-48278, 2023 Spent Fuel Storage Radioactive Effluent Release Report2024-02-27027 February 2024 2023 Spent Fuel Storage Radioactive Effluent Release Report RBG-48286, Revision to Owners Activity Report Form (OAR) for Cycle 222024-02-27027 February 2024 Revision to Owners Activity Report Form (OAR) for Cycle 22 ML24031A0042024-02-21021 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0052 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000458/LER-2023-006, Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard2024-02-0808 February 2024 Automatic Reactor Scram Due to a Turbine Trip Following a Disconnect Failure at Switchyard RBG-48274, Notification of Readiness for Supplemental Inspection2024-02-0505 February 2024 Notification of Readiness for Supplemental Inspection IR 05000458/20230042024-01-30030 January 2024 Integrated Inspection Report 05000458/2023004 2025-01-27
[Table view] Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19357A0092019-12-31031 December 2019 Redacted - Issuance of Amendment No. 201 Change to the Neutron Absorbing Material Credited in Spent Fuel Pool for Criticality Control ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For..2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.. RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation2011-07-27027 July 2011 License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-08-17017 August 2010 Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors ML0901301612009-01-23023 January 2009 Issuance of Amendment No. 161, Revise Technical Specification Surveillance Requirements Consistent with TSTF-475, Revision 1, Control Rod Notch Surveillance Frequency ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater ML0804402932008-01-25025 January 2008 License Amendment Request, Main Turbine Bypass System ML0722200262007-08-30030 August 2007 Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr) ML0709204582007-05-0303 May 2007 Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves2006-09-19019 September 2006 License Amendment Request, Leakage Rate Testing of Containment Purge Valves ML0613802362006-05-17017 May 2006 Technical Specifications, Removal of Temp Note to Loss of Power ML0606004262006-02-0909 February 2006 Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements2005-12-19019 December 2005 License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements ML0529800692005-10-0707 October 2005 Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger ML0527303232005-09-15015 September 2005 Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements2005-08-31031 August 2005 License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements ML0526303962005-08-25025 August 2005 Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation ML0515200962005-05-25025 May 2005 Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval2005-03-0808 March 2005 License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval ML0432101302004-10-15015 October 2004 Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification ML0432101402004-10-15015 October 2004 Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval ML0427902222004-10-0404 October 2004 Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors 2023-12-14
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
Dear Sir or Madam:
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, G\\J-bM VJ~
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 165, TS page 3.8-10
- 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv
ENCLOSURE 1 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3.8-10 FOR AMENDMENT NO. 165
3.8.1 AC Sources-Operating SURVEILLANCE SR 3.8.1.12
NOTES---------------------------
- 1.
All DG starts may be preceded by an engine prelube period.
- 2.
This Surveillance shall not be performed in MODE 1 or 2. (Not applicable to DG 1C)
However. credit may be taken for unplanned events that satisfy this SR.
Verify on an actual or simulated Emergency Core Cooling System (ECCS) initiation signal each DG auto-starts from standby condition and:
- a.
For DG 1C during the auto-start maintains voltage s; 5400 V and frequency s; 66.75 Hz;
- b.
In s; 10 seconds for DG 1A and DG 1Band s; 13 seconds for DG 1C after auto-start and during tests, achieves voltage ~ 3740 V and frequency ~ 58.8 Hz.
- c.
Achieves steady state voltage ~ 3740 V and s; 4580 V and frequency ~ 58.8 Hz and s; 61.2 Hz; and
- d.
Operates for ~ 5 minutes.
FREQUENCY 18 months (continued)
RIVER BEND 3.8-10 Amendment No. 81 121 133,165
ENCLOSURE 2 REPLACEMENT TECHNICAL SPECIFICATION PAGE 5.0-19 FOR AMENDMENT NO. 166
5.6 5.6.5 Reporting Requirements 5.6 Reporting Requirements CORE OPERATING LIMITS REPORT (COLR) (continued)
- 24)
NEDE-24011-P-A, uGeneral Electric Standard Application for Reactor Fuel (GESTAR-II)".
- 25)
NEDC-33383P, "GEXL97 Correlation Applicable to ATRIUM-10 Fuel," Global Nuclear Fuel.
- c.
The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
- d.
The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.
RIVER BEND 5.0-19 Amendment No. 81 9699 100 105 106
~, 166
December 14, 2009 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 SUB"IECT:
RIVER BEND STATION, UNIT 1 - CORRECTION OF ERRORS IN AMENDMENT NOS. 165 AND 166 (TAC NOS. ME0406 AND ME0157)
Dear Sir or Madam:
By letters dated August 11 and September 29, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML092010370 and ML092430145, respectively), the Nuclear Regulatory Commission (NRC) staff issued Amendments Nos. 165 and 166, respectively, to Renewed Facility Operating License No. NPF-47 for the River Bend Station, Unit 1. By letter dated November 30, 2009 (ADAMS Accession No. ML093380291),
Entergy Operations, Inc. (Entergy, the licensee), noted errors in Technical Specification (TS) pages issued by Amendment Nos. 165 and 166. Specifically, for Amendment No. 165, TS page 3.8-10 Surveillance Requirement (SR) 3.8.1.12.c was issued with the 3740 value missing the denomination (V - volts). In Amendment No. 166, TS page 5.0-19, TS 5.6.5 was issued with the incorrect title for the reference 25 for the Core Operating Limits Report. The errors were inadvertently introduced when the NRC staff was processing Amendment Nos. 165 and 166.
Thus, according to the NRC's policy established by SECY-96-238 (ADAMS Accession No. 9611250030), these errors can be corrected by a letter. Enclosed please find the replacement pages 3.8-10 for Amendment No. 165 and 5.0-19 for Amendment No. 166.
This correction does not change any of the conclusions in the safety evaluations associated with the amendments. We apologize for any inconvenience caused by this error.
Sincerely, IRA!
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 165, TS page 3.8-10
- 2. Amendment No. 166, TS page 5.0-19 cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDirsltsb Resource RidsNrrLAJBurkhardt Resource LPLIV rtf RidsNrrDssSnpb Resource RidsNrrPMRiverBend Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource ADAMS Accession No ML093360581 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME ABWang JBurkhardt MMarkley ABWang DATE 12/09/09 12/7109 12/14/09 12/14/09 OFFICIAL AGENCY RECORD