ML052980069
| ML052980069 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/07/2005 |
| From: | NRC/NRR/DLPM |
| To: | |
| Kalyanam N,NRR/DLPM,415-1480 | |
| Shared Package | |
| ML053000452 | List: |
| References | |
| TAC MC5423 | |
| Download: ML052980069 (1) | |
Text
DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 APPLICABILITY:
The Division I, Division II, and Division III DC electrical power subsystems shall be OPERABLE.
MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One required battery A.1 Restore battery terminal 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> charger on Division I or 11 voltage to greater than or inoperable.
equal to the minimum established float voltage.
AND A.2 Verify battery float current Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> s 2 amps.
AND A.3 Restore battery charger to 7 days OPERABLE status.
B.
Division I or 11 DC B.1 Restore Division I and 11 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> electrical power DC electrical power subsystem inoperable for subsystems to OPERABLE reasons other than status.
Condition A.
C.
Division IlIl DC electrical C.1 Declare High Pressure Immediately power subsystem Core Spray System and inoperable.
Standby Service Water System pump 2C inoperable.
D.
Required Action and D.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND D.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I
I I
RIVER BEND 3.8-24 Amendment No. A4, 148