Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger
ML052980069
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/07/2005
From:
NRC/NRR/DLPM
To:
Kalyanam N,NRR/DLPM,415-1480
Shared Package
ML053000452 List:
References
TAC MC5423
Download: ML052980069 (1)


Text

DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I, Division II, and Division III DC electrical power subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required battery A.1 Restore battery terminal 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> charger on Division I or 11 voltage to greater than or inoperable. equal to the minimum established float voltage.

AND A.2 Verify battery float current Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> s 2 amps.

AND A.3 Restore battery charger to 7 days OPERABLE status.

B. Division I or 11DC B.1 Restore Division I and 11 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> electrical power DC electrical power subsystem inoperable for subsystems to OPERABLE reasons other than status.

Condition A.

C. Division IlIl DC electrical C.1 Declare High Pressure Immediately I power subsystem Core Spray System and inoperable. Standby Service Water System pump 2C inoperable.

D. Required Action and D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> I associated Completion Time not met. AND D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I RIVER BEND 3.8-24 Amendment No. A4, 148