Letter Sequence Approval |
---|
|
|
MONTHYEARRBG-47983, Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b.2019-11-18018 November 2019 Application to Revise Technical Specification 3.3.5.2, RPV Water Inventory Control Instrumentation to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b. Project stage: Request ML19352F5222019-12-17017 December 2019 NRR E-mail Capture - Acceptance Review Results for License Amend Request to Revise TS 3.3.5.2 to Adopt TSTF-425, Rev 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, for River Bend, Project stage: Acceptance Review ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b Project stage: Approval 2019-12-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000458/20230402024-01-18018 January 2024 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter RBG-48271, Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk2024-01-12012 January 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML24011A1742024-01-11011 January 2024 Security Baseline Inspection Report (Cover Letter) ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection IR 05000458/20230102023-12-12012 December 2023 Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 RBG-48267, Reply to a Notice of Violation, NRC Inspection Report 05000458/20230032023-12-0707 December 2023 Reply to a Notice of Violation, NRC Inspection Report 05000458/2023003 ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1432023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23310A0322023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 IR 05000458/20230032023-11-13013 November 2023 Integrated Inspection Report 05000458/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A4322023-11-0909 November 2023 Notification of NRC Supplemental Inspection (95001) and Request for Information RBG-48264, Core Operating Limits Report (COLR) - Cycle 23, Revision 12023-11-0606 November 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 1 RBG-48260, Notification of Readiness for Supplemental Inspection2023-10-12012 October 2023 Notification of Readiness for Supplemental Inspection ML23278A2402023-10-0606 October 2023 Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 RBG-48258, Notification of Readiness for Supplemental Inspection2023-10-0505 October 2023 Notification of Readiness for Supplemental Inspection RBG-48259, Revision to Reply to Notice of Violation; EA-23-0552023-10-0303 October 2023 Revision to Reply to Notice of Violation; EA-23-055 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000458/20234012023-09-26026 September 2023 Cyber Security Inspection Report 05000458/2023401 IR 05000458/20230012023-09-21021 September 2023 NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded RBG-48254, Report of Changes and Errors to 10CFR50.462023-09-21021 September 2023 Report of Changes and Errors to 10CFR50.46 IR 05000458/20234032023-09-21021 September 2023 NRC Security Inspection Report 05000458/2023403 (Cover Letter) RBG-48249, Reply to a Notice of Violation, EA-23-0712023-09-14014 September 2023 Reply to a Notice of Violation, EA-23-071 RBG-48253, Submittal of Owner'S Activity Report Form for Cycle 222023-09-12012 September 2023 Submittal of Owner'S Activity Report Form for Cycle 22 IR 05000458/20230122023-09-0101 September 2023 Comprehensive Engineering Team Inspection Report 05000458/2023012 IR 05000458/20230052023-08-21021 August 2023 Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter RBG-48247, Reply to Notice of Violation; EA-23-0552023-08-21021 August 2023 Reply to Notice of Violation; EA-23-055 IR 05000458/20230922023-08-15015 August 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 IR 05000458/20230022023-08-0909 August 2023 Integrated Inspection Report 05000458/2023002 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23195A0692023-07-24024 July 2023 2023 River Bend Station Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000458/20230912023-07-20020 July 2023 Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23195A0222023-07-11011 July 2023 4-2022-012 Letter - OI Closure to Licensee IR 05000458/20234042023-07-11011 July 2023 NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) IR 05000458/20230902023-06-26026 June 2023 NRC Inspection Report 05000458/2023090 and Preliminary White Finding ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RBG-48226, Core Operating Limits Report (COLR) - Cycle 23, Revision 02023-05-31031 May 2023 Core Operating Limits Report (COLR) - Cycle 23, Revision 0 RBG-48237, Response to NRC Integrated Inspection Report 05000458/20230012023-05-25025 May 2023 Response to NRC Integrated Inspection Report 05000458/2023001 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23116A2352023-05-0101 May 2023 Integrated Inspection Report 05000458/2023001 RBG-48220, Submittal of 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report 2024-01-18
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22188A1742022-07-19019 July 2022 Issuance of Amendment No. 211 Add License Condition Concerning Receipt, Possession, and Use of Byproduct Materials ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18284A3692018-12-20020 December 2018 Renewed Facility Operating License NPF-47 ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML15265A1162015-10-0101 October 2015 Issuance of Conforming Amendment to Reflect the Transfer of the Facility Operating License No. NPF-47 from Entergy Gulf States Louisiana, LLC to Entergy Louisiana, LLC ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML15071A4752015-03-19019 March 2015 Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14225A4442014-12-12012 December 2014 Issuance of Amendment No. 183, Revise Technical Specification Surveillance Requirements Related to Ventilation Filter Testing Program for Heaters in Safety-Related Charcoal Filter Trains ML14304A1812014-12-12012 December 2014 Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process ML13060A2102013-03-29029 March 2013 Issuance of Amendment No. 179, Revise Technical Specification 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of Surveillance Requirement 3.3.8.1.3 and Revise Allowable Values of Certain Functions ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML12277A3082012-12-0505 December 2012 Issuance of Amendment No. 176, Revise Technical Specification 3.8.1, AC Sources - Operating for Testing of Automatic Transfer Function to Offsite Power for Division III Bus ML12261A4722012-12-0505 December 2012 Issuance of Amendment No. 177, Revise Physical Protection License Condition Related to Milestone No. 6 of the Cyber Security Plan Implementation ML12240A1802012-09-24024 September 2012 Issuance of Amendment No. 175, Emergency Plan Change to Relocate Alternate Emergency Operations Facility from 23 to 28 Miles from the Technical Support Center ML1210705572012-05-30030 May 2012 Issuance of Amendment No. 174, Revise Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, for Main Steam Tunnel Temperature Function Setpoints ML1200902422012-02-0808 February 2012 Issuance of Amendment No. 173, Adopt Technical Specification Task Force (TSTF)-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML1124303342011-11-21021 November 2011 Issuance of Amendment No. 172, Adoption of TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1119402002011-07-29029 July 2011 Issuance of Amendment No. 171, Add License Condition and Approval of Cyber Security Plan and Associated Implementation Schedule ML1027901222011-01-0505 January 2011 Issuance of Amendment No. 170, Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, Consistent with TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities ML1026405472010-10-21021 October 2010 Issuance of Amendment No. 169, Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel ML1023502662010-08-31031 August 2010 Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals ML1002003142010-03-31031 March 2010 License Amendment, Revise Technical Specification 5.5.6, Inservice Testing Program, to Incorporate References to ASME Code for Operation and Maintenance of Nuclear Power Plants ML0924301452009-09-29029 September 2009 Issuance of Amendment No. 166, Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), to Add Reference to Analytical Method ML0920103702009-08-11011 August 2009 License Amendment No. 165, Modify Technical Specifications to Adopt NRC-approved Generic Changes TS Task Force (TSTF)-163, TSTF-220, TSTF-230, and TSTF-306 ML0915405702009-06-24024 June 2009 Issuance of Amendment No. 163, Revise Technical Specification 3.7.5, Main Turbine Bypass System ML0812304932008-06-0202 June 2008 Issuance of Amendment No. 160, Adoption of TSTF-2, Proposed Change to Relocate Surveillance Requirement 3.8.3.6, from the Technical Specifications to a Licensee-Controlled Document 2022-07-19
[Table view] Category:Safety Evaluation
MONTHYEARML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22265A1802022-09-27027 September 2022 Proposed Alternative to the Requirements of ASME Code of Operation and Maintenance of Nuclear Power Plants for Pressure Isolation Valve Testing Frequency ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML22007A3172022-01-18018 January 2022 1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI ML21258A4082021-09-21021 September 2021 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of Boiling Water Reactor Vessel and Internals Project Guidelines ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21146A0182021-06-0808 June 2021 Issuance of Amendments to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML21040A2922021-03-0404 March 2021 Issuance of Amendments Adoption of TSTF 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21011A0682021-02-0202 February 2021 Issuance of Amendments Adoption of TSTF 439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20339A5182021-01-0606 January 2021 Issuance of Amendment No. 203 Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19071A2992019-06-19019 June 2019 Issuance of Amendment No. 198 Removal of Table of Contents from Renewed Operating License Technical Specifications ML19066A0082019-04-29029 April 2019 Issuance of Amendment Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18360A0252019-01-17017 January 2019 Redacted Version - Issuance of Amendment No. 195 Correction of a Non-Conservative Technical Specification for Pressure-Temperature Limits ML18345A3422018-12-21021 December 2018 Issuance of Amendment No. 194 Relocation of the Reactor Core Isolation Cooling Injection Point to the a Feedwater Line ML18310A0132018-11-16016 November 2018 Relief from the Requirements of the ASME Code to Use Boiling Water Reactor Vessel Internals Guidelines as an Alternative ML18267A3412018-11-0707 November 2018 Issuance of Amendment No. 193 Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML18299A2732018-11-0707 November 2018 Request for Relief from Requirements of Asme Code RBS-ISI-016 from the Requirements of the ASME Code for Pressure Retaining Welds in Control Rod Housings (EPID-L-2018-LLR-0042) ML18212A1512018-07-31031 July 2018 License Renewal Safety Evaluation Report ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML17138A1442017-05-24024 May 2017 Relief from the Requirements of the ASME Code ML16287A5992016-10-27027 October 2016 Issuance of Amendment No. 191, Revise Technical Specifications for Extension of Containment Leakage Tests Frequency ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML15292A5082016-08-11011 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16124A6882016-06-21021 June 2016 Issuance of Amendment No. 190 Cyber Security Plan Implementation Schedule ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15156A8602015-06-30030 June 2015 Safety Evaluation Input - Regarding Application for Change to Technical Specifications 3.8.1, AC Sources - Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML15114A3512015-05-0404 May 2015 Correction to Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval ML15071A1412015-03-23023 March 2015 Relief Request No. VRR-RBS-2014-1 Regarding the Third 10-Year Inservice Testing Interval ML15071A4752015-03-19019 March 2015 Correction to License Amendment No. 185 Adoption of TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML13350A1612015-02-10010 February 2015 Correction to Safety Evaluation Related to Amendment No. 168 Which Modified Techical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals; Enclosed New SE Section 3.1.7B ML14304A1812014-12-12012 December 2014 Issuance of Amendment No. 184, Revise Operating License Condition for Change to Cyber Security Plan Milestone 8 Full Implementation Date ML14225A4442014-12-12012 December 2014 Issuance of Amendment No. 183, Revise Technical Specification Surveillance Requirements Related to Ventilation Filter Testing Program for Heaters in Safety-Related Charcoal Filter Trains ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14183A0862014-11-13013 November 2014 Correction to Relief Request RBS-ISI-019, Use of BWRVIP Guidelines in Lieu of Specific ASME Code Requirements Issued 5/30/14 to Change Fourth 10-Year Inservice Inspection Interval to Third-10-Year Interval 2023-09-29
[Table view] Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation2011-07-27027 July 2011 License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-08-17017 August 2010 Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater ML0804402932008-01-25025 January 2008 License Amendment Request, Main Turbine Bypass System ML0722200262007-08-30030 August 2007 Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). ML0709204582007-05-0303 May 2007 Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves2006-09-19019 September 2006 License Amendment Request, Leakage Rate Testing of Containment Purge Valves ML0613802362006-05-17017 May 2006 Technical Specifications, Removal of Temp Note to Loss of Power ML0606004262006-02-0909 February 2006 Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements2005-12-19019 December 2005 License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements ML0529800692005-10-0707 October 2005 Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger ML0527303232005-09-15015 September 2005 Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements2005-08-31031 August 2005 License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements ML0526303962005-08-25025 August 2005 Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation ML0515200962005-05-25025 May 2005 Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval2005-03-0808 March 2005 License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval ML0432101302004-10-15015 October 2004 Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification ML0432101402004-10-15015 October 2004 Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval ML0427902222004-10-0404 October 2004 Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors ML0423301222004-08-12012 August 2004 Tech Spec Pages for Amendment 141 Removal of Mode Restrictions for Surveillance Testing of the Division III Battery ML0417604842004-06-16016 June 2004 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Valves 2023-12-14
[Table view] |
Text
September 28, 2020 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - ISSUANCE OF AMENDMENT NO. 202 RE: ADOPT TSTF-425, REVISION 3, RELOCATE SURVEILLANCE FREQUENCIES TO LICENSEE CONTROL - RITSTF INITIATIVE 5b (EPID L-2019-LLA-0258)
Dear Sir or Madam:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued the enclosed Amendment No. 202 to Renewed Facility Operating License No. NPF-47 for River Bend Station, Unit 1 (River Bend). The amendment consists of changes to the River Bend Technical Specifications (TSs) in response to your application dated November 18, 2019 (Agencywide Documents Access and Management System Accession No. ML19322C569).
The amendment modifies River Bend TS 3.3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation, by removing the surveillance frequencies and placing them in a licensee-controlled program through the adoption of Technical Specifications Task Force (TSTF) Traveler, TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF [Risk-Informed Technical Specification Task Force] Initiative 5b, which was approved by the NRC on April 29, 2019, for adoption into the River Bend TSs.
A copy of the related safety evaluation is also enclosed. Notice of Issuance will be included in the Commissions Federal Register notice.
Sincerely,
/RA/
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosures:
- 1. Amendment No. 202 to NPF-47
- 2. Safety Evaluation cc: Listserv
ENTERGY LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.
DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 202 Renewed License No. NPF-47
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Entergy Operations, Inc. (the licensee), dated November 18, 2019, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
Enclosure 1
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.c.(2) of Renewed Facility Operating License No. NPF-47 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 202 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by Jennifer L. Jennifer L. Dixon-Herrity Date: 2020.09.28 Dixon-Herrity 14:37:53 -04'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Renewed Facility Operating License No. NPF-47 and Technical Specifications Date of Issuance: September 28, 2020
ATTACHMENT TO LICENSE AMENDMENT NO. 202 RENEWED FACILITY OPERATING LICENSE NO. NPF-47 RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458 Replace the following pages of the Renewed Facility Operating License No. NPF-47 and Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain a marginal line indicating the area of change.
Renewed Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 3.3-43c 3.3-43c
(2) EOI, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the above designated location in accordance with the procedures and limitations set forth in this renewed license; (3) EOI, pursuant to Section 103 of the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 202 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No. 202
RPV Water Inventory Control Instrumentation 3.3.5.2 SURVEILLANCE REQUIREMENTS
NOTE------
Refer to Table 3.3.5.2-1 to determine which SRs apply for each ECCS function.
SURVEILLANCE FREQUENCY SR 3.3.5.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.2.3 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program RIVER BEND 3.3-43c Amendment No. 49J, 202
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 202 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.
RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458
1.0 INTRODUCTION
By application dated November 18, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19322C569), Entergy Operations, Inc. (Entergy, the licensee) submitted a request for changes to the Technical Specifications (TSs) for River Bend Station, Unit 1 (River Bend).
The proposed amendment would modify River Bend TS 3.3.5.2, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation, by removing the surveillance frequencies and placing them in a licensee-controlled program through the adoption of Technical Specifications Task Force (TSTF) Traveler, TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF [Risk-Informed Technical Specification Task Force] Initiative 5b.
Background
By letter dated April 29, 2019 (ADAMS Accession No. ML19066A008), the U.S. Nuclear Regulatory Commission (NRC, the Commission) approved License Amendment No. 196 concerning the adoption of TSTF-425, Revision 3, into the River Bend TSs. Prior to final approval, Entergy submitted a supplement dated December 20, 2018 (ADAMS Accession No. ML19002A115) to the River Bend TSTF-425, Revision 3, license amendment request that provided revised marked-up TS pages. These revised marked-up TS pages incorporated the changes approved in Amendment No. 193, dated November 7, 2018 (ADAMS Accession No. ML18267A341), which adopted TSTF-542, Reactor Pressure Vessel Water Inventory Control. However, the licensees supplement inadvertently omitted a revised markup of TS page 3.3-43c for new TS 3.3.5.2 surveillance requirements (SRs).
2.0 REGULATORY EVALUATION
2.1 Description of the Proposed Change The licensee proposed to modify the TSs by relocating the surveillance frequencies for SRs 3.3.5.2.1, 3.3.5.2.2, and 3.3.5.2.3 to a licensee-controlled program described in TS 5.5.12 Enclosure 2
Surveillance Frequency Control Program (SFCP), through the adoption of TSTF-425, Revision 3.
2.2 Applicable Regulations In Title 10 of the Code of Federal Regulations (10 CFR) 50.36, Technical specifications, the NRC established regulatory requirements related to the content of TSs. Pursuant to 10 CFR 50.36, TSs are required to include items in the following five specific categories related to station operation: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) SRs; (4) design features; and (5) administrative controls.
Section 50.36(c)(3), Surveillance requirements, of 10 CFR states:
Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
3.0 TECHNICAL EVALUATION
The NRC staff reviewed the proposed change to relocate the surveillance frequencies for SRs 3.3.5.2.1, 3.3.5.2.2, and 3.3.5.2.3 to the SFCP.
The NRC staff finds the proposed change acceptable because relocating the surveillance frequencies to the SFCP meets the intent of TSTF-425, Revision 3. SRs 3.3.5.2.1, 3.3.5.2.2, and 3.3.5.2.3 have fixed periodic frequencies and do not meet the exclusion criteria identified in the NRC staffs model safety evaluation dated July 6, 2009 (74 FR 31996; ADAMS Accession No. ML090900716).
Changes to the frequencies for these SRs will be controlled under the SFCP in accordance with TSTF-425, Revision 3. The SFCP provides the necessary administrative controls to ensure that SRs related to testing, calibration, and inspection are conducted at frequencies necessary to assure that the quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
Based on the above evaluation, the NRC staff concludes that, with the proposed relocation of the surveillance frequencies to a licensee-controlled program and administratively controlling the program in accordance with the TSs, the licensee continues to meet the requirements in 10 CFR 50.36.
4.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Louisiana State official was notified of the proposed issuance of the amendment on August 21, 2020. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and changes SRs.
The NRC staff has determined that the amendment involves no significant increase in the
amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The NRC has previously issued a proposed finding that the amendment involves no significant hazards consideration, published in the Federal Register on March 10, 2020 (85 FR 13951, and there has been no public comment on such finding). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: T. Sweat Date: September 28, 2020
ML20244A011 *by memorandum **by e-mail OFFICE NRR/DORL/LPL4/PM** NRR/DORL/LPL4/LA** NRR/DSS/STSB/BC* OGC - NLO**
NAME JDrake PBlechman (LRonewicz for) VCusumano STurk DATE 9/2/2020 8/31/2020 7/29/2020 9/15/2020 OFFICE NRR/DORL/LPL4/BC** NRR/DORL/LPL4/PM**
NAME JDixon-Herrity TWengert DATE 9/23/2020 9/28/2020