Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors
ML042790222
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/04/2004
From:
NRC/NRR/DLPM
To:
References
TAC MC2277
Download: ML042790222 (4)


Text

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS Thee sappyoachFunct-------NOTi These SRs; apply to each Function in Table 3.3.3 SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK. 31 days Il SR 3.3.3.1.2 Deleted SR 3.3.3.1.3 Perform CHANNEL CALIBRATION. 18 months RIVER BEND 3.3-21 Amendment No. 9 ,142

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)

Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REQUIRED REQUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Steam Dome Pressure 2 E
2. Reactor Vessel Water Level - Wide Range 2 E
3. Reactor Vessel Water Level - Fuel Zone 2 E
4. Suppression Pool Water Level 2 E
5. Suppression Pool Sector Water Temperature 2(a) E
6. Drywell Pressure 2 E
7. Primary Containment Pressure 2 E
8. Drywell Area Radiation 2 F
9. Primary Containment Area Radiation 2 F
10. Deleted I
11. Deleted I
12. Penetration Flow Path, Automatic PCIV 2 per penetration E Position flow path (b)(c)

(a) Monitoring each of two sectors.

(b) Not required for isolation valves whose associated penetration flow path is isolated.

(c) Only one position indication channel is required for penetration flow paths with only one control room indication channel.

RIVER BEND 3.3-22 Amendment No. 81 95,142

3.6 CONTAINMENT SYSTEMS 3.6.3.1 DELETED I RIVER BEND 3.6-39 Amendment No. 84,142

THIS PAGE INTENTIONALLY LEFT BLANK I RIVER BEND 3.6-40 Amendment No. g4,1 42