Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports
ML051520096
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/25/2005
From:
NRC/NRR/DLPM/LPD4
To:
Webb M, NRR/DLPM, 415-1347
Shared Package
ml051460546 List:
References
TAC MC5552
Download: ML051520096 (2)


Text

Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.

5.6.1 Deleted 5.6.2 Annual Radiological Environmental Operating Report The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 1 of each year. The report shall include summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.

The Annual Radiological Environmental Operating Report shall include the results of analyses of all radiological environmental samples and of all environmental radiation measurements taken during the period pursuant to the locations specified inthe table and figures in the ODCM, as well as summarized and tabulated results of these analyses and measurements in the format of the table in the Radiological Assessment Branch Technical Position, Revision 1, November 1979. Inthe event that some individual (continued)

RIVER BEND 5.0-1 7 Amendment No. 84, 145

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.2 Annual Radiological Environmental Operating Report (continued) results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.

5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the unit during the previous calendar year shall be submitted by May 1 of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and process control program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.

5.6.4 Deleted 5.6.5 CORE OPERATING LIMITS REPORT (COLR)

a. Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1) LCO 3.2.1, Average Planar Linear Heat Generation Rate (APLHGR),
2) LCO 3.2.2, Minimum Critical Power Ratio (MCPR)(including power and flow dependent limits).
3) LCO 3.2.3, Linear Heat Generation Rate (LHGR)(including power and flow dependent limits).
4) LCO 3.2.4, Fraction of Core Boiling Boundary (FCBB)
5) LCO 3.3.1.1, RPS Instrumentation (RPS), Function 2.b
6) LCO 3.3.1.3, Periodic Based Detection System (PBDS)
b. The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents.

(continued)

RIVER BEND 5.0-18 Amendment No. 81 100 106 122 135,145