Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip InstrumentationML052630396 |
Person / Time |
---|
Site: |
River Bend |
---|
Issue date: |
08/25/2005 |
---|
From: |
NRC/NRR/DLPM |
---|
To: |
|
---|
References |
---|
TAC MC4582 |
Download: ML052630396 (2) |
|
|
---|
Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating.2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating. RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation2011-07-27027 July 2011 License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For....2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.... RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-08-17017 August 2010 Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater ML0804402932008-01-25025 January 2008 License Amendment Request, Main Turbine Bypass System ML0722200262007-08-30030 August 2007 Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). ML0709204582007-05-0303 May 2007 Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves2006-09-19019 September 2006 License Amendment Request, Leakage Rate Testing of Containment Purge Valves ML0613802362006-05-17017 May 2006 Technical Specifications, Removal of Temp Note to Loss of Power ML0606004262006-02-0909 February 2006 Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements2005-12-19019 December 2005 License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements ML0529800692005-10-0707 October 2005 Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger ML0527303232005-09-15015 September 2005 Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements2005-08-31031 August 2005 License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements ML0526303962005-08-25025 August 2005 Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation ML0515200962005-05-25025 May 2005 Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval2005-03-0808 March 2005 License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval ML0432101302004-10-15015 October 2004 Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification ML0432101402004-10-15015 October 2004 Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval ML0427902222004-10-0404 October 2004 Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors ML0423301222004-08-12012 August 2004 Tech Spec Pages for Amendment 141 Removal of Mode Restrictions for Surveillance Testing of the Division III Battery ML0417604842004-06-16016 June 2004 Technical Specifications, Revised Action for Scram Discharge Volume Vent and Drain Valves 2023-12-14
[Table view] |
Text
EOC-RPT Instrumentation 3.3.4.1 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation I Function listed below shall be OPERABLE:
- 1. Turbine Stop Valve (TSV) Closure; and
- 2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure-Low.
OR
- b. LCO 3.2.2, 'MINIMUM CRITICAL POWER RATIO (MCPR),m and LCO 3.2.3, 'Linear Heat Generation Rate (LHGR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
APPLICABILITY: THERMAL POWER 2 40% RTP with any recirculation pump in fast speed.
ACTIONS
A------------------NOTE---
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. OPERABLE status.
OR A.2 -- N OTE---------
Not applicable if inoperable channel is the result of an inoperable breaker.
Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)
RIVER BEND 3.3-25 Amendment No. 9i-, 146 1
EOC-RPT Instrumentation 3.3.4.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. One or more Functions B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> with EOC-RPT trip capability.
capability not maintained.
OR AND B.2 Apply the MCPR and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR and LHGR limits for LHGR limits for inoperable EOC-RPT not inoperable EOC-RPT as made applicable. specified in the COLR.
C. Required Action and C.1 Remove the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> associated Completion recirculation pump fast Time not met. speed breaker from service.
OR C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 40% RTP.
RIVER BEND 3.3-26 Amendment No. 4, 146 l