Letter Sequence Other |
---|
|
|
MONTHYEARRBG-46754, Revision to License Amendment Request, Application for Technical Specification (TS) Change Regarding Ventilation Filter Testing Program (Vftp), TS 5.5.7, Control Room Fresh Air System (Crfas) Heater Wattage2007-10-24024 October 2007 Revision to License Amendment Request, Application for Technical Specification (TS) Change Regarding Ventilation Filter Testing Program (Vftp), TS 5.5.7, Control Room Fresh Air System (Crfas) Heater Wattage Project stage: Request ML0801605492008-02-28028 February 2008 Issuance of Amendment No. 159, Revision of Required Wattage in Technical Specification 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater Project stage: Approval ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater Project stage: Other ML0812207352008-05-0808 May 2008 Correction to Amendment No. 159, Revision of Required Wattage in TS 5.5.7, Ventilation Filter Testing Program for Control Room Fresh Air System Heater Tac No. MD4961) Project stage: Other 2008-02-28
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19357A0092019-12-31031 December 2019 Redacted - Issuance of Amendment No. 201 Change to the Neutron Absorbing Material Credited in Spent Fuel Pool for Criticality Control ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For..2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.. RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation2011-07-27027 July 2011 License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-08-17017 August 2010 Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors ML0901301612009-01-23023 January 2009 Issuance of Amendment No. 161, Revise Technical Specification Surveillance Requirements Consistent with TSTF-475, Revision 1, Control Rod Notch Surveillance Frequency ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater ML0804402932008-01-25025 January 2008 License Amendment Request, Main Turbine Bypass System ML0722200262007-08-30030 August 2007 Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr) ML0709204582007-05-0303 May 2007 Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves2006-09-19019 September 2006 License Amendment Request, Leakage Rate Testing of Containment Purge Valves ML0613802362006-05-17017 May 2006 Technical Specifications, Removal of Temp Note to Loss of Power ML0606004262006-02-0909 February 2006 Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements2005-12-19019 December 2005 License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements ML0529800692005-10-0707 October 2005 Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger ML0527303232005-09-15015 September 2005 Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements2005-08-31031 August 2005 License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements ML0526303962005-08-25025 August 2005 Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation ML0515200962005-05-25025 May 2005 Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval2005-03-0808 March 2005 License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval ML0432101302004-10-15015 October 2004 Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification ML0432101402004-10-15015 October 2004 Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval ML0427902222004-10-0404 October 2004 Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors 2023-12-14
[Table view] |
Text
(3)
EOI, pursuant to the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4)
EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5)
EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6)
EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C.
This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1)
Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein. The items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2)
Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Amendment No.
159 159
Programs and Manuals 5.5 RIVER BEND 5.0-13 Amendment No. 81, 5.5 Programs and Manuals 5.5.7 Ventilation Filter Testing Program (VFTP) (continued)
- e.
Demonstrate that the heaters for each of the ESF systems dissipate the value specified below when tested in accordance with ASME N510-1989:
ESF Ventilation System Wattage SGTS t 61 kW FBVS t 49 kW CRFAS
>15 kW The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the VFTP test frequencies.
5.5.8 Explosive Gas and Storage Tank Radioactivity Monitoring Program This program provides controls for potentially explosive gas mixtures contained in the main condenser offgas treatment system and the quantity of radioactivity contained in unprotected outdoor liquid storage tanks.
The program shall include:
- a.
The limits for concentrations of hydrogen in the main condenser offgas treatment system and a surveillance program to ensure the limits are maintained. Such limits shall be appropriate to the system's design criteria (i.e., whether or not the system is designed to withstand a hydrogen explosion); and
- b.
A surveillance program to ensure that the quantity of radioactive material contained in any unprotected outdoor tank is limited to d 10 curies, excluding tritium and dissolved or entrained noble gases.
The provisions of SR 3.0.2 and SR 3.0.3 are applicable to the Explosive Gas and Storage Tank Radioactivity Monitoring Program surveillance frequencies.
5.5.9 Diesel Fuel Oil Testing Program A diesel fuel oil testing program to implement required testing of both new fuel oil and stored fuel oil shall be established. The (continued) 159