ML22342B280

From kanterella
Jump to navigation Jump to search

Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1
ML22342B280
Person / Time
Site: Grand Gulf, River Bend  Entergy icon.png
Issue date: 12/28/2022
From: James Drake
Plant Licensing Branch IV
To: Gaston R
Entergy Operations
Lingam S, 301-415-1564
References
EPID L-2022-LLA-0080
Download: ML22342B280 (23)


Text

December 28, 2022 Mr. Ron Gaston Vice President, Regulatory Assurance Licensing Entergy Services, LLC M-ECH-29 1340 Echelon Parkway Jackson, MS 39213

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 AND RIVER BEND STATION, UNIT 1 - ISSUANCE OF AMENDMENTS RE: ADOPTION TSTF-580, PROVIDE EXCEPTION FROM ENTERING MODE 4 WITH NO OPERABLE RHR SHUTDOWN COOLING, REVISION 1 (EPID L-2022-LLA-0080)

Dear Mr. Gaston:

The U.S. Nuclear Regulatory Commission has issued amendments consisting of changes to the Technical Specifications (TSs) in response to your application dated May 26, 2022. The following amendments are enclosed:

Amendment No. 232 to Renewed Facility Operating License No. NPF-29 for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf);

Amendment No. 212 to Renewed Facility Operating License No. NPF-47 for River Bend Station, Unit 1 (River Bend);

The amendments would revise Grand Gulf and River Bend TS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, in accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling. Specifically, the proposed changes provide a TS exception to entering Mode 4 if both RHR shutdown cooling subsystems are inoperable.

R. Gaston A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions Federal Register notice.

Sincerely,

/RA/

Jason J. Drake, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-416 and 50-458

Enclosures:

1. Amendment No. 232 to NPF-29
2. Amendment No. 212 to NPF-47
3. Safety Evaluation
4. Notices and Environmental Findings cc: Listserv

ENTERGY OPERATIONS, INC.

SYSTEM ENERGY RESOURCES, INC.

COOPERATIVE ENERGY, A MISSISSIPPI ELECTRIC COOPERATIVE ENTERGY MISSISSIPPI, LLC DOCKET NO. 50-416 GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 232 Renewed License No. NPF-29

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Entergy Operations, Inc. (the licensee), dated May 26, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

Enclosure 1

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-29 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 232 are hereby incorporated into this renewed license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by William William T. T. Orders Date: 2022.12.28 Orders 13:47:22 -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-29 and the Technical Specifications Date of Issuance: December 28, 2022

ATTACHMENT TO LICENSE AMENDMENT NO. 232 RENEWED FACILITY OPERATING LICENSE NO. NPF-29 GRAND GULF NUCLEAR STATION, UNIT 1 DOCKET NO. 50-416 Replace the following page of Renewed Facility Operating License No. NPF-29 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Operating License REMOVE INSERT Technical Specifications REMOVE INSERT 3.4-21 3.4-21 3.4-22 3.4-22


3.4-22A

amended, are fully applicable to the lessors and any successors in interest to those lessors, as long as the renewed license of GGNS Unit 1 remains in effect.

(b) SERI is required to notify the NRC in writing prior to any change in (i) the terms or conditions of any new or existing sale or lease agreements executed as part of the above authorized financial transactions, (ii) the GGNS Unit 1 operating agreement, (iii) the existing property insurance coverage for GGNS Unit 1 that would materially alter the representations and conditions set forth in the Staff's Safety Evaluation Report dated December 19, 1988 attached to Amendment No. 54. In addition, SERI is required to notify the NRC of any action by a lessor or other successor in interest to SERI that may have an effect on the operation of the facility.

C. The renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level Entergy Operations, Inc. is authorized to operate the facility at reactor core power levels not in excess of 4408 megawatts thermal (100 percent power) in accordance with the conditions specified herein.

(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 232 are hereby incorporated into this renewed license. Entergy Operations, Inc. shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

During Cycle 19, GGNS will conduct monitoring of the Oscillation Power Range Monitor (OPRM). During this time, the OPRM Upscale function (Function 2.f of Technical Specification Table 3.3.1.1-1) will be disabled and operated in an indicate only mode and technical specification requirements will not apply to this function. During such time, Backup Stability Protection measures will be implemented via GGNS procedures to provide an alternate method to detect and suppress reactor core thermal hydraulic instability oscillations. Once monitoring has been successfully completed, the OPRM Upscale function will be enabled and technical specification requirements will be applied to the function; no further operating with this function in an indicate only mode will be conducted.

4 Amendment No. 232

RHR Shutdown Cooling System Hot Shutdown 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES------------------------------------------------

 Both RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.

 One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.

APPLICABILITY: MODE 3 with reactor steam dome pressure less than the RHR cut in permissive pressure.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR shutdown cooling A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> subsystem inoperable. method of decay heat removal is available. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)

GRAND GULF 3.4-21 Amendment No. 142,, 225

RHR Shutdown Cooling System Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem to met. OPERABLE status.

C. Two RHR shutdown C.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems method of decay heat AND inoperable. removal is available for each inoperable Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> RHR shutdown cooling thereafter subsystem.


NOTE-----------------

D. Required Action and LCO 3.0.3 and all other LCO associatedCompletion Required Actions requiring a MODE Time of Condition C not change to MODE 4 may be met.

suspended until one RHR shutdown cooling subsystem is restored to OPERABLE status.

D.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem to OPERABLE status.

(continued)

GRAND GULF 3.4-22 Amendment No.

RHR Shutdown Cooling System Hot Shutdown 3.4.9 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME E. No RHR shutdown cooling E.1 Initiate action to restore Immediately subsystem in operation. one RHR shutdown cooling subsystem or one AND recirculation pump to operation.

No recirculation pump in operation. AND E.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery circulation by an of no reactor coolant alternate method. circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND E.3 Monitor reactor coolant Once per hour temperature and pressure.

GRAND GULF 3.4-2$ Amendment No.

ENTERGY LOUISIANA, LLC AND ENTERGY OPERATIONS, INC.

DOCKET NO. 50-458 RIVER BEND STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 212 Renewed License No. NPF-47

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Entergy Operations, Inc. (EOI, the licensee),

dated May 26, 2022, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.

Enclosure 2

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-47 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 212 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. The license amendment is effective as of its date of issuance and shall be implemented within 90 days from the date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Digitally signed by William T. William T. Orders Date: 2022.12.28 Orders 14:23:04 -05'00' Jennifer L. Dixon-Herrity, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to Renewed Facility Operating License No. NPF-47 and the Technical Specifications Date of Issuance: December 28, 2022

ATTACHMENT TO LICENSE AMENDMENT NO. 212 RENEWED FACILITY OPERATING LICENSE NO. NPF-47 RIVER BEND STATION, UNIT 1 DOCKET NO. 50-458 Replace the following pages of Renewed Facility Operating License No. NPF-47 and the Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.

Facility Operating License Remove Insert Technical Specifications Remove Insert 3.4-22 3.4-22 3.4-23 3.4-23


3.4-23A

(2) EOI, pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use and operate the facility at the above designated location in accordance with the procedures and limitations set forth in this renewed license; (3) EOI, pursuant to Section 103 of the Act and 10 CFR Part 70, to receive, possess and to use at any time special nuclear material as reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) EOI, pursuant to Section 103 of the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

(7) EOI, pursuant to the Act and 10 CFR Part 30, 40, and 70 to receive, possess and use, in amounts as required, such byproduct and special nuclear materials as may be produced by the operation of Arkansas Nuclear One, Units 1 and 2, Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit 3, without restriction to chemical or physical form for the purposes of sample analysis, equipment calibration, or equipment repair.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level EOI is authorized to operate the facility at reactor core power levels not in excess of 3091 megawatts thermal (100% rated power) in accordance with the conditions specified herein.

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 212 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. EOI shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

Amendment No. 212

RHR Shutdown Cooling System - Hot Shutdown 3.4.9 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.9 Residual Heat Removal (RHR) Shutdown Cooling SystemHot Shutdown LCO 3.4.9 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES--------------------------------------------

1. Both RHR shutdown cooling subsystems and recirculation pumps may be removed from operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for performance of Surveillances.

APPLICABILITY: MODE 3 with reactor steam dome pressure less than the RHR cut in permissive pressure.

ACTIONS


NOTE---------------------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One RHR shutdown A.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystem method of decay heat inoperable. removal is available. AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter (continued)

RIVER BEND 3.4-22 Amendment No. 81, 156, 204, 212

RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Required Action and B.1 Initiate action to restore Immediately associated Completion RHR shutdown cooling Time of Condition A not subsystem to met. OPERABLE status.

C. Two RHR shutdown C.1 Verify an alternate 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> cooling subsystems method of decay heat inoperable. removal is available for AND each inoperable RHR shutdown cooling Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> subsystem. thereafter D. Required Action and --------------------NOTE-----------------

associated Completion LCO 3.0.3 and all other LCO Time of Condition C not Required Actions requiring a met. MODE change to MODE 4 may be suspended until one RHR shutdown cooling subsystem is restored to OPERABLE status.

D.1 Initiate action to restore Immediately one RHR shutdown cooling subsystem to OPERABLE status.

(continued)

RIVER BEND 3.4-23 Amendment No. 81, 204, 212

RHR Shutdown Cooling System - Hot Shutdown 3.4.9 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. No RHR shutdown cooling E.1 Initiate action to restore Immediately subsystem in operation. one RHR shutdown cooling subsystem or AND one recirculation pump to operation.

No recirculation pump in operation. AND E.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from circulation by an discovery of no alternate method. reactor coolant circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND E.3 Monitor reactor coolant Once per hour temperature and pressure.

RIVER BEND 3.4-23A Amendment No. 212

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 232 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-29 AND AMENDMENT NO. 212 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.

GRAND GULF NUCLEAR STATION, UNIT 1 RIVER BEND STATION, UNIT 1 DOCKET NOS. 50-416 AND 50-458 Application (i.e., initial and supplements) Safety Evaluation Date May 26, 2022, ML22146A189 December 28, 2022 Principal Contributors to Safety Evaluation Ravi Grover, NRR/DSS/STSB

1.0 PROPOSED CHANGE

S Entergy Operations, Inc. (Entergy, the licensee) requested changes to the technical specifications (TSs) for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf) and River Bend Station, Unit 1 (River Bend) by license amendment request (LAR, application) dated May 26, 2022. In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendments under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, TS based on Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), and the associated NRC staff safety evaluation (SE) for TSTF-580 (ML21188A227).

Irradiated fuel in the shutdown reactor core generates heat during the decay of fission products and increases the temperature of the reactor coolant. This decay heat must be removed to reduce the temperature of the reactor coolant to less than or equal to 212 degrees Fahrenheit.

This decay heat is removed by the RHR shutdown cooling system in preparation for performing refueling or maintenance operations, or for keeping the reactor in the hot shutdown condition or cold shutdown condition.

The reactor coolant system design for Grand Gulf and River Bend consists of two redundant, manually controlled shutdown cooling subsystems of the RHR system to provide decay heat removal. Each loop consists of motor-driven pumps, a heat exchanger, and associated piping Enclosure 3

and valves. The RHR heat exchangers transfer heat to the RHR service water system. Some piping and heat exchangers that are passive components may be common to both subsystems.

The Grand Gulf and River Bend TS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, is applicable in Mode 3, with the reactor steam dome pressure less than the RHR shutdown cooling isolation pressure. The limiting condition for operation (LCO) requires two operable RHR shutdown cooling subsystems and, if no recirculation pump is in operation, then at least one RHR shutdown cooling subsystem needs to be in operation.

1.1 Proposed TS Changes to Adopt TSTF-580 In accordance with NRC staff approved TSTF-580, the licensee proposed changes that would revise TS 3.4.9, for Grand Gulf and River Bend. Specifically, the licensee proposed the following changes to adopt TSTF-580:

Condition A is changed to be limited to a single inoperable subsystem by revising it to state: One RHR shutdown cooling subsystem inoperable with a Required Action to Verify an alternate method of decay heat removal is available.

Condition B addresses situations when Required Action A.1 and associated completion time (CT) are not met. The plural (s) is deleted in Required Action B.1 as a conforming change to Condition A, which now addresses a single inoperable RHR shutdown cooling subsystem.

A new Condition C is added, which addresses two RHR shutdown cooling subsystems inoperable with a Required Action C.1 to verify an alternate method of decay heat removal is available for each inoperable RHR shutdown cooling subsystem. The new Condition C Required Action has a CT of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.

A new Condition D is added to address situations when new Required Action C.1 and associated CT are not met. New Required Action D.1 requires action be initiated to restore one RHR shutdown cooling subsystem to operable status immediately. Required Action D.1 is modified by a note that states that LCO 3.0.3 and all other LCO Required Actions requiring a mode change to Mode 4 may be suspended until one RHR shutdown cooling subsystem is restored to operable status.

Existing Condition C and associated Required Actions are renumbered as Condition E due to the new Conditions C and D.

1.2 Additional Proposed TS Changes The application states that Entergy is not proposing any variations from the TS changes described in TSTF-580 or the applicable parts of the NRC SE dated July 11, 2021.

2.0 REGULATORY EVALUATION

The regulation at paragraph 50.36(c)(2) of Title 10 of the Code of Federal Regulations (10 CFR) requires that TSs include LCOs. Per 10 CFR 50.36(c)(2)(i), LCOs are the lowest functional capability or performance levels of equipment required for safe operation of the facility. The regulation also requires that when an LCO of a nuclear reactor is not met, the licensee shall

shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met.

The NRC staffs guidance for the review of TSs is in Chapter 16.0, Technical Specifications, of NUREG-0800, Revision 3, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR [Light-Water Reactor] Edition (SRP), March 2010 (ADAMS Accession No. ML100351425). As described therein, as part of the regulatory standardization effort, the NRC staff has prepared Standard TSs (STSs) for each of the LWR nuclear designs.

Accordingly, the NRC staffs review includes consideration of whether the proposed changes are consistent with the STSs, as modified by NRC approved travelers.

Traveler TSTF-580 revised the STSs related to RHR shutdown cooling system. The NRC approved TSTF-580 under the CLIIP on July 11, 2021 (ADAMS Package Accession No. ML21188A283).

3.0 TECHNICAL EVALUATION

3.1 Proposed TS Changes to Adopt TSTF-580 The NRC staff compared the licensees proposed TS changes in section 1.1 of this SE against the changes approved in TSTF-580. In accordance with the SRP, chapter 16.0, the NRC staff determined that the STS changes approved in TSTF-580 are applicable because the Grand Gulf and River Bend units are boiling-water reactor (BWR) design plants, and the NRC staff approved the TSTF-580 changes for BWR designs. The NRC staff finds that the licensees proposed changes to the Grand Gulf and River Bend TSs in section 1.1 of this SE are consistent with those found acceptable in TSTF-580.

In the SE of TSTF-580, the NRC staff concluded that TSTF-580 changes to STS 3.4.9, Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, Condition A, Required Actions A.1 and B.1, and new Condition C, Required Action C.1 and associated CTs were acceptable because these changes preserve the existing requirements and do not alter the way the TSs are implemented. Therefore, the NRC staff finds these continue to meet the requirements of 10 CFR 50.36(c)(2)(i) by providing remedial actions for when the LCO is not met.

The NRC staff also concluded that the TSTF-580 proposed addition of new Condition D to STS 3.4.9 is acceptable, because, without an operable RHR shutdown cooling subsystem and in a period of high decay heat load, it may not be possible to reduce the RCS temperature to the Mode 4 entry condition within the CT. Under this condition, remaining in Mode 3 allows fission product decay heat and other residual heat from the reactor core to be transferred at a rate such that specified acceptable fuel design limits and the design conditions of the reactor coolant pressure boundary will not be exceeded. The CT reflects the importance of restoring a normal path for heat removal. The NRC staff finds that proposed new Condition D and associated Required Action D.1 and the CT, are acceptable because they provide appropriate remedial actions if the LCO is not met and, therefore, continue to meet the requirements of 10 CFR 50.36(c)(2)(i).

3.2 Conclusion The NRC staff finds that the proposed changes to Grand Gulf and River Bend TS LCO 3.4.9 are acceptable because the remedial actions continue to be required when the LCO is not met and

provide adequate protection of the health and safety of the public. Thus, the proposed changes continue to meet the requirements of 10 CFR 50.36(c)(2)(i) as discussed in section 3.0 of the NRC staffs SE for TSTF-580.

3.3 TS Change Consistency The NRC staff reviewed the proposed TS changes for technical clarity and consistency with the existing requirements for customary terminology and formatting. The NRC staff finds that the proposed changes are consistent with Chapter 16.0 of the SRP and are therefore acceptable.

4.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

NOTICES AND ENVIRONMENTAL FINDINGS RELATED TO AMENDMENT NO. 232 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-29 AND AMENDMENT NO. 212 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-47 ENTERGY OPERATIONS, INC.

GRAND GULF NUCLEAR STATION, UNIT 1 RIVER BEND STATION, UNIT 1 DOCKET NOS. 50-416 AND 50-458 Application (i.e., initial and supplements) Safety Evaluation Date May 26, 2022, ML22146A189 December 28, 2022

1.0 INTRODUCTION

Entergy Operations, Inc. (Entergy, the licensee) requested changes to the technical specifications (TSs) for Grand Gulf Nuclear Station, Unit 1 (Grand Gulf) and River Bend Station, Unit 1 (River Bend) by license amendment request (LAR, application), dated May 26, 2022. In its application, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed amendments under the Consolidated Line Item Improvement Process (CLIIP). The proposed changes would revise the Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown, TS based on Technical Specifications Task Force (TSTF) Traveler TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21025A232), and the associated NRC staff safety evaluation (SE) for TSTF-580 (ML21188A227).

2.0 STATE CONSULTATION

In accordance with the Commissions regulations, State officials for Mississippi and Louisiana were notified of the proposed issuance of the amendment on December 22, 2022. The State officials had no comments.

3.0 ENVIRONMENTAL CONSIDERATION

The amendments change requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change Enclosure 4

in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, published in the Federal Register on July 15, 2022 (87 FR 42509), and there has been no public comment on such finding. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

ML22342B280 *by email OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DSS/STSB/BC* OGC*

NAME JDrake PBlechman VCusumano STurk DATE 12/1/22 12/8/22 10/31/22 12/14/22 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL/PM*

NAME JDixon-Herrity (WOrders for) JDrake DATE 12/28/22 12/28/22