Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval
ML043210140
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/15/2004
From: Michael Webb
NRC/NRR/DLPM/LPD4
To:
References
TAC MC2071
Download: ML043210140 (1)


Text

Drywell 3.6.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.5.1.3 Verify bypass leakage is less than or equal to the -----NOTE---

bypass leakage limit. SR 3.0.2 is not applicable for However, during the first unit startup following extensions > 12 bypass leakage testing performed in accordance months with this SR, the acceptance criterion is s 10% of the drywell bypass leakage limit.

24 months following 2 consecutive tests with bypass leakage greater than the bypass leakage limit until 2 consecutive tests are less than or equal to the bypass leakage limit AND 48 months following a test with bypass leakage greater than the bypass leakage limit AND 120 months except that the next drywell leak rate test performed after the June 24, 1994 test shall be performed no later than June 23, 2009.

RIVER BEND 3.6-61 Amendment No. 81 87, 144