Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K12314 October 1999Revised Positions for DBNPS & Pnpp QA ProgramOffsite Dose Calculation Manual
Coatings
Nondestructive Examination
Process Control Program
Fire Protection Program
ML18017A9188 October 1999LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr
ML20217E8027 October 1999CPSES Unit 1 Cycle 8 ColrShutdown Margin
ML20217G41530 September 1999Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2Coast down
ML20217K80430 September 1999Rev 1 to Vegp,Unit 2 Cycle 7 ColrShutdown Margin
ML20217K77430 September 1999Rev 1 to Vegp,Unit 1 Cycle 9 ColrShutdown Margin
ML20217K45930 September 1999Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With
ML20217E33830 September 1999Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3
ML20217F99230 September 1999Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With
ML20217H02030 September 1999Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20212J20130 September 1999Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico
ML18017A91530 September 1999Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With30 September 1999Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with30 September 1999Monthly Operating Rept for Sept 1999 for River Bend Station. with
ML20212F76724 September 1999SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i)Incorporated by reference
ML20212F56423 September 1999SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity LimitsFire Barrier
ML20216J57016 September 1999Rev 2 to CPSES Unit 2 Cycle 5 ColrShutdown Margin
ML20212A14713 September 1999Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established
ML18017A86710 September 1999LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr
ML20211Q3179 September 1999Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996
ML20216G1209 September 1999Rev 3 to Rbs,Cycle 9 ColrShutdown Margin
Anticipated operational occurrence
ML20216E5407 September 1999Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826
ML20211N0513 September 1999SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design BasisSevere Accident Management Guideline
Exemption Request
Fuel cladding
ML20216E50631 August 1999Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with
ML20211Q82031 August 1999Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With
ML20216E48831 August 1999Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With
ML20212B47131 August 1999Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20217H03231 August 1999Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2
ML20211B12831 August 1999Dynamic Rod Worth Measurement Using Casmo/Simulate
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With31 August 1999Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With
ML18017A86231 August 1999Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With31 August 1999Monthly Operating Repts for Aug 1999 for Cpses.With
ML20211H86223 August 1999Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI IntervalCoatings
ML20211A97920 August 1999Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2Incorporated by reference
ML20211F34417 August 1999Updated non-proprietary Page 2-4 of TR DPC-NE-2009
ML20211C12917 August 1999ISI Rept Unit 1 Catawba 1999 RFO 11Dissimilar Metal Weld
ML20211H79213 August 1999Safety Evaluation Supporting Amend 126 to License DPR-54
ML20210P47311 August 1999COLR Cycle 10 Songs,Unit 2Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20210P47911 August 1999COLR Cycle 10 Songs,Unit 3Shutdown Margin
Anticipated operational occurrence
Fuel cladding
NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant9 August 1999SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power PlantIncorporated by reference
ML20210R1056 August 1999Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection6 August 1999Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection
ML20211M2986 August 1999Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1
ML18016B0484 August 1999LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised
ML20210K4723 August 1999SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate ValvesPower-Operated Valves
Backfit
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With31 July 1999Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With
ML20210U40831 July 1999Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2Downpower
ML20210Q65231 July 1999Monthly Operating Repts for July 1999 for Songs,Units 2 & 3