Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K123 | 14 October 1999 | Revised Positions for DBNPS & Pnpp QA Program | Offsite Dose Calculation Manual Coatings Nondestructive Examination Process Control Program Fire Protection Program |
ML18017A918 | 8 October 1999 | LER 99-008-00:on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With 991008 Ltr | |
ML20217E802 | 7 October 1999 | CPSES Unit 1 Cycle 8 Colr | Shutdown Margin |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 | Coast down |
ML20217K804 | 30 September 1999 | Rev 1 to Vegp,Unit 2 Cycle 7 Colr | Shutdown Margin |
ML20217K774 | 30 September 1999 | Rev 1 to Vegp,Unit 1 Cycle 9 Colr | Shutdown Margin |
ML20217K459 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With | |
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20217F992 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20217H020 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20212J201 | 30 September 1999 | Safety Evaluation Supporting Transfer of Dl Ownership Interest in Pnpp to Ceico | |
ML18017A915 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with 991012 Ltr | |
PY-CEI-NRR-2437, Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Pnpp,Unit 1.With | |
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with | 30 September 1999 | Monthly Operating Rept for Sept 1999 for River Bend Station. with | |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20212F564 | 23 September 1999 | SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits | Fire Barrier |
ML20216J570 | 16 September 1999 | Rev 2 to CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML18017A867 | 10 September 1999 | LER 99-007-00:on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With 990910 Ltr | |
ML20211Q317 | 9 September 1999 | Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 | |
ML20216G120 | 9 September 1999 | Rev 3 to Rbs,Cycle 9 Colr | Shutdown Margin Anticipated operational occurrence |
ML20216E540 | 7 September 1999 | Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML20216E506 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with | |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | |
ML20216E488 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With | |
ML20212B471 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20217H032 | 31 August 1999 | Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 | |
ML20211B128 | 31 August 1999 | Dynamic Rod Worth Measurement Using Casmo/Simulate | |
PY-CEI-NRR-2429, Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pnpp,Unit 1.With | |
ML18017A862 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr | |
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Cpses.With | |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20211A979 | 20 August 1999 | Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 | Incorporated by reference |
ML20211F344 | 17 August 1999 | Updated non-proprietary Page 2-4 of TR DPC-NE-2009 | |
ML20211C129 | 17 August 1999 | ISI Rept Unit 1 Catawba 1999 RFO 11 | Dissimilar Metal Weld |
ML20211H792 | 13 August 1999 | Safety Evaluation Supporting Amend 126 to License DPR-54 | |
ML20210P473 | 11 August 1999 | COLR Cycle 10 Songs,Unit 2 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P479 | 11 August 1999 | COLR Cycle 10 Songs,Unit 3 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
NUREG-1482, SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | 9 August 1999 | SE Approving Licensee Relief Requets PR-2,PR-3,PR-6,VR-6, VR-7,VR-10,PR-4,PR-5,VR-4,VR-5,VR-9,VR-1 & VR-3 Related to Inservice Testing Program,Second ten-year Interval for Perry Nuclear Power Plant | Incorporated by reference |
ML20210R105 | 6 August 1999 | Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced | |
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | 6 August 1999 | Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | |
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
ML18016B048 | 4 August 1999 | LER 99-006-01:on 981124,noted Failure to Comply with TS 4.0.4 & TS 3/4.6.3, Civs. Caused by post-maint Testing That Did Not Adequately Test Control Circuitry & Verify Isolation Time Following Maint.Procedure Was Revised | |
ML20210K472 | 3 August 1999 | SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | Power-Operated Valves Backfit |
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | |
ML20210U408 | 31 July 1999 | Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 | Downpower |
ML20210Q652 | 31 July 1999 | Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 |