Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217K993 | 14 October 1999 | Safety Evaluation Supporting Amend 234 to License DPR-56 | |
ML20217B433 | 5 October 1999 | Safety Evaluation Supporting Amend 233 to License DPR-56 | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
ML20217K445 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20217G354 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with | |
ML20216H709 | 24 September 1999 | Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively | |
ML20212D128 | 17 September 1999 | Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 | Coatings Nondestructive Examination VT-2 Incorporated by reference |
ML20211P673 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20212A587 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With | |
ML20211D550 | 23 August 1999 | Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively | Offsite Dose Calculation Manual |
ML20212H631 | 19 August 1999 | Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 | Unanalyzed Condition |
ML20211A705 | 31 July 1999 | Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With | |
ML20210N764 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with | |
ML20209G063 | 30 June 1999 | Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20209H112 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with | |
ML20212H549 | 18 June 1999 | Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium |
ML20195H884 | 31 May 1999 | Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with | |
ML20195E796 | 31 May 1999 | Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20206N743 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20206N166 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with | |
ML20206A292 | 20 April 1999 | Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown Pressure Boundary Leakage |
ML20205K741 | 7 April 1999 | Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively | |
ML20205P585 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With | |
ML20205P540 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20207G997 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With | |
ML20204C820 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With | |
ML20195E832 | 31 December 1998 | 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With | Safe Shutdown Shutdown Margin Non-Destructive Examination Grab sample Fire Barrier Stroke time Temporary Modification Flow Induced Vibration |
ML20199E347 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With | |
ML20206D365 | 31 December 1998 | 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with | Process Control Program |
ML20206D359 | 31 December 1998 | 1998 PBAPS Annual 10CFR72.48 Rept. with | |
ML20199E467 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20205K038 | 31 December 1998 | PECO Energy 1998 Annual Rept. with | |
ML20206P165 | 31 December 1998 | Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection | Safe Shutdown Fire Barrier Locked High Radiation Area Systematic Assessment of Licensee Performance Exemption Request Fire Protection Program |
ML20196G702 | 2 December 1998 | SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles | Hydrostatic Incorporated by reference |
ML20196E826 | 30 November 1998 | Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 | |
ML20198B859 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with | |
ML20198D209 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20206R257 | 17 November 1998 | PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 | Operating Basis Earthquake Earthquake Fuel cladding |
ML20195J859 | 12 November 1998 | Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan | |
ML20195C427 | 6 November 1998 | Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle | Safe Shutdown Earthquake |
ML20198C675 | 5 November 1998 | Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 | |
ML20195E534 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with | |
ML20155J302 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With | |
ML20155C607 | 26 October 1998 | Safety Evaluation Supporting Amend 226 to License DPR-44 | Minimum Critical Power Ratio |
ML20155C168 | 22 October 1998 | Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds | |
ML20154R498 | 20 October 1998 | Core Spray Sys Insp Program - 17R | EVT-1 |
ML20154L305 | 14 October 1998 | Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage | |
ML20155H772 | 12 October 1998 | Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 | Unanalyzed Condition |
ML20154J240 | 5 October 1998 | Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively | Foreign Material Exclusion |
ML20154H477 | 5 October 1998 | Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively | Coast down |
ML20154G682 | 1 October 1998 | SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 |