Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217E802 | 7 October 1999 | CPSES Unit 1 Cycle 8 Colr | Shutdown Margin |
ML20217G746 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Cooper Nuclear Station | |
ML20212K978 | 30 September 1999 | Safety Evaluation Accepting USI A-46 Implementation Program | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Earthquake |
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 | Coast down |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20216J570 | 16 September 1999 | Rev 2 to CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML20212C500 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station | |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Cpses.With | |
ML20211D649 | 25 August 1999 | Part 21 Rept Re Nonconformance within LCR-25 safety-related Lead Acid Battery Cells Manufactured by C&D.Analysis of Cells Completed.Analysis of Positive Grid Matl Shows Nonconforming Levels of Calcium within Positive Grid Alloy | |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML20210P473 | 11 August 1999 | COLR Cycle 10 Songs,Unit 2 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P479 | 11 August 1999 | COLR Cycle 10 Songs,Unit 3 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
ML20210R038 | 31 July 1999 | Monthly Operating Rept for July 1999 for Cooper Nuclear Station | |
ML20210U408 | 31 July 1999 | Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 | Downpower |
ML20210Q652 | 31 July 1999 | Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 | |
ML20210L277 | 30 July 1999 | SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services | Nondestructive Examination VT-2 Liquid penetrant |
ML20210J292 | 29 July 1999 | Special Rept:On 990406,OG TS & Associated Charcoal Absorbers Were Removed from Svc.Caused by Scheduled Maint on Hpci. Evaluation of Offsite Effluent Release Dose Effects Was Performed to Ensure Plant Remained in Compliance | |
ML20210D832 | 23 July 1999 | Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp | Coatings Moisture barrier |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | Safe Shutdown Power-Operated Valves |
ML20209H828 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station | Power-Operated Valves Backfit |
ML20211A998 | 12 July 1999 | Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure | |
ML20209H263 | 9 July 1999 | 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage | Hydrostatic Liquid penetrant |
ML20209H272 | 9 July 1999 | 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage | |
ML20209G750 | 8 July 1999 | SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |
ML20196L019 | 8 July 1999 | Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl | Incorporated by reference Liquid penetrant |
ML20209C928 | 30 June 1999 | Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with | |
ML20210J939 | 30 June 1999 | CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 | Temporary Modification |
ML20209G080 | 30 June 1999 | Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20209E106 | 30 June 1999 | Monthly Operating Rept for June 1999 for Cns.With | |
ML20196J062 | 29 June 1999 | Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively | Severe Accident Management Guideline |
ML20196B385 | 17 June 1999 | Summary Rept of Facility Changes,Test & Experiments,Per 10CFR50.59 for Period 970901-990331.Summary of Commitment Changes Made During Same Time Period Also Encl | Hot Short Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Grab sample Fire Barrier Stroke time Anticipated operational occurrence Post Accident Monitoring Hydrostatic Coatings Temporary Modification Emergency Lighting Incorporated by reference Condition Adverse to Quality Missed surveillance Abnormal operational transient Corrosion bonding Design basis earthquake Foreign Material Exclusion Scram Discharge Volume Feedwater Controller Failure Severe Accident Management Guideline Rod Drop Event Earthquake Fuel cladding Through Wall Leak Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Scaffolding Grace period |
ML20195D306 | 2 June 1999 | Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable | Shutdown Margin Job Performance Measure |
ML20195G514 | 31 May 1999 | Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With | |
ML20195H549 | 31 May 1999 | Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 | |
ML20195K285 | 31 May 1999 | Monthly Operating Rept for May 1999 for Cooper Nuclear Station.With | |
ML20216E071 | 21 May 1999 | 1999 Graded Exercise - Comanche Peak Steam Electric Station | Safe Shutdown Grab sample Fire Watch |
ML20206Q009 | 14 May 1999 | Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 | Fire Barrier |
ML20206P048 | 12 May 1999 | Safety Evaluation Concluding That NPP Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at CNS & Adequately Addressed Actions Requested in GL 96-05 | Stroke time Past operability |
ML20196L322 | 11 May 1999 | SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage | Boric Acid Fire Barrier Hydrostatic Nondestructive Examination VT-2 Code Reconciliation Maintenance Rule Program Liquid penetrant Scaffolding |
ML20206H206 | 6 May 1999 | SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 | Probabilistic Risk Assessment Exemption Request Power change |
ML20206H261 | 5 May 1999 | Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays | |
ML20206J081 | 4 May 1999 | Rev 14 to CNS QA Program for Operation | Safe Shutdown Nondestructive Examination Temporary Modification Foreign Material Exclusion Backfit |