ML20217E8027 October 1999CPSES Unit 1 Cycle 8 ColrShutdown Margin
ML20217G41530 September 1999Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2Coast down
ML20212F76724 September 1999SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i)Incorporated by reference
ML20216J57016 September 1999Rev 2 to CPSES Unit 2 Cycle 5 ColrShutdown Margin
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With31 August 1999Monthly Operating Repts for Aug 1999 for Cpses.With
ML20211M2986 August 1999Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1
ML20210U40831 July 1999Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2Downpower
ML20210D83223 July 1999Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment InspCoatings
Moisture barrier
ML20209H76615 July 1999Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2Safe Shutdown
Power-Operated Valves
ML20209H2729 July 19992RF04 Containment ISI Summary Rept First Interval,First Period,First Outage
ML20209H2639 July 19992RF04 ISI Summary Rept First Interval,Second Period,Second OutageHydrostatic
Liquid penetrant
ML20209G7508 July 1999SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric StationSafe Shutdown
High winds
Fire Barrier
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Earthquake
ML20196L0198 July 1999Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also EnclIncorporated by reference
Liquid penetrant
ML20210J93930 June 1999CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630Temporary Modification
ML20209G08030 June 1999Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2
ML20196J06229 June 1999Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 RespectivelySevere Accident Management Guideline
ML20195G51431 May 1999Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With
ML20216E07121 May 19991999 Graded Exercise - Comanche Peak Steam Electric StationSafe Shutdown
Grab sample
Fire Watch
ML20206Q00914 May 1999Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1Fire Barrier
ML20206H2066 May 1999SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2Probabilistic Risk Assessment
Exemption Request
Power change
ML20196L22430 April 1999Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2
ML20205R57014 April 1999Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier SysSafe Shutdown
Fire Barrier
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
ML18016A90112 April 1999Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected
ML20205J7831 April 1999Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 ColrShutdown Margin
ML20205N31031 March 1999Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2Downpower
ML20204H63728 February 1999Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2
ML20205N14828 February 1999Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2
ML20203A4883 February 1999Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2VT-2
Incorporated by reference
ML20210J9201 February 1999CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201Safe Shutdown
Unanalyzed Condition
Reactor Vessel Water Level
Fire Barrier
Enforcement Discretion
Temporary Modification
Missed surveillance
Fire Protection Program
ML20202D01027 January 1999Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1VT-2
Liquid penetrant
ML20199E99631 December 1998Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2
ML20207D60931 December 19981998 Annual Operating Rept for Cpses,Units 1 & 2. withDeep Dose Equivalent
Coast down
ML20197K23730 November 1998Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2
ML20195F31631 October 1998Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2
ML20154B57430 September 1998Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable ProgramStroke time
ML20154M88430 September 1998Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2
ML20151W03631 August 1998Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with
ML20151Q12114 August 1998Rev 0 to Control of Hazard Barriers
ML20237C40614 August 1998Safety Evaluation Supporting Request to Implement Risk Informed IST ProgramSafe Shutdown
Boric Acid
High winds
Stroke time
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Earthquake
ML20237C67231 July 1998Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2Downpower
ML20236V31229 July 1998Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem
ML20236R07130 June 1998Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2
ML20249B25831 May 1998Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2
ML20248A16722 May 1998Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731
ML20247G32430 April 1998Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2
ML20216B8661 April 1998Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr
ML20216J30631 March 1998Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2Coast down
ML20216J18628 February 1998Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station
ML20197A69524 February 1998Inservice Insp Summary Rept,First Interval,Second Period, First Outage
ML20199J5392 February 1998CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801Temporary Modification