Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217E802 | 7 October 1999 | CPSES Unit 1 Cycle 8 Colr | Shutdown Margin |
ML20217G415 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 | Coast down |
ML20212F767 | 24 September 1999 | SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20216J570 | 16 September 1999 | Rev 2 to CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Cpses.With | |
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
ML20210U408 | 31 July 1999 | Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 | Downpower |
ML20210D832 | 23 July 1999 | Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp | Coatings Moisture barrier |
ML20209H766 | 15 July 1999 | Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 | Safe Shutdown Power-Operated Valves |
ML20209H272 | 9 July 1999 | 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage | |
ML20209H263 | 9 July 1999 | 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage | Hydrostatic Liquid penetrant |
ML20209G750 | 8 July 1999 | SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Earthquake |
ML20196L019 | 8 July 1999 | Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl | Incorporated by reference Liquid penetrant |
ML20210J939 | 30 June 1999 | CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 | Temporary Modification |
ML20209G080 | 30 June 1999 | Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 | |
ML20196J062 | 29 June 1999 | Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively | Severe Accident Management Guideline |
ML20195G514 | 31 May 1999 | Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With | |
ML20216E071 | 21 May 1999 | 1999 Graded Exercise - Comanche Peak Steam Electric Station | Safe Shutdown Grab sample Fire Watch |
ML20206Q009 | 14 May 1999 | Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 | Fire Barrier |
ML20206H206 | 6 May 1999 | SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 | Probabilistic Risk Assessment Exemption Request Power change |
ML20196L224 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 | |
ML20205R570 | 14 April 1999 | Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys | Safe Shutdown Fire Barrier Design basis earthquake Earthquake Fire Protection Program Backfit |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205J783 | 1 April 1999 | Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr | Shutdown Margin |
ML20205N310 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 | Downpower |
ML20204H637 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 | |
ML20205N148 | 28 February 1999 | Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 | |
ML20203A488 | 3 February 1999 | Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 | VT-2 Incorporated by reference |
ML20210J920 | 1 February 1999 | CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 | Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Fire Barrier Enforcement Discretion Temporary Modification Missed surveillance Fire Protection Program |
ML20202D010 | 27 January 1999 | Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 | VT-2 Liquid penetrant |
ML20199E996 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 | |
ML20207D609 | 31 December 1998 | 1998 Annual Operating Rept for Cpses,Units 1 & 2. with | Deep Dose Equivalent Coast down |
ML20197K237 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 | |
ML20195F316 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 | |
ML20154B574 | 30 September 1998 | Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program | Stroke time |
ML20154M884 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 | |
ML20151W036 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with | |
ML20151Q121 | 14 August 1998 | Rev 0 to Control of Hazard Barriers | |
ML20237C406 | 14 August 1998 | Safety Evaluation Supporting Request to Implement Risk Informed IST Program | Safe Shutdown Boric Acid High winds Stroke time Internal Flooding Probabilistic Risk Assessment Incorporated by reference Large early release frequency Earthquake |
ML20237C672 | 31 July 1998 | Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 | Downpower |
ML20236V312 | 29 July 1998 | Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem | |
ML20236R071 | 30 June 1998 | Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 | |
ML20249B258 | 31 May 1998 | Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 | |
ML20248A167 | 22 May 1998 | Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 | |
ML20247G324 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 | |
ML20216B866 | 1 April 1998 | Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr | |
ML20216J306 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 | Coast down |
ML20216J186 | 28 February 1998 | Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station | |
ML20197A695 | 24 February 1998 | Inservice Insp Summary Rept,First Interval,Second Period, First Outage | |
ML20199J539 | 2 February 1998 | CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 | Temporary Modification |