Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000382/199902021 October 1999Insp Rept 50-382/99-20 on 990815-0925.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ActivitiesFinite Element Analysis
Missed surveillance
IR 05000382/199901419 October 1999Insp Rept 50-382/99-14 on 990913-17 & 1004-08.No Violations Noted.Major Areas Inspected:Operator Requalification Training ProgramJob Performance Measure
PNO-IV-99-038A, on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily1 October 1999PNO-IV-99-038A:on 990929,restart of Waterford 3 Occurred. Cause Identified as Failed Seal Water Heat Exchanger Baffle. New Battle & Seal Assembled Were Installed & Reactor Coolant Pump 2B Was Returned to Svc Satisfactorily
IR 05000382/199901829 September 1999Insp Rept 50-382/99-18 on 990830-0902.Violations Noted.Major Areas Inspected:Implementation of NRC-approved Fire Protection ProgramSafe Shutdown
Emergency Lighting
Fire Protection Program
IR 05000382/199901927 September 1999Insp Rept 50-382/99-19 on 990830-0903.No Violations Noted. Major Areas Inspected:Plant SupportOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
PNO-IV-99-038, on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 99081015 September 1999PNO-IV-99-038:on 990910,operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.New Baffle & Seal Assembly Were Installed & Plant Was Returned to Power Operations on 990810
IR 05000382/199901514 September 1999Insp Rept 50-382/99-15 on 990719-23 with in Ofc Insp Until 0819.No Violations Noted.Major Areas Inspected:Assessment of 10CFR50.59 Safety Evaluation Program & Review of Previous Insp Findings Involving Tornado Missile ProtectionTornado Missile
Emergency Lighting
Tornado Missile Protection
IR 05000382/19990078 September 1999Insp Rept 50-382/99-07 on 990601-11.Noncited Violations Identified.Major Areas Inspected:OperationsTime of Discovery
Packing leak
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Maintenance Rule Program
IR 05000382/19990161 September 1999Insp Rept 50-382/99-16 on 990704-0814.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant SupportUltimate heat sink
Emergency Lighting
Finite Element Analysis
Operability Determination
Operability Assessment
PNO-IV-99-032A, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed12 August 1999PNO-IV-99-032A:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plant Sd.New Baffle & Seal Assembly Was Installed
IR 05000382/199901011 August 1999Insp Rept 50-382/99-10 on 990719-23.Violations Noted.Major Areas Inspected:Solid Radioactive Waste Mgt & Radioactive Matl Transportation ProgramsHigh Radiation Area
Process Control Program
PNO-IV-99-032, on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor3 August 1999PNO-IV-99-032:on 990801,Waterford 3 Operators Manually Tripped Reactor from 100% Power in Response to Indications of Failure of RCP 2B Seal.Pump Was Secured Immediately Following Plan Shutdown.Resident Inspectors Will Monitor
IR 05000382/199901315 July 1999Insp Rept 50-382/99-13 on 990523-0703.Noncited Violations Noted.Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support ActivitiesShutdown Margin
Packing leak
Past operability
Grace period
IR 05000382/199901221 June 1999Insp Rept 50-382/99-12 on 990524-27.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness ProgramSiren
IR 05000382/199901118 June 1999Insp Rept 50-382/99-11 on 990524-28.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program,Status of Effluent Radiation Monitors & Counting Room InstrumentsBoric Acid
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
ML20196C94615 June 1999Notice of Violation from Insp Completed on 990422.Violation Noted:Licensee Failed to Consider Info Contained During Background Investigation Before Granting Temporary Unescorted Access to Contractor Employee
IR 05000382/19990093 June 1999Insp Rept 50-382/99-09 on 990411-0522.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant SupportStroke time
Missed surveillance
Scaffolding
Downpower
ML20209B85825 May 1999EN-98-046A:on 990524,staff Withdrew Proposed Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Severity Level III Problems Associated with ECCS & Afws
IR 05000382/199900618 May 1999Insp Rept 50-382/99-06 on 990405-09.Non-cited Violations Identified.Major Areas Inspected:Issue Previously Identified During Architect Engineering Insp Which Documented NRC Insp Rept 50-382/98-201Ultimate heat sink
Stroke time
Past operability
Battery sizing
IR 05000382/199900510 May 1999Insp Rept 50-382/99-05 on 990228-0410.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant SupportShutdown Margin
Packing leak
Stroke time
Power-Operated Valves
ML20206F4803 May 1999Insp Rept 50-382/99-08 on 990405-07.One Apparent Violation Noted & Being Considered for Escalated Eas.Major Areas Inspected:Plant Support Including Licensee Access Authorization Program
IR 05000382/19990049 April 1999Insp Rept 50-382/99-04 on 990301-19.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Review of Licensee Implementation of Facility ISI Program & Followup Review of Reactor Trip Breaker PerformanceBoric Acid
Nondestructive Examination
Liquid penetrant
Pressure Boundary Leakage
IR 05000382/19990025 April 1999Insp Rept 50-382/99-02 on 990117-0227.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ActivitiesSafe Shutdown
Ultimate heat sink
Fire Barrier
Past operability
Tornado-Generated Missile
Tornado Missile Protection
Foreign Material Exclusion
Operability Determination
Scaffolding
IR 05000382/199900326 March 1999Insp Rept 50-382/99-03 on 990308-12.Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on RF09 Refueling Outage ActivitiesHigh Radiation Area
Locked High Radiation Area
Foreign Material Exclusion
Scaffolding
ML20207F1583 March 1999Notice of Violation from Insp on 990125-29 & 0208-12. Violation Noted:Inspector Determined That Waterford Audits SA-98-025.1 & SA-98-036.1,dtd 980916,were Conducted by Individuals Not Independent of Program Mgt Being Audited
IR 05000382/19990013 March 1999Partially Deleted Insp Rept 50-382/99-01 on 990125-29 & 0208-12 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Plant Support
IR 05000382/199801821 December 1998Insp Rept 50-382/98-18 on 981018-1128.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant SupportBoric Acid
Ultimate heat sink
Downpower
Unidentified leakage
Unidentified leak
IR 05000382/199801524 November 1998Insp Rept 50-382/98-15 on 980906-1017.No Violations Noted. Major Areas Inspected:Aspects of Operations,Maint, Engineering & Plant Support ActivitiesStroke time
Power change
PNO-IV-98-054, on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area19 November 1998PNO-IV-98-054:on 981117,plant Shutdown Greater than 72 H Due to Unidentified Leak.Investigations by Licensee Verified That Leakage Occurred from RCP 2b Seal Area
IR 05000382/199801317 November 1998Insp Rept 50-382/98-13 on 980831-0901 & 981005-08.No Violations Noted.Major Areas Inspected:Maint Using Guidance of Temp Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit BreakersEarthquake
Maintenance Rule Program
ML20155D04129 October 1998Notice of Violation from Insp on 981005-08.Violation Noted: Inspectors Identified That Radiation Surveys to Evaluate Extent of Radiation Levels Had Not Been Performed Prior to Operations Personnel Entering Area
ML20155D05629 October 1998Insp Rept 50-382/98-17 on 981005-08.Violations Noted. Major Areas Inspected:Routine Review of Radiation Protection Program ActivitiesHigh Radiation Area
Scaffolding
ML20155D51127 October 1998Partially Withheld Insp Rept 50-382/98-16 on 980914-18. Violations Noted.Major Areas Inspected:Licensee Physical Security Program.Portions Withheld (Ref 10CFR2.790)
ML20155D50227 October 1998Notice of Violation from Insp on 980914-18.Violation Noted: Performance Tests of Protected Area Detection Sys Identified That Two Detection Zones Did Not Meet Design Criteria to Detect Test Individuals
ML20154L0839 October 1998Notice of Violation from Insp on 980726-0905.Violation Noted:On 980721,NRC Inspectors Found Door 206,vital Area Portal,Unlocked & Not in Alarm at Central Alarm Station
ML20154L1289 October 1998Insp Rept 50-382/98-14 on 980726-0905.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant SupportPast operability
Fire Watch
PNO-IV-98-045, on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of Site28 September 1998PNO-IV-98-045:on 980926,Unit 3 Declared Unusual Event of Hurricane Warning in St Charles Parish.River Bend Station Continued to Operate at Full Power Since Hurricane Force Winds Were Not Predicted in Vicinity of SiteHigh winds
PNO-IV-98-040, on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 98092318 September 1998PNO-IV-98-040:on 980917,licensee Commenced Shutdown of Reactor in Order to Replace Pressurizer Code Safety Valve That Had Been Experiencing Increased Leakage.Licensee Plans to Restart Facility on 980923
IR 05000382/199801221 August 1998Insp Rept 50-382/98-12 on 980614-0725.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant SupportForeign Material Exclusion
IR 05000382/199920127 July 1998Insp Rept 50-382/99-201 on 990511-0619.No Violations Noted Major Areas Inspected:EngineeringUnanalyzed Condition
Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Past operability
Probabilistic Risk Assessment
Condition Adverse to Quality
Battery sizing
Earthquake
Operability Assessment
IR 05000382/199801020 July 1998Insp Rept 50-382/98-10 on 980622-26.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Access Authorization,Alarm Stations,Protected Area Access Control of Personnel & Packages & VehiclesFitness for Duty
ML20236P24310 July 1998Notice of Violation from Insp on 980503-0613.Violation Noted:On 980521,AP UNT-005-013 Was Not Implemented in That Impairment to Fire Door D150 Was Not ControlledFire Protection Program
IR 05000382/199800910 July 1998Insp Rept 50-382/98-09 on 980503-0613.Violations Noted.Major Areas Inspected:Aspects of Operations,Maint,Engineering & Plant Support Activities.Fire Door in Reactor Auxiliary Bldg Was Observed to Be Open W/No Controls in PlaceFire impairment
Locked High Radiation Area
Tornado-Generated Missile
Fire Protection Program
Fire Watch
Power change
ML20249A96116 June 1998Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Violation Noted:Licensee Identified That Calculated Peak Fuel Cladding Temp Would Have Exceeded 2200 F Using Licensing Basis Analysis & HPSI FlowCondition Adverse to Quality
Fuel cladding
ML20151R9139 June 1998EN-98-046:on 980616,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based on Level III Problem Involving HPSI Flow Issues at Waterford-3 FacilityEnforcement Discretion
IR 05000382/199800829 May 1998Insp Rept 50-382/98-08 on 980322-0502.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant SupportZebra Mussel
Missed surveillance
Scaffolding
Operability Assessment
ML20248F68029 May 1998Notice of Violation from Insp on 980322-0502.Violation Noted:Licensee Failed to Establish Adequate Procedures for Operation of EDG When in No or Low Electrical Loading Condition in That No Specific Guidance Provided
IR 05000382/199809924 April 1998SALP Rept 50-382/98-99 for 961201-980321Coatings
Systematic Assessment of Licensee Performance
Maintenance Rule Program
ML20217B67321 April 1998Notice of Violation from Insp on 980201-0321.Violation Noted:On Past Occasions,Engineer Operated Governor Valve on Emergency Feedwater Turbine W/O Direction or Concurrence of Shift Superintendent or Control Room Supervisor
ML20217B69821 April 1998Insp Rept 50-382/98-06 on 980201-0321.Violations Noted.Major Areas Inspected:Operations,Maint & EngineeringExemption Request