Issue date | Title | Topic | |
---|---|---|---|
ML18107A529 | 10 September 1999 | Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 | Unanalyzed Condition Fitness for Duty High winds Fatality |
ML20211Q877 | 27 August 1999 | Rev 0 to Inservice Testing Manual for Pumps & Valves Program | Stroke time Incorporated by reference Excess Flow Check Valve Cold shutdown justification Power Operated Valves |
ML20211H431 | 27 August 1999 | Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints | |
ML18107A517 | 25 August 1999 | Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 | Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Hydrostatic Process Control Program Power change |
ML18107A512 | 23 August 1999 | Procedure 71151, Performance Indicator Verification. | Significance Determination Process |
ML18107A509 | 23 August 1999 | Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. | Significance Determination Process |
ML18107A496 | 23 August 1999 | Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. | |
ML20211D920 | 20 August 1999 | Revised Pages to Third Ten Year ISI Program & Relief Requests | |
ML20210L163 | 4 August 1999 | Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation | Boric Acid Shutdown Margin |
ML18107A467 | 29 July 1999 | Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements | |
ML18107A460 | 23 July 1999 | Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown | |
ML18107A424 | 2 July 1999 | Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR | Turbine Missile Overspeed |
ML20212J304 | 22 June 1999 | Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS | |
ML18107A381 | 10 June 1999 | Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means | |
ML18107A360 | 4 June 1999 | Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC | |
ML20195B569 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | Boric Acid Stroke time Cold shutdown justification Power Operated Valves Scaffolding Manual Operator Action |
ML20195B588 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 | Boric Acid Stroke time Cold shutdown justification Scaffolding Manual Operator Action |
ML18107A296 | 12 May 1999 | Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 | Unanalyzed Condition Fitness for Duty High winds Fatality |
ML20206N369 | 6 May 1999 | Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic | Shutdown Margin Earthquake Control Room Habitability |
ML20206H030 | 3 May 1999 | Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing | |
ML20206G881 | 3 May 1999 | Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS | Ultimate heat sink Control Room Habitability |
ML20206G836 | 3 May 1999 | Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event | Grab sample Stress corrosion cracking Pressure Boundary Leakage Pressure boundary leak Unidentified leakage Operational leakage |
ML20205P234 | 1 May 1999 | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Through-Wall Leakage Dissimilar Metal Weld Scaffolding Unidentified leakage Unidentified leak Eddy Current Test |
ML20205P251 | 1 May 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports | VT-2 Dissimilar Metal Weld |
ML18107A213 | 14 April 1999 | Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 | |
ML18106B159 | 31 March 1999 | Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 | Overspeed |
ML18106B080 | 22 February 1999 | Proposed Tech Specs Re CR Emergency Air Conditioning Sys | |
ML18106B061 | 8 February 1999 | Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. | Safe Shutdown Offsite Circuit |
ML18106B064 | 8 February 1999 | Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing | |
ML20203C825 | 5 February 1999 | Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability | Pressure Boundary Leakage |
ML20205P265 | 4 February 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests | B.5.b |
ML18106B053 | 2 February 1999 | Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel | |
ML18106B043 | 19 January 1999 | Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys | Boric Acid Shutdown Margin |
ML18106B024 | 15 January 1999 | Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 | |
ML20198J097 | 22 December 1998 | Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 | |
ML20196K197 | 22 December 1998 | Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 | |
ML20206N885 | 14 December 1998 | Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval | Boric Acid Hydrostatic VT-2 |
ML20206N871 | 30 November 1998 | Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports | Boric Acid VT-2 Scaffolding |
ML20195J443 | 18 November 1998 | Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir | |
ML20195C946 | 10 November 1998 | Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters | |
ML20154P283 | 16 October 1998 | Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 | Overspeed |
ML18106A918 | 12 October 1998 | Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 | |
ML18106A923 | 12 October 1998 | Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 | High Radiation Area |
ML18106A894 | 29 September 1998 | Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch | |
ML20153H534 | 24 September 1998 | Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification | |
ML18106A878 | 17 September 1998 | Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity | Safe Shutdown |
ML18106A837 | 12 August 1998 | Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door | High Radiation Area |
ML18106A793 | 30 July 1998 | Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase | |
ML20236U865 | 28 July 1998 | Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP | Shutdown Margin |
ML20236U841 | 28 July 1998 | Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps |