Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18107A52910 September 1999Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9Unanalyzed Condition
Fitness for Duty
High winds
Fatality
ML20211Q87727 August 1999Rev 0 to Inservice Testing Manual for Pumps & Valves ProgramStroke time
Incorporated by reference
Excess Flow Check Valve
Cold shutdown justification
Power Operated Valves
ML20211H43127 August 1999Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints
ML18107A51725 August 1999Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Hydrostatic
Process Control Program
Power change
ML18107A51223 August 1999Procedure 71151, Performance Indicator Verification.Significance Determination Process
ML18107A50923 August 1999Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability.Significance Determination Process
ML18107A49623 August 1999Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys.
ML20211D92020 August 1999Revised Pages to Third Ten Year ISI Program & Relief Requests
ML20210L1634 August 1999Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill OperationBoric Acid
Shutdown Margin
ML18107A46729 July 1999Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements
ML18107A46023 July 1999Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown
ML18107A4242 July 1999Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSARTurbine Missile
Overspeed
ML20212J30422 June 1999Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS
ML18107A38110 June 1999Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means
ML18107A3604 June 1999Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC
ML20195B56914 May 1999Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
Scaffolding
Manual Operator Action
ML20195B58814 May 1999Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214Boric Acid
Stroke time
Cold shutdown justification
Scaffolding
Manual Operator Action
ML18107A29612 May 1999Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9Unanalyzed Condition
Fitness for Duty
High winds
Fatality
ML20206N3696 May 1999Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation LogicShutdown Margin
Earthquake
Control Room Habitability
ML20206H0303 May 1999Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing
ML20206G8813 May 1999Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVSUltimate heat sink
Control Room Habitability
ML20206G8363 May 1999Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture EventGrab sample
Stress corrosion cracking
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage
Operational leakage
ML20205P2341 May 1999Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430Boric Acid
Time of Discovery
High Radiation Area
Hydrostatic
Nondestructive Examination
VT-2
Through-Wall Leak
Through-Wall Leakage
Dissimilar Metal Weld
Scaffolding
Unidentified leakage
Unidentified leak
Eddy Current Test
ML20205P2511 May 1999Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component SupportsVT-2
Dissimilar Metal Weld
ML18107A21314 April 1999Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431
ML18106B15931 March 1999Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918Overspeed
ML18106B08022 February 1999Proposed Tech Specs Re CR Emergency Air Conditioning Sys
ML18106B0618 February 1999Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions.Safe Shutdown
Offsite Circuit
ML18106B0648 February 1999Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing
ML20203C8255 February 1999Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV OperabilityPressure Boundary Leakage
ML20205P2654 February 1999Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure TestsB.5.b
ML18106B0532 February 1999Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel
ML18106B04319 January 1999Proposed Tech Specs Bases Section 3/4.1.2 Re Boration SysBoric Acid
Shutdown Margin
ML18106B02415 January 1999Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1
ML20198J09722 December 1998Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197
ML20196K19722 December 1998Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998
ML20206N88514 December 1998Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp IntervalBoric Acid
Hydrostatic
VT-2
ML20206N87130 November 1998Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component SupportsBoric Acid
VT-2
Scaffolding
ML20195J44318 November 1998Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir
ML20195C94610 November 1998Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters
ML20154P28316 October 1998Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7Overspeed
ML18106A91812 October 1998Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10
ML18106A92312 October 1998Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03High Radiation Area
ML18106A89429 September 1998Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch
ML20153H53424 September 1998Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification
ML18106A87817 September 1998Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment IntegritySafe Shutdown
ML18106A83712 August 1998Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock DoorHigh Radiation Area
ML18106A79330 July 1998Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase
ML20236U86528 July 1998Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRPShutdown Margin
ML20236U84128 July 1998Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps