Revised Pages to Third Ten Year ISI Program & Relief Requests
ML20211D920
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/20/1999
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20211D908 List:
References
PROC-990820, NUDOCS 9908270163
Download: ML20211D920 (4)


Text

p. .

l l

l gNIA POWER flWWERVICE INSPECTION MANUAL NPC SUBMTITAL OF THE INSERVICE INSPECTION SECTION: 7.15 i AND TESTING PROGRAMS REV: 11 DATE: 01/07/97 STATION: North Anna UNIT NO.: 1 INTERVAL NO.: 3 SUBMITTAL TITLE:

CHANGE NO.: 1 SECTION NO.: REVISION: 0 (lF APPLICABLE)

=======___ --===-----==_____m=--------_---================== _

DESCRIPTION OF CHANGES:

Added Section 6 to Table of Contents. Added a paragraph to the abstract that says the ISI Plan and the System Pressure Test Plan are provided in separate volumes to the ISI Program, and the l IWE/IWL Program and the IST Program are separate programs that are l not included in the ISI Program. Added the serial number for the Virginia Power letter that submitted the third interval ISI Program l to the Relief Request Status list.

(ATTACH PAGE (S) SHOWING EXACT WORDING OF PROPOSED CHANGE)

REASON FOR CHANGE:

These changes resolve comments from the ANII.

ORIGINATED BY: John Kin DATE: 5/5/99 DEPARTMENT: Materials /ISI Engineering

==== _ - - = = - - - - - - - - = - _ - - - = = = - - - - - - = = - - - _ _ - -

SUPERVISOR - MATERIALS /ISI ENGINEERING (CORPORATE)

REVIEWED AND p APPROVED: bb 4 n 6.Q.Thtdtk wor b

--_--------__---_-_-__--__-J----_-_----------------___-

DATE: f/(,/49

-_L----_.

SUPERVISOR - TESTING and INSPECTION (STATION)

O  :

DATE: 6!24 99 ANII (STATION)

REVIEWED: dd /)9. x-


____--------______--------__---______-----_-----__~_----_____

DATE: 4/j///

STATION NUCLEAR SAFETY AND OPERATING COMMITTEE (SNSOC)

REVIEWED AND APPROVED:

_ _ _ _ _ _ _ - _ c. _ =- s._____

DATE:

=====__-______-____===_== _ _____

((5[D l

AFTER APPROVAL, RETURN 0: Joyce A. Lawler, IN-3NW Virginia Power, 5000 ominion Elvd., Glen Allen, VA 23060 DISTRIBUTION NO.: DISTRIBUTION DATE:

SECT 7-15.WP5 9908270163 990820 PDR ADOCK 05000338 G PDR

P,- .

TABLE OF CONTENTS SECTION TITLE PAGE Revision i Assignment 0 11- Distribution Record 0 lii ' Table of. Contents 0 l

iv Abstract 0 v List of Drawings 0 viii Relief Request Status 0 1 Inservice Inspection Program - 0 General 2 Inservice Inspection Program - O for Components 3- Inservice Inspection Program - O for Component Supports 4 Miscellaneous Interim Relief 0-Requests and Documentation 5 Partial Coverage Relief Requests 0

,A 6- Code Case Utilized in the Third 0 $

Inservice Inspection Interval Q l

N1-000 5/99 Rev. O iii

ABSTRACT

. , VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 INSERVICE INSPECTION PROGRAM THIRD INSPECTION INTERVAL May 1, 1999 TO April 30, 2009 In accordance with 10 CFR 50.55a, the North Anna Unit 1 (NAPS-1)

Inservice Inspection (ISI) Program was updated to meet the requirements of ASME Section XI, 1989 Edition. Steam generator inspections will continue to be performed under Plant Technical Specifications. This updated program is for the NAPS-1 third ten year inspection interval scheduled to commence May 1, 1999 and be completed April 30, 2009. These dates reflect extension of the first interval by 201 days documented in our letter to the NRC dated 8/25/88, Serial No.88-486, and extension of the second interval by 127 days approved per NRC Letter No.98-167, dated 3/6/98. In cases where the requirements of Section XI have been determined to be impractical, requests for relief have been developed per 10 CFR 50.55a (g) (5) .

This document provides an overview and summary of the NAPS-1 ISI Program for Subsections IWA, IWB, IWC, IWD, and, IWF. The boundaries of the ISI Program, component classifications, and the employment of exemptions in IWB-1220, IWC-1220, IWD-1220, and IWF-1230 are shown on the ISI Classification Boundary Drawings (CBDs). The codings, symbols and text used on the CBDs are detailed on 11715-CBM-L&S-3, Legends and Symbols Drawing.

Section 1 of this document, provides the general information and format regarding this program. Applicable Code Cases and drawings are also listed. Section 2 of this document provides an ISI Program implementation overview for ISI Class 1, 2, and 3 components. Relief requests for components are also provided.

Section 3 of this document provides a program implementation overview for ISI Class 1, 2, and 3 component supports. Relief requests for component supports are provided.

The Inservice Inspection Program Plan for Components and ,

Component Supports, and the Inservice Inspection Plan for System  !

Pressure Tests are provided in separate volumes to the ISI q j Program. The IWE (Inservice Inspection of Class MC and CC , ,

Components) and IWL (Inservice Testing of Class CC Concrete 2 Components) Program, and the IWP (Inservice Testing of Pumps) and O IWV (Inservice Testing of Valves) Program are separate programs and are not included as part of the ISI Program. j N1-000 5/99 Rev. O  !

iv l

)

f ... . - 1

. 1 RELIEF REQUEST STATUS Relief No. Status VP Ltr No. NRC Ltr. No NDE-1 Pending 99-169 NDE-2 Pending 99-169 NDE-3 Pending 99-169 NDE-4 Pending 99-169 NDE-5 Pending 99-169 NDE-6 Pending 99-169 NDE-7 Pending 99-169 NDE-8 Pending 99-169 NDE-9 Pending 99-169 NDE-10 Pending 99-169 NDE-11 Pending 99-169 NDE-12 Pending 99-169 NDE-13 Pending 99-169 NDE-14 Pending 99-169 SPT-1 Pending 99-169 SPT-2 Pending 99-169 H SPT-3 Pending 99-169 j SPT-4 Pending 99-169 y SPT-5 Pending 99-169 SPT-6 Pending 99-169 SPT-7 Pending 99-169 S P l'- 8 Pending 99-169 i

CS-1 Pending 99-169 1 N1-000 5/99 Rev. O viii