PNO-II-99-037D, on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 Mph15 September 1999PNO-II-99-037D:on 990915,Hurricane Floyd Was Located Approx 380 Miles Southeast of Wilmington,Nc.Ctr of Hurricane Was Estimated Near Latitude 28.8 North & Longitude 78.8 West. Storm Was Moving Northwest at 14 Mph.Max Winds Were 140 MphSiren
PNO-II-99-023, on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems8 June 1999PNO-II-99-023:on 990601,one CEA Descended Into Reactor Core for Unknown Reasons,With Unit 2 Rated Power.Licensee Noted Voltage Fluctuations on CEA Power Supplies.Licensee Is Continuing to Investigate CEA Problems
PNO-II-93-001, on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified13 January 1993PNO-II-93-001:on 930112,plant Commenced Shutdown Due to RCP Vibration.Unit 2 Being Placed in Cold Shutdown,Mode 5.State of Fl Notified
PNO-II-90-048, on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 90091522 August 1990PNO-II-90-048:on 900820,shutdown of Unit 2 in Excess of 48 H.Caused by High Vibration of Main Generator Exciter Bearing.Licensee Expanding Scope of Insp & Root Cause Analysis.Unit Scheduled to Begin Refueling Outage on 900915
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-II-87-066, on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp6 October 1987PNO-II-87-066:on 871008,licensee Calculated Leakage Above Required Tech Spec Limits.Cause Could Not Be Identified. Reactor Shut Down Based on Leakage & Results of Containment Insp
PNO-II-87-019, Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding Areas18 March 1987PNO-II-87-019:Region II Will Dispatch Augmented Insp Team on 870319 to Review Circumstances Associated W/Problem Re Possible Corrosion Caused by Deposits of Crystalline Boric Acid on Reactor Head & Surrounding AreasBoric Acid
PNO-II-86-066, on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 86092122 September 1986PNO-II-86-066:on 860920,leaking Relief Valve on Storage Tube on Hydrogen Trailer Discovered.Other Tubes Isolated from Leak,Area Roped Off & Smoking Prohibited.Event Terminated on 860921
PNO-II-86-040, on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 19859 June 1986PNO-II-86-040:on 860606,util Took Facility Out of Svc to Begin Plugging 17 Degraded Steam Generator Tubes.Unit Will Be Shut Down Approx 2 Wks.Tube Degradation Discovered on 860523 in Eddy Current Data Taken During Oct-Dec 1985
PNO-II-86-032, on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job28 April 1986PNO-II-86-032:on 860428,iron Workers Employed by Util Contractor Walked Off Job & Set Up Picket Lines at All Four Entrances to Facility.Union Workers Refusing to Cross Picket Lines.Security Forces & Senior Reactor Operators on Job
PNO-II-86-004, on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm9 January 1986PNO-II-86-004:on 851203,util Discovered That Individual Cleaning Sludge Out of Steam Generator Received Higher than Expected Exposure in Late Nov/Early Dec.Caused by Lack of whole-body TLD Other than TLD on Upper Arm
PNO-II-85-110A, on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path22 November 1985PNO-II-85-110A:on 851122,Hurricane Kate Downgraded to Tropical Storm.No Adverse Effects Occurred to Licensed Facilities in Storm Path
PNO-II-85-110, on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 85111819 November 1985PNO-II-85-110:on 851119,Hurricane Kate Centered Slightly Inland Over North Central Cuba,About 150 Miles South of Key West,Fl.Diesel Generators at All Three Sites Operable.Turkey Point Declared Unusual Event on 851118
PNO-II-85-105A, on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated12 November 1985PNO-II-85-105A:on 851109,minor Damage to Regular Lifting Rig Identified Following Lifting of Core Internals Upper Guide Structure Free of Reactor Vessel.Unusual Event Declared on 851106 Terminated
PNO-II-85-105, on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted6 November 1985PNO-II-85-105:on 851106,while Removing Core Internals Upper Guide Structure,One Lifting Rig Attachment Failed.Refueling Operations Halted W/Structure in Apparently Stable Position. NSSS Vendor Being Contacted
PNO-II-85-088, on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs11 September 1985PNO-II-85-088:on 850910,reactor Manually Tripped from 100% Power.Caused by Excessive Vibration in Reactor Coolant Pump & Loose Parts Monitor Alarm in Same Cooling Loop.Unit in Cold Shutdown for Investigation of Problem & Repairs
PNO-II-85-085, on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance26 August 1985PNO-II-85-085:on 850824,leaking Oil from Reactor Coolant Pump Lower Motor Reservoir Contacted Pump Casing & Caught Fire.Caused by Failure of Lower Bearing & Oil Seal.Pump & Motor Vendors Contacted for Technical Assistance
PNO-II-85-076, on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected8 August 1985PNO-II-85-076:on 850808,reactor Tripped from 99% Power. Caused by Two Blown Fuses.Unit Proceeding to Cold Shutdown & Will Be Out of Svc for 10 Days While Cause Investigated & Reactor Coolant Pumps Inspected
PNO-II-85-070B, monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm26 July 1985PNO-II-85-070B:monitoring of Tropical Storm Bob Terminated.Natl Weather Svc No Longer Issuing Special Repts on Storm
PNO-II-85-070A, on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If Needed24 July 1985PNO-II-85-070A:on 850724,tropical Storm Bob Near Latitude 29.5 North & Longitude 80.3 West,About 40 Miles east-southeast of Daytona Beach,Fl.Storm Will Continue in Direction for Next 24 H.Precautions Will Be Taken If NeededHigh winds
PNO-II-85-070, utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm23 July 1985PNO-II-85-070:utils Contacted to Confirm That Progress of Tropical Storm Bob Being Followed as Result of Natl Weather Svc Upgrading from Tropical Depression to Tropical Storm
PNO-II-84-069A, update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West11 October 1984PNO-II-84-069A:update to PNO-II-84-069,issued on 841010. Region II Continues to Monitor Hurricane Josephine,Centered Near Latitude 29.4 North & Longitude 72.5 West
PNO-II-83-058, on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 83080810 August 1983PNO-II-83-058:on 830809,St Lucie Unit 2 Completed 100-hour Test Run at Full Power.Test Was Culmination of Power Ascension Testing Which Began After Full Power License Was Issued on 830610.Placed Into Commercial Operation on 830808
PNO-II-80-031, on 800219,18 Gallons of Extraneous Liquid & Resin Found in Radwaste Shipment.Source of Liquid & Resin at Bottom of Shipping Cask Not Confirmed.Shipment Loaded in Rain & Overfilled26 February 1980PNO-II-80-031:on 800219,18 Gallons of Extraneous Liquid & Resin Found in Radwaste Shipment.Source of Liquid & Resin at Bottom of Shipping Cask Not Confirmed.Shipment Loaded in Rain & Overfilled
ML20216K1326 November 1978PNO-78-189:on 781103,while Reactor Was in Cold Shutdown condition,1100 Gallons of Reactor Coolant Water Was Sprayed Into Containment Through Css.Reactor Shutdown Since 781127 for SG Insp & Maint Activities
ML20249A6547 July 1978PNS-78-031:on 780707,bomb Threat Was Received at Plant,Unit 1 Guard House.Plant Site Was Not Evacuated.Fbi & Sheriffs Were Notified by Licensee
ML20207G4319 November 1977PNO-77-199:on 771109,hospitalized Employee Incorrectly Diagnosed as Being Contaminated with Radioactivity.State of Fl Notified
ML20151U4521 June 1977PNO-77-094:on 770531,with Reactor Operating at 100% Power, Failure Occurred in Turbine Generator Exciter & Reactor Tripped as Result of Momentary Loss of Voltage
ML20151U67716 May 1977PNO-77-085:on 770516,TPS Unit 3 Reactor Tripped When RPS Received Signal That 3C Pump Had Tripped.Low Grid Voltage Caused Fossil Units to Trip.Slp Unit 1 Also Affected by Voltage Loss.Power Restored to Sys Grid from Fossil Units
ML20151U48418 April 1977PNO-77-057:on 770415,inside Containment Instrument Air Supply Was Lost,With Reactor Operating at 100% Power.Reactor Expected to Be Shutdown Approx 10 Days to Insp & Replace RCP Seals
ML20151U6657 April 1977PNO-77-052:on 770406,while Draining Water from Rcs,Refueling Storage Tank Overflowed.Contaminated Water Ran Into Storn Sewer Which Empties Into Waste Perculation Basin on Site.Fpl Currently Investigating Means of Discharging Contents
ML20249B52616 July 1976PNO-76-122:on 760710,power Ascension Testing at 50% Power Level Was Interrupted to Investigate Radial Flux of About 4%.Initial Criticality Was Achieved on 760422.Licensee Plans to Issue Press Release on 760716
ML20249B31722 April 1976PNO-76-077:on 760422,initial Criticality Was Achieved in Plant Reactor.Control Element Configuration & Reactor Coolant Boron Concentration Were in Close Agreement W/Predicted Values
ML20236F40722 April 1976PNS-76-013:on 760422 FPL Commercial Manager in Staurt,Fl, Notified by Newspaper Friend That Local Citizen & Member of Martin County Conservation Alliance Group,Informed That Group Would Attempt to Penetrate Security of St Lucie 1