PNO-III-98-035A, on 980624,reactor Tripped Automatically During Recovery Activities from Tornado Which Damaged Electrical Switchyard & Cut Off Offsite Power Supply26 June 1998PNO-III-98-035A:on 980624,reactor Tripped Automatically During Recovery Activities from Tornado Which Damaged Electrical Switchyard & Cut Off Offsite Power Supply
PNO-III-98-035, on 980624,plant Automatically Shut Down After Tornado Damaged Electrical Switchyard & Cut Off Offsite Power Supply.Licensee Declared Alert Under Emergency Plan. Licensee Assessing Extent of Damage25 June 1998PNO-III-98-035:on 980624,plant Automatically Shut Down After Tornado Damaged Electrical Switchyard & Cut Off Offsite Power Supply.Licensee Declared Alert Under Emergency Plan. Licensee Assessing Extent of Damage
PNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill23 January 1998PNO-III-98-009:on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill
PNO-III-93-066, on 931202,licensee Commenced Shutdown to Replace Seal on RRP a Due to Indications of Increasing Degradation.License Estimates Outage Will Last Seven Days. Region III Will Monitor Plant Shutdown & Outage Activities2 December 1993PNO-III-93-066:on 931202,licensee Commenced Shutdown to Replace Seal on RRP a Due to Indications of Increasing Degradation.License Estimates Outage Will Last Seven Days. Region III Will Monitor Plant Shutdown & Outage Activities
PNO-III-93-018, on 930326,licensee Reported That Licensed Senior Reactor Operator Tested Positive for Alcohol During Routine Medical Exam.Individual Not Performing NRC-licensed Duties at Time of Incident,At Site Only for Medical Exam26 March 1993PNO-III-93-018:on 930326,licensee Reported That Licensed Senior Reactor Operator Tested Positive for Alcohol During Routine Medical Exam.Individual Not Performing NRC-licensed Duties at Time of Incident,At Site Only for Medical Exam
PNO-III-93-002B, on 930109,plant Shutdown for Leak Testing Other Maint Activities,Including Testing of Msiv.One Fuel Assembly Identified as Containing One Leaking Rod & Nine Fuel Assemblies Identified as Having Potential Leaks1 February 1993PNO-III-93-002B:on 930109,plant Shutdown for Leak Testing Other Maint Activities,Including Testing of Msiv.One Fuel Assembly Identified as Containing One Leaking Rod & Nine Fuel Assemblies Identified as Having Potential Leaks
PNO-III-93-002A, on 930109,plant Shut Down to Replace Leaking Fuel Bundle & Other Maint Acitivities,Including Testing of Main Steam Isolation Valves.Four Fuel Assemblies Have Been Confirmed as Containing One or More Leaking Rods21 January 1993PNO-III-93-002A:on 930109,plant Shut Down to Replace Leaking Fuel Bundle & Other Maint Acitivities,Including Testing of Main Steam Isolation Valves.Four Fuel Assemblies Have Been Confirmed as Containing One or More Leaking Rods
PNO-III-93-002, on 930109,unit Was Shut Down to Identify & Replace Leaking Fuel Bundle & to Perform Other Maint Activities.All Fuel Bundles Will Be Tested for Leakage & Any Leaking Bundles Will Be Replaced11 January 1993PNO-III-93-002:on 930109,unit Was Shut Down to Identify & Replace Leaking Fuel Bundle & to Perform Other Maint Activities.All Fuel Bundles Will Be Tested for Leakage & Any Leaking Bundles Will Be Replaced
PNO-III-92-058, on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown26 October 1992PNO-III-92-058:on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown
PNO-III-91-054, on 911222,36-inch Fiberglass Pipe Carrying Circulating Cooling Water from Cooling Towers to Plant Broke Outside Turbine Bldg.Leak Subsequently Stopped When Operators Closed Valve in Broken Line23 December 1991PNO-III-91-054:on 911222,36-inch Fiberglass Pipe Carrying Circulating Cooling Water from Cooling Towers to Plant Broke Outside Turbine Bldg.Leak Subsequently Stopped When Operators Closed Valve in Broken Line
PNO-II-89-066, licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies21 September 1989PNO-II-89-066:licensees Prepared for Adverse Weather Conditions Due to Hurricane.Briefings Held W/Key Managers on Responsibilities to Check All Trailers,Secure Crane Hooks & Increase Emergency Food Supplies
PNO-II-89-066A, updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing21 September 1989PNO-II-89-066A:updates Status of Hurricane Hugo for Nuclear Facilities in Southeast.Manning of Incident Response Ctr by Region II Continuing
PNO-III-89-061, on 890913,reactor Recirculation Valve Drifted Open from Normal 56% to About 78% Following Maint.Caused by Solenoid Valve Failure in mid-position Allowing Excessive Oil to Flow to Control Valve.State of Oh Notified14 September 1989PNO-III-89-061:on 890913,reactor Recirculation Valve Drifted Open from Normal 56% to About 78% Following Maint.Caused by Solenoid Valve Failure in mid-position Allowing Excessive Oil to Flow to Control Valve.State of Oh Notified
ML20247N00711 September 1989PNS-I-89-015:revised Notification of Telephone Threat, Correcting Event Date from 890909 to 890911.Call, Originating from Limerick or Peach Bottom,Received at Corporate Ofc.On 890525,threat Received at Peach Bottom
PNO-V-89-047, on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No Damage8 August 1989PNO-V-89-047:on 890808,earthquake & Aftershock of 5.1 & 4.2 Magnitudes,Respectively,Occurred Approx 15 Miles Southwest of San Jose,Ca.Reactors Shutdown During Earthquake.Tour of GE Reactor Disclosed No DamageEarthquake
PNO-IV-89-045, on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage Occurred5 July 1989PNO-IV-89-045:on 890703,earthquake Near Tremonton,Ut Occurred.Earthquake Safety Interlocks Did Not Trip & No Damage OccurredEarthquake
PNO-III-89-032, on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall28 April 1989PNO-III-89-032:on 890425,while Plant Was in First Refueling Outage,Approx 30,000 Gallons of Condensate Storage Tank Water Inadvertently Was Drained Into Suppression Pool,W/Some Water Entering Drywell Over Weir Wall
PNO-V-89-022, on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release Occurred3 April 1989PNO-V-89-022:on 880403,earthquake of Magnitude of 4.5 on Richter Scale Occurred 10 Miles Northeast of San Jose,Ca. Automatic Seismic Protection Did Not Trigger Shutdown. Reactors Manually Shutdown.No Radioactive Release OccurredEarthquake
PNO-IV-89-020, Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants23 March 1989PNO-IV-89-020:Region IV Notified of Recent Reactor Trip at Palo Verde Unit 3 That Was Complicated by Inability to Open Steam Generator Atmospheric Dump Valves Mfg by Control Components,Inc.No Sticking Problems Noted at Other Plants
PNO-III-88-104, on 881221,licensee Detected Increased Airborne Radioactivity in Turbine & Offgas Bldgs.Airborne Activity Escaped from Offgas Treatment Sys When Water Seals in Sys Drain Lines Were Lost22 December 1988PNO-III-88-104:on 881221,licensee Detected Increased Airborne Radioactivity in Turbine & Offgas Bldgs.Airborne Activity Escaped from Offgas Treatment Sys When Water Seals in Sys Drain Lines Were LostLoop seal
PNO-I-88-116, on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process9 November 1988PNO-I-88-116:on 881108,voters Voted Down state-wide Referendum to Shutdown Plants in State of Ma If Nuclear Waste Produced in Process
PNO-III-88-081, on 880916,reactor Operators Observed Decrease in Flow Through Offgas Sys,Coupled W/Drop in Generator Electrical Output & Decrease in Main Condenser Vacuum. Plant Shut Down for Investigation Into Offgas Problem19 September 1988PNO-III-88-081:on 880916,reactor Operators Observed Decrease in Flow Through Offgas Sys,Coupled W/Drop in Generator Electrical Output & Decrease in Main Condenser Vacuum. Plant Shut Down for Investigation Into Offgas ProblemLoop seal
PNO-III-88-078, on 880904,fire Occurred in Two Charcoal Adsorber Tanks in Offgas Sys.Cause Under Investigation. Nitrogen Purge of Tanks Performed & Temps Reduced6 September 1988PNO-III-88-078:on 880904,fire Occurred in Two Charcoal Adsorber Tanks in Offgas Sys.Cause Under Investigation. Nitrogen Purge of Tanks Performed & Temps ReducedLoop seal
PNO-V-88-044, on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at Berkeley27 June 1988PNO-V-88-044:on 880627,earthquake Occurred 5 Miles East of Santa Cruz,Ca.Seismic Instrumentation Not Triggered at Vallecitos,Aerotest Operations or at Univ of California at BerkeleyEarthquake
PNO-III-88-058, on 880623,reactor Scrammed from 84% Power Due to Turbine Trip.Caused by Damaged Latching Mechanism in Turbine Control Sys.Latching Mechanism Repaired24 June 1988PNO-III-88-058:on 880623,reactor Scrammed from 84% Power Due to Turbine Trip.Caused by Damaged Latching Mechanism in Turbine Control Sys.Latching Mechanism Repaired
PNO-III-88-055, on 880616,reactor Scrammed Due to High Power Level in Reactor Core.Caused by Spurious Signal Generated After Reinsertion of Printed Circut Board in Recirculation Control Sys.Cause of Spurious Signal Under Investigation17 June 1988PNO-III-88-055:on 880616,reactor Scrammed Due to High Power Level in Reactor Core.Caused by Spurious Signal Generated After Reinsertion of Printed Circut Board in Recirculation Control Sys.Cause of Spurious Signal Under Investigation
PNO-V-88-038, on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at Facilities13 June 1988PNO-V-88-038:on 880612,earthquake Occurred on Calaveras Fault within 50 Miles of Identified Facilities.All Reactors Shutdown at Time of Earthquake.No Seismic Trips Observed. Insp Revealed No Signs of Damage at FacilitiesEarthquake
PNO-III-88-045, on 880518,licensee Began Plant Shutdown from 100% Power to Repair Hydrogen Seal Oil Sys for Main Generator.Caused by Sys Level Controller Failure.Seal Oil Sys Repair & Main Generator Inspection Scheduled18 May 1988PNO-III-88-045:on 880518,licensee Began Plant Shutdown from 100% Power to Repair Hydrogen Seal Oil Sys for Main Generator.Caused by Sys Level Controller Failure.Seal Oil Sys Repair & Main Generator Inspection Scheduled
PNO-IV-88-040, on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends9 May 1988PNO-IV-88-040:on 880509,System Energy Resources,Inc to Manage & Operate All Middle South Nuclear Plants.Arkansas Power & Light & Louisiana Power & Light Will Apply for Appropriate License Amends
PNO-III-88-016, on 880304,licensee Declared Alert After Both Trains of Decay Heat Removal Sys Were Declared Inoperable7 March 1988PNO-III-88-016:on 880304,licensee Declared Alert After Both Trains of Decay Heat Removal Sys Were Declared Inoperable
PNO-III-88-012, on 880222,unit Operating at Approx 100% Power,Drywell Floor Drain Sump Instrumentation Detected Unidentified Leakage Increase from 2.5 Gpm to 4.6 Gpm23 February 1988PNO-III-88-012:on 880222,unit Operating at Approx 100% Power,Drywell Floor Drain Sump Instrumentation Detected Unidentified Leakage Increase from 2.5 Gpm to 4.6 Gpm
PNO-I-88-020, on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom16 February 1988PNO-I-88-020:on 880216,CA Mcneill Named Executive Director - Nuclear W/Responsibility of Directing Nuclear Operations, Including Nuclear Dept Reorganization & Restart Efforts of Peach Bottom
PNO-I-88-017, on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named2 February 1988PNO-I-88-017:on 880202,util to Announce Change to Corporate Mgt,Per Highly Critical INPO Ltr.Jh Austin Will Retire as of 880301 & Jl Everett Will Assume Duties of President Until Replacement Named
PNO-I-88-001, on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure4 January 1988PNO-I-88-001:on 880104,realignment of Nuclear Mgt Updated. Action Provides for Corporate Officer at Each Plant to Elevate Level of Plant in Corporate Mgt Structure
PNO-III-87-148, low But Detectable Levels of I-131 Measured from Sample of Sewage Sludge Analyzed for Radioactivity,Per Resident 871125 Request.Second Sample Collected & Measured on 871202.No Evidence of Abnormal Releases from Plant3 December 1987PNO-III-87-148:low But Detectable Levels of I-131 Measured from Sample of Sewage Sludge Analyzed for Radioactivity,Per Resident 871125 Request.Second Sample Collected & Measured on 871202.No Evidence of Abnormal Releases from Plant
PNO-III-87-146, on 871129,one Valve Did Not Perform Properly During Surveillance Testing of Msiv.Caused by Deformation of Seal Matls in solenoid-operated Pilot Valve Due to Excessive Heat from Steam Leaks.Valves Rebuilt30 November 1987PNO-III-87-146:on 871129,one Valve Did Not Perform Properly During Surveillance Testing of Msiv.Caused by Deformation of Seal Matls in solenoid-operated Pilot Valve Due to Excessive Heat from Steam Leaks.Valves RebuiltStroke time
PNO-V-87-076, on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations Noted24 November 1987PNO-V-87-076:on 871123-24,two Moderate Earthquakes Centered Near Westmoreland,Ca Occurred,Triggering Seismic Alarms at San Onofre.Unusal Event Declared.Plant Sys & Components Not Adversely Affected.Effects on Other Locations NotedEarthquake
PNO-III-87-138, on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems3 November 1987PNO-III-87-138:on 871103,reactor Shutdown After Two MSIV Failed to Close.Valves Recycled Resulting in Acceptable Time Responses.Augumented Insp Team Dispatched to Plant Site to Review Possible Causes of MSIV Closure Problems
PNO-III-87-137, on 871027,reactor Srammed & ECCS Actuation Occurred Due to Deenergized Bus L12.Caused by Operator Mistakenly Tripping Supply Breaker from Transformer to Bus. Power Restored27 October 1987PNO-III-87-137:on 871027,reactor Srammed & ECCS Actuation Occurred Due to Deenergized Bus L12.Caused by Operator Mistakenly Tripping Supply Breaker from Transformer to Bus. Power Restored
PNO-II-87-069, on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations13 October 1987PNO-II-87-069:on 871012,Turkey Point Units 3 & 4 Declared NOUE Based on Potential for Hurricane Force Winds & Technical Support Ctr Activated for Mgt of Storm Preparation & Operations.St Lucie Also Made Severe Weather Preparations
PNO-I-87-093, on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted9 October 1987PNO-I-87-093:on 871009,util Announced Listed Changes to Corporate Nuclear Mgt to Provide for Corporate Officer at Each Plant & to Elevate Plant Level.Changes Will Be Effective on 871101.Nuclear Review Board Reconstituted
PNO-III-87-118D, on 870916,Region III Authorized Restart of Plant.Authorization Ltr Also Requested Meeting W/Nrc in Approx 45 Days.Reactor Shut Down Since 870906 Following Automatic Trip & Multiple Equipment Failure17 September 1987PNO-III-87-118D:on 870916,Region III Authorized Restart of Plant.Authorization Ltr Also Requested Meeting W/Nrc in Approx 45 Days.Reactor Shut Down Since 870906 Following Automatic Trip & Multiple Equipment Failure
PNO-III-87-118C, on 870911,augmented Insp Team Completed Review of Circumstances Surrounding 870906 Reactor Trip & Subsequent Equipment Problems.Meeting Scheduled for 870915 to Discuss Issues Re Plant Startup & Results of Review14 September 1987PNO-III-87-118C:on 870911,augmented Insp Team Completed Review of Circumstances Surrounding 870906 Reactor Trip & Subsequent Equipment Problems.Meeting Scheduled for 870915 to Discuss Issues Re Plant Startup & Results of Review
PNO-III-87-118B, AIT on-site Activities Concluded.Team Gathered Necessary Info to Evaluate Significance of Event by Interviewing Operators & Other Plant Personnel,Reviewing Records & by Observing Plant Conditions11 September 1987PNO-III-87-118B:AIT on-site Activities Concluded.Team Gathered Necessary Info to Evaluate Significance of Event by Interviewing Operators & Other Plant Personnel,Reviewing Records & by Observing Plant Conditions
PNO-III-87-118, on 870906,reactor Shut Down.Caused by Reactor Trip Due to Various Equipment Malfunctions.Two Valves Removed for Insp & Events & Malfunctions Under Evaluation. Confirmatory Action Ltr Re Plant Startup Will Be Issued8 September 1987PNO-III-87-118:on 870906,reactor Shut Down.Caused by Reactor Trip Due to Various Equipment Malfunctions.Two Valves Removed for Insp & Events & Malfunctions Under Evaluation. Confirmatory Action Ltr Re Plant Startup Will Be Issued
PNO-III-87-111, on 870821,severe Thunder Storms & Lighting Caused Grid Disturbance & Tripped Main Generator on High Vibration.Expected Automatic Isolation of Steam Supply Did Not Occur.Caused by Faulty Pressure Switch.Switch Repaired24 August 1987PNO-III-87-111:on 870821,severe Thunder Storms & Lighting Caused Grid Disturbance & Tripped Main Generator on High Vibration.Expected Automatic Isolation of Steam Supply Did Not Occur.Caused by Faulty Pressure Switch.Switch Repaired
PNO-III-87-102, on 870731,security Shift Supervisor Accidentally Fired .38 Caliber Bullet Into Filing Cabinet. Procedure Changed to Prohibit Supervisors from Checking, Storing or Cleaning Weapons in Ofcs31 July 1987PNO-III-87-102:on 870731,security Shift Supervisor Accidentally Fired .38 Caliber Bullet Into Filing Cabinet. Procedure Changed to Prohibit Supervisors from Checking, Storing or Cleaning Weapons in Ofcs
PNO-II-87-053A, on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted30 July 1987PNO-II-87-053A:on 870730,State of Ny,Dept of Environ Conservation & Dept of Radiation Health Completed Survey of Miscellaneous Boxes & Equipment W/Markings from VEPCO Found in Abandoned Bldg in Springwater,Ny.No Problems Noted
PNO-II-87-053, on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 329 July 1987PNO-II-87-053:on 870728,licensee Notified That Fireman Discovered Miscellaneous Boxes & Equipment in Abandoned Bldg Outside Springwater,Ny.Matl Might Be Clean Surplus Matl Disposed of After Cancellation of North Anna 3
PNO-III-87-101, on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered27 July 1987PNO-III-87-101:on 870726,licensee Received Bomb Threat from Caller Angry Because Place of Residence Lost Power During Storm.Security Personnel Notified & Search Procedures Implemented.No Bomb Discovered