 Issue dateTitleTopic
ML20055C39226 February 1990Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166)
ML20248G97320 September 1989Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu
ML20247H64112 September 1989Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1)
ML20247K22311 September 1989Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe
ML20247E3377 September 1989Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCMOffsite Dose Calculation Manual
Process Control Program
IR 05000029/198901431 August 1989Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted
ML20246Q01231 August 1989Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted
ML20246C39415 August 1989Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted
ML20246C82111 August 1989Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl
ML20248D6924 August 1989Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of PlanNuclear Accident Reporting System
ML20248C0563 August 1989Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review
ML20245H5332 August 1989Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed
ML20247H68925 July 1989Requests Proposed Design Change to Containment Hydrogen Monitoring Sys,W/Schedule for Implementing Change or Justification for Existing Configuration
ML20246A29529 June 1989Forwards Request for Addl Info Re NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs
ML20246L22126 June 1989Forwards Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Revise Tech Specs by Removing Tech Spec Figures 6.2-1 & 6.2-2 Re Organizations Functional Requirements
ML20245J33022 June 1989Provides Background Info on Regulatory Analysis Supplementing NRC Proposed Backfit,Per 890413 Request.Util Expected to Provide Schedule for Implementation of Required ImprovementsBackfit
ML20245F26916 June 1989Forwards SER Accepting Licensee 850612 Response to Generic Ltr 83-28,Item 4.5.3 Re Trip Reliability & on-line Functional Testing of Trip Sys
ML20245B17315 June 1989Ack Receipt of Rev 55 to QA Topical Rept CE-1-A.Program Satisfies Requirements of 10CFR50,App B & Acceptable
ML20245H14915 June 1989Submits Correction/Clarificaton to Util 890508 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Program on Critical Air Demand Equipment Is in Addition to Investigations Performed
ML20244C2949 June 1989Advises Tht Util 890329 Request for Approval to Use Fuses for Electrical Isolation of non-Class 1E Dc Power Sys Acceptable Provided That Circuit Breaker in Parallel to Two Fuses Locked Open
ML20244C5091 June 1989Advises That Bunker Ramo Penetration Assemblies Environmentally Qualified to Perform Intended Functions for Plants,Per 890224 Rept & .Concerns Expressed in Re Byron Unit 2 Satisfied
ML20248C26731 May 1989Forwards Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21)
ML20247M77326 May 1989Forwards Director'S Decision Re Ohio Citizens for Responsible Energy 10CFR2.206 Petition Re 880309 Power Oscillation Event at Lasalle,Unit 2
ML20247J78019 May 1989Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Mutually Agreed Upon Between NRC & Westinghouse During 890411 Meeting
ML20247H35119 May 1989Advises That Licensee Response to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation,Per Rev 3 to Reg Guide 1.97,acceptable,except for Four Items Listed in Technical Evaluation Rept
ML20247G52418 May 1989Responds to Re Util Position on Dealing W/Dc Grounds After Discussion W/Nrc in 890301 Meeting.Continued Plant Operation Will Be Allowed Only So Long as Applicable Limiting Conditions/Or Action Statements Met
ML20247C15218 May 1989Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Understands That Westinghouse Will Provide Util W/Generic Bounding Analysis Re Seismic Loadings
ML20247B24117 May 1989Comments on Expeditious Actions & Notice of Audit on Generic Ltr 88-17 Re Potential Loss of Dhr.Requests Addl Info Re Training Packages,Administrative Controls for Containment Closure & RCS Level Indications
ML20246Q15116 May 1989Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Per 890411 Meeting W/Westinghouse Owners Group.Proposed Schedule for Analysis Must Be Accelerated
ML20246P81415 May 1989Requests Addl Info Re 881130 Application for Amends to Licenses Per Generic Ltr 87-09.Affirmation Should Be Provided That Procedures,Mgt Directives & Onsite Reviews Limit Use of Spec 3.0.4 Exceptions
ML20246L27411 May 1989Forwards Anl Draft Rept Re Main Steam Line Breaks in Plants Ice Condenser,Per Util 880613,0907 & 1012 Ltrs & WCAP-10988 & WCAP-10986P,for Review & Comments within 60 Days.W/O Encl
ML20246Q0738 May 1989Forwards Revised Tech Spec Page B 3/4 4-2,clarifying Operability Requirements for PORVs in Manual or Automatic Mode,In Response to Util 881212 Request
ML20247A7783 May 1989Extends Invitation to Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Meeting Agenda Encl
ML20247A5943 May 1989Extends Invitation to Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Meeting Agenda Encl
ML20246Q3713 May 1989Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda & Info Re Lodging Arrangements Encl
ML20245L32228 April 1989Ack Receipt of 881223 Submittal of Rev 8 of QA Topical Rept CPC-2A Re Transfer of QA Assigned Functions to Other Plant Organizations & Continuing QA Organizations Program Control. Topical Rept Acceptable & Meets 10CFR50,App B
ML20245J06225 April 1989Forwards Amends 114,30,141 & 33 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Modify Tech Specs of Four Units to Be Consistent W/Plant Restart Provision in 10CFR50.36 If Safety Limit Exceeded
ML20245C35720 April 1989Forwards Revised Plant Emergency Operating Procedure Insp Schedule
ML20245D85119 April 1989Requests Schedule to Implement Alternate Rod Injection/ Reactor Trip Sys Design in Full Compliance W/Atws Rule, within 60 Days
ML20244E28114 April 1989Requests Prompt Review & Reporting of Status of Implementation of TMI Action Plan Items at Plants.Printout of All TMI Items Annotated Where Tracking Sys Indicates That Implementation Not Complete Encl
ML20245C82214 April 1989Requests Prompt Review & Reporting of Status of Implementation of TMI Action Plan Items at Facilities. Printout of TMI Items Annotated Where Tracking Sys Indicates That Implementation Incomplete,Encl
ML20244C20410 April 1989Accepts Util Actions in Response to Generic Ltr 88-10 Re Nonconforming molded-case Circuit Breakers & Date of 890701 for Providing Summary of Traceability Determinations & Replacement of non-traceable Breakers
ML20244A8396 April 1989Advises That Emergency Operating Procedures Insp Will Be Conducted at Facilities on 890508-19.List of Required Documents & Insp Schedule Encl
ML20248K5455 April 1989Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal
ML20247P27831 March 1989Concurs W/Position Delineated in Re Fire Barrier Penetration Internal Conduit SealsFire Barrier
ML20247P04616 March 1989Consents to Proposed Restructuring of Util.Proposed Action Will Not Affect Qualifications of Util as co-owner & Operator of Plants Consistent W/Applicable Provisions of Law,Regulations & Other Requirements Issued by Commission
ML20235Z6507 March 1989Ack Receipt of 890127 Submittal of Rev 54 to QA Topical Rept CE-1-A.Program Continues to Satisfy Requirements of 10CFR50,App B & Acceptable
ML20246L7483 March 1989Confirms 890323 Meeting in Glen Ellyn,Il to Discuss Util Quality Verification Program,Per
ML20236A9971 March 1989Comments on Licensee Response to Generic Ltr 88-17 Re Expeditious Actions for Loss of Dhr.Advises That Licensee May Wish to Consider Several Observations in Order to Assure That Actions Adequately AddressedLoop seal
ML20235R08125 February 1989Advises That Incorporation of ASME Code Case N-401-1 Into Inservice Insp Programs at Plants Acceptable,Per 880815 Request.Code Case N-401, Eddy Current Exam & Rev to Code, Code Case N-401-1 Found to Be Technically Equivalent