Issue date | Title | Topic | |
---|---|---|---|
ML20212K867 | 30 September 1999 | Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts | Hot Short Safe Shutdown Temporary Modification |
ML20210P951 | 10 August 1999 | Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl | |
ML20210P161 | 4 August 1999 | Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities | |
ML20203C237 | 8 February 1999 | Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl | |
ML20196B037 | 19 November 1998 | Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl | Safe Shutdown Met Tower |
ML20195D867 | 3 November 1998 | Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl | |
ML20154C477 | 2 October 1998 | Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling | Anticipated operational occurrence Recently irradiated fuel |
ML20236R366 | 14 July 1998 | Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl | |
ML20217H340 | 31 March 1998 | Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl | Offsite Circuit |
ML20217C836 | 24 March 1998 | Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl | Offsite Circuit |
ML20203B300 | 5 February 1998 | Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl | |
ML20203A264 | 3 February 1998 | Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl | |
ML20138G482 | 29 April 1997 | Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl | Safe Shutdown Fire Barrier |
ML20147J208 | 9 April 1997 | Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl | |
ML20135C478 | 4 December 1996 | Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees | |
ML20149D605 | 15 September 1993 | Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues | Generic Fundamentals Examination License Renewal Inattentive |
ML20056E973 | 9 August 1993 | Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl | Reactor Vessel Water Level Probabilistic Risk Assessment |
ML20206L983 | 25 November 1988 | Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl | |
ML20151R539 | 8 August 1988 | Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed | |
ML20153G548 | 4 May 1988 | Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items | |
ML20236J229 | 30 October 1987 | Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl | |
ML20214J499 | 15 May 1987 | Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl | |
ML20211M976 | 24 February 1987 | Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl | |
ML20213F064 | 10 November 1986 | Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl | Reactor Vessel Water Level Ultimate heat sink |
ML20207B014 | 31 October 1986 | Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl | |
ML20203G692 | 25 July 1986 | Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl | |
ML20203G496 | 24 July 1986 | Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis | |
ML20202B181 | 2 July 1986 | Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept | |
ML20210R847 | 13 May 1986 | Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl | Shutdown Margin Scram Discharge Volume |
ML20141G290 | 7 April 1986 | Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl | |
ML20154N831 | 11 March 1986 | Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits | Anchor Darling |
ML20137L102 | 17 January 1986 | Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl | Safe Shutdown Reactor Vessel Water Level Post Accident Monitoring |
ML20140B350 | 17 January 1986 | Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl | |
ML20137K547 | 17 January 1986 | Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl | Safe Shutdown |
ML20151M710 | 24 December 1985 | Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl | |
ML20138N552 | 17 December 1985 | Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl | |
ML20138S105 | 13 November 1985 | Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl | Safe Shutdown |
ML20136E977 | 13 November 1985 | Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl | |
ML20138P722 | 30 October 1985 | Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl | |
ML20133H244 | 9 October 1985 | Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl | Hydrostatic |
ML20134N059 | 27 August 1985 | Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl | |
ML17276A176 | 2 November 1981 | Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl | |
ML20214G871 | 11 January 1978 | Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl | |
ML20198F560 | 22 January 1974 | Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program |