MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212K8671999-09-30030 September 1999 Summaries of 971111,980317,980505,980623,980707,980806, 980917,981023,981110,981217,990114,990205,990318,990325, 990416 & 990714 Meetings with Licensee Re Implementation of plan-for-excellence Restart Issues.With Minutes & Handouts ML20210P9511999-08-10010 August 1999 Summary of 990722 Meeting with Util in Rockville,Md Re Recently Signed Asset Purchase Agreement Between Licensee & Amergen Energy Co & Proposed Transfer of CPS License to Be Submitted to Nrc.List Meeting Attendees & Handout Encl ML20210P1611999-08-0404 August 1999 Summary of 990415 Meeting with Utils in Knoxville,Tn Re Status of Mark 3 Program Designed to Determine & Validate Submerged Structure Drag Loads of Newley Installed ECCS Strainers at Perry,Grand Gulf & Clinton Facilities ML20203C2371999-02-0808 February 1999 Summary of 990121 Meeting with Illinois Power Company in Rockville,Maryland Re Proposed Changes to Degraded Voltage Relay Setpoints as Described in License Amend Submittal .List of Meeting Participants & Meeting Handouts Encl ML20196B0371998-11-19019 November 1998 Summary of 980917 Meeting with Util in Rockville,Md to Discuss Progress of Plant Toward Restart.List of Meeting Participants & Handouts Encl ML20195D8671998-11-0303 November 1998 Summary of 981027 Meeting with Illinois Power Co in Rockville,Md Re Proposed Feedwater Leakage Control Sys as Described in License Amend Submittal .List of Attendees & Meeting Handout Encl ML20154C4771998-10-0202 October 1998 Summary of 980908 Meeting with Cleveland Electric Illuminating Co,Entergy Operations,Inc & Illinois Power Co Re Joint Effort to Propose TSs to Reduce Requirements on Secondary Containment Integrity During Refueling ML20236R3661998-07-14014 July 1998 Summary of 980625 Meeting W/Util in Rockville,Md Re Proposed Testing Program for ECCS Suction Strainers,Recently Installed at Perry & Grand Gulf Facilities & Will Soon Be Installed at Clinton Facility.Attendees List Encl ML20217H3401998-03-31031 March 1998 Summary of 970717 Meeting W/Util in Rockville,Md Re Issue of Degraded Grid Voltage at Plant.List of Participants & Meeting Handouts Encl ML20217C8361998-03-24024 March 1998 Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl ML20203B3001998-02-0505 February 1998 Summary of 971211 Meeting W/Illinois Power Co in Clinton, Illinois Re Findings of NRC Special Evaluation Team.List of Meeting Attendees & Copy of Meeting Handout Encl ML20203A2641998-02-0303 February 1998 Summary of 980127 Meeting W/Illinois Power Co in Rockville, Maryland Re Potential Fix for Issue of Degraded Voltage at Clinton Power Station.List of Meeting Attendees & Copy of Meeting Handout Encl ML20138G4821997-04-29029 April 1997 Summary of 970421 Meeting W/Util in Rockville,Md to Discuss Licensee long-term Plans for Resolution of Thermo-lag Related Issues.List of Participants & Copy of Meeting Handout Encl ML20147J2081997-04-0909 April 1997 Summary of 970403 Meeting W/Illinois Power Co in Rockville, MD Re Licensee Amend Application on Degraded Voltage Instrumentation for Clinton Power Station.List of Attendees & Copy of Handouts Encl ML20135C4781996-12-0404 December 1996 Summary of 961121 Meeting W/Util in Rockville,Md to Discuss Proposed Transfer of Minority Ownership Interest in Plant. W/List of Attendees ML20149D6051993-09-15015 September 1993 Summary of 930708 Region III Annual Training Managers Conference in Glen Ellyn,Il.Purpose of Meeting to Provide Forum for Discussion on Rev 7 of Operator Licensing Examiner Stds & to Discuss Operator Licensing Issues ML20056E9731993-08-0909 August 1993 Summary of 930728 Meeting W/Util in Rockville,Md to Discuss Proposed Mods to Reactor Vessel Water Level Instrumentation, Per NRC Bulletin 93-03.List of Attendees Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20151R5391988-08-0808 August 1988 Summary of 880623 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines. Resolution of Issues Listed ML20153G5481988-05-0404 May 1988 Summary of 880427 Telcon W/Utils in Region III Re Personnel Changes,Follow Up on Previous Items,Items of Interest from Sites & New Items ML20236J2291987-10-30030 October 1987 Summary of 871007 Meeting W/Hydrogen Control Owners Group (Hcog) Re Hcog Submittals on Methods for Calculating Equipment Temp Based on Quarter Scale Test Data & Impact of Station Blackout Considerations on Hcog Programs.W/Encl ML20214J4991987-05-15015 May 1987 Summary of Operating Reactors Events Meeting 87-09 on 870330 Re Events Which Occurred Since 870316 Meeting.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Events Presented Encl ML20211M9761987-02-24024 February 1987 Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl ML20213F0641986-11-10010 November 1986 Summary of Operating Reactors Events Meeting 86-36 on 861020.List of Attendees,Events Discussed,Significant Events Data Sheet,Summary of Scrams W/Complications & Status of Previous & New Assignments Encl ML20207B0141986-10-31031 October 1986 Summary of 861022 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Emergency Procedure Guidelines for Hydrogen Generation Event & Validation of Methods for Calculating Heat Transfer.Viewgraphs Encl ML20203G6921986-07-25025 July 1986 Summary of 860619 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Mods of Clasix-3 Computer Code & Secondary Burning in Quarter Scale Test.List of Meeting Attendees & Handouts Encl ML20203G4961986-07-24024 July 1986 Summary of 860715 Telcon W/Util Re Siumulator Exercise During NRR Mgt Assessment 860709 Meeting.Observation Made Re Difficulty in Determining Actions for Event Resulting in Loss of Hpis ML20202B1811986-07-0202 July 1986 Summary of Allegation Review Board 860625 Meeting at Region III Re Drug Use by Us Testing Personnel,Urine Sampling Program,Defective Relays & Inadequate Experience in Radwaste Dept ML20210R8471986-05-13013 May 1986 Summary of Operating Reactors Events Meeting 86-16 on 860512 Re Events Occurring Since Last Meeting.List of Attendees & Related Info Encl ML20141G2901986-04-0707 April 1986 Summary of 860313 Meeting W/Mark III Containment Hydrogen Control Owners Group in Bethesda,Md Re Heat Loss Analysis. List of Attendees,Handout & Viewgraphs Encl ML20154N8311986-03-11011 March 1986 Summary of 860128-29 Meetings W/Util,Sargent & Lundy & BNL in Chicago,Il Re Test Vs Analysis Concern for Active Valve Qualification Identified During Sqrt & Pvort Audits ML20137L1021986-01-17017 January 1986 Summary of 860113 Meeting W/Util & Region III in Bethesda,Md Re Fuel Load Readiness & Definition of Approach for Completing Remaining Tasks.List of Attendees & Supporting Documentation Encl ML20140B3501986-01-17017 January 1986 Summary of 851219 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Heat Sink Modeling.List of Attendees & Viewgraphs Encl ML20137K5471986-01-17017 January 1986 Summary of 851218 Meeting W/Mark III Containment Hydrogen Control Owners Group Re Combustible Gas Control Emergency Procedure Guideline.Attendees List,Draft Emergency Procedure Guideline & Viewgraphs Encl ML20151M7101985-12-24024 December 1985 Summary of 851216 Meeting W/Util in Bethesda,Md Re Accelerated Power Ascension Program.List of Meeting Attendees & Handouts Encl ML20138N5521985-12-17017 December 1985 Summary of 851120 Meeting W/Hydrogen Control Owners Group Re Status & Results of Hydrogen Combustion Tests in quarter- Scale Test Facility (Mark Iii).Attendee List & Handouts Encl ML20138S1051985-11-13013 November 1985 Summary of 851106-07 Meetings W/Util & Sargent & Lundy in Bethesda,Md Re Fire Protection.List of Attendees,Meeting Agenda & Safe Shutdown Analysis Deviation Requests Encl ML20136E9771985-11-13013 November 1985 Summary of 851106 Meeting W/Util in Bethesda,Md Re Status of Hydrogen Control Program,Overview of Hydrogen Control Preliminary Analysis & Schedule for Staff Review of Analysis.Meeting Handouts & Attendees List Encl ML20138P7221985-10-30030 October 1985 Summary of 851021 Meeting W/Util,Sargent & Lundy,Bnl & S&W in Bethesda,Md to Demonstrate That Pump & Valve Operability Program in Compliance W/Nrc Reg Guide.Viewgraphs Encl ML20133H2441985-10-0909 October 1985 Summary of 850926 Meeting W/Util & BNL in Bethesda,Md Re Util Recovery Program Following Unsatisfactory Pvort Audit on 850826.List of Meeting Attendees & Viewgraphs Encl ML20134N0591985-08-27027 August 1985 Summary of Caseload Forecast Panel 850723-24 Meetings W/Util at Plant Re Const Progress Review & Estimation of Resource Needs for Licensing Activities.Fuel Load Date of Jan 1986 Appears Achievable.Viewgraphs Encl ML17276A1761981-11-0202 November 1981 Forwards Minutes from Mechanical Engineering Branch 810929-30 & 1001 Meetings in Woodbury,Ny & 811016 Preservice Insp Meeting in Washington,Dc.Agenda Items from Both Meetings & Subsequent Resolution Encl ML20214G8711978-01-11011 January 1978 Summary of 771202 Meeting W/Ge Re Rev 1 to NEDO-10466, Power Generation Control Complex Design Criteria & Safety Evaluation. List of Meeting Attendees Encl ML20198F5601974-01-22022 January 1974 Summary of 740115 Site Visit to Inspect Onsite Meteorological Monitoring Program 1999-09-30
[Table view] |
Text
_ .. ._-
[#
- UNITED STATES NUCLEAR REGULATORY COMMISSION
{ ,, . j WASHINGTON. D. C 20555
e
- .'.". . . & OCT S 1985 Docket No. 50-461 APPLICANT: Illinois Power Company FACILITY: Clinton Power Company SU6 JECT:
SUMMARY
OF MEETING WITH ILLIN0IS POWER COMPANY RELATED TO THE PV0RT RECOVERY PROGRAll A meeting with Illinois Power Company (IP) was held with the NRC staff and its consultant BNL on September 26, 1985, in Bethesda, Maryland. The purpose of the meeting was to discuss IP's recovery program following the unsatisfactcry PVORT audit at Clinton the week of August 26, 1985. A list of meeting attendee's is contained in Enclosure 1.
4 S. Perry of IP and R. Heider of Sargent and Lundy (S&L) described IP's PVORT recovery program that has been developed to meet the regulatory requirements.
Enclosure 2 contains copies of the vu-graphs used dt. ring their presentation.
Following the presentation the NRC staff caucused and presented IP with the following requests and conclusions:
4
- 1) Provide two procurement specifications complete with all revisions by l October 2, 1985. One of the specifications should be for RCIC suction isolation valve E51-F063.
- 2) To provide the staff assurance of the acceptability of the recovery program IP should return to Bethesda during the latter part of October 1985 prepared to describe the overall program plan by going through, in detail, the qualification of the RCIC suction isolation valve E51-F063.
- 3) Provide precedure PI-CP-079 developed by S&L for IP to assure compliance of the equipment packages with the regulatory requirements by Octcber 2, 1985.
- 4) Assuming that the staff finds the above items acceptable the staff will be prepared to perform a reaudit of the PVORT program for Clinton during the month of November on dates proposed by IP provided the staff has no conflict that would take priority. This also assumes that IP will provide an equipment master list to the staff on a schedule that will support the proposed reaudit dates.
i 1
851016032t3 851CX19 PDR ADOCK 05000461 A PM
,. r., , a- .:.=u : - -- : - - ,
.. c. : - - - - -- - - --- - - - - -- - - -- - -- - --- - -
+
Copies of items 1 and 3 were received by the staff and BNL on September 30, 1985.
l /
4 ron Sie el, Project Manager '
licensing Branch No. 2 Division of 1.icensing i
Enclosures:
j As stated f cc: See next page P
4 i
i 4
7 j
a y - . ,,,,,yg.--. --m...n - my - . , -,- .. . - - , n .- w.,. .-,,,-,n ,r,, ,n,,.,me , , , - - , , -- .,oww-o ,-wm-y-- -ew-- >~-vm--s e m w m,www-
4 Copies of items 1 and 3 were received by the staff and BNL on September 30, 1985.
Original Signed by Byron Siegel, Project Manager Licensing Branch No. 2 Division of licensing
Enclosures:
As stated cc: See next page j
2 OISTRIBUTION:
l ONU NRC PDR
- local PDR PRC System
- NSIC i LB#2 Reading j Goddard, OELD
- BSiegel EPylton i
l t
l I
s 1
4
- LB#, LB#2/DL/BC i .lb-WButler-5 10A)/85 L
p ,~ ~.-. - . . . - = - - . - . - a .. . .. : . . . ~ _ . . . . .- .
l_ j - -
l i-4 Mr. Frank A. Spangenberg Clinton Power Station Illinois Power Company Unit 1 cc:
4 Mr. Allen Samelson, Esquire Jean Foy, Esquire Assistant Attorney General 511 W. Nevada ~
Environmental Control Division Urbana, Illinois 61801
- Southern Region 500 South Second Street Richard B. Hubbard Springfield, Illinois 62706 Vice President Technical Associates i Mr. D. P. Hall 1723 Hamilton Ave. - Suite K l
Vice President San Jose, CA 95125 ,
Clinten Pcwer Station P. O. Box 678 Clinton, Illinois, 61727 Mr. H. R. Victor Manager-fluclear Station Engineering Opt.
Clinton Power Station P. O. Box 678 Clinton, Illinois 61727 I
Sheldon Zabel, Esquire
, Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago. Illinois 60606 Resident Inspector U. S. Nuclear Regulatory Cct.nission RR 3, Box 229 A Clinton, Illinois 61727
- Mr. R. C. Heider Projectf!anager Sargent & Lundy Engineers >
55 East licnrce Street
- Chicago, Illinois 60603
, Mr. L. Larson Project Manager
, General Electric Company i . 175 Curtner Aver.ue, N/C 395 San Jose, California 95125 t ,
.iagicnal Administrator, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 I
. ... . . . - - .. _ _= -_ - . -- ._ .-
Enclosure 1 September 25, 1985 Meeting on PVORT ReAudit Recovery Program i Name Affiliation Byron Siegel PM/DL
.i .
Jim Lombardo EQB Goutam Bagchi NRR/DE/EQB Bruce Miller BNL Arnold Lee NRR/DE/EQB Bruce Weinhold S&L 4
R. C. Peider S&L i A. E. Meligi S&L C. T. Gentile IP Parltio Rayfircar IP J. S. Perry IP Walt Emerson SWEC Paul Telthorst IP
, Doyle Wilson IP i
4 l
l l
f 4
f l
i Enclosure 2 .
t I
NRC PVORT AUDIT CONCERNS
- 1. INADEQUAC OF PVORT PACKAGES '
- The Accuracy Active Pump & Valve List
- Procedure for Revision and. Approvals of I packages l
- Component Qualification Status i e Component Installation Status
- Qualific.ation Documentation Review p
2 TEST VS ANA. LYSIS l
( x
I
,r -
PVORT PROGRAM l
In-Shop Tests Shell & Disk Hydrostatic !
Test EQ Program Main & Back Seat Leakage SQRT Program Test '
Clyclic tests Evaluation of mounting .
Operating Cycle Test (pumps)
Thermal and radiation tests followed by a Pump Perfonnance Tests Stress evaluation under functional test different seismic Overspeed Test condition at critical ;
Operated during and locations after LOCA test Qualification Tests and Analysis functional capability
- Functional test after prior to testing the LOCA test EQ results Operational verification (SQresults during and after testing Post-Installation Tests Functional capability after test Cold Hydrostatic Tests Deflection at critical i
Hot Functional Tests location Startup Tests 4
In-Service Tests 1 .
( '--
3 .
I i
_ITON PIPP & VALVE 0) ERA 3I _.:TY C
Ah A _YSIS & "ES" A))R0ACi t
A. VALVES
! *0PERABILITY DEMONSTRATED BY TEST
- VALVE ASSEMBLY (OPERATOR & VALVE BODY) l '0PERABILITY DEMONSTRATED BY ANALYSIS
- ANALYSIS,'M.ETHQD CONFIRMED BY TEST
! B. PUMPS .i
'0PERABILITY DEMONSTRATED BY ANALYSIS
' MOTOR OPER, ABILITY DEMONSTRATED BY ANALYSIS
1
~
1 .
yf .
[/ 1
/
i:
TEST AND ANALYSIS STANDARD REVIEW PLAN GUIDELINES k
?
INTEGRITY
' ANALYSIS:ALONE ACCEPTABLE IF STRUCTURAL ALONE ASSURES OPERABILITY i:
'I ,
- COMBINATION OF TNST AND ANALYSIS IS ACCEPTABLE WHEN COMPL.TE E TESTING IS, IMPRACTICAL I
i
)
t ]
~'~
s I
VA_VE ASSEM3LY 03ERAB:'L::TY VER: F:: CATION BY TESTING e
- STATIC PULL TEST OF REPRESENTATIVE VALVE ASSEMBLIES TO VERIFY STROKING UNDER 5G TO 12G SIMULATED SEISMIC LOAD (CLINTON WORST CASE 4.5G)
- SEISMIC TESTING REPRESENTATIVE VALVE ASSEMBLIES
- lN-SITU TESTING OF REPRESENTATIVE VALVE ASSEMBLIES
.~ .
I REPRESENTATIVE VALVE ASSEMBLY i
IN-SITU TESTING l
l
- 2" Motor-0perated Gate Valve 4" Motor-0perated Gate Valve ,
i 6" Motor-0perated Gate Valve 12" Motor-0perated Globe Valve
!, 14" Mot'or-0perated Gate Valve (HPCS) 16" Motor-0perated Butterfly Valve 4
l '
MS Isolation Valve t .
1
l \ ..
PUMP OPERABILITY VERIFICATION BY ANALYSIS ,,
- PUMP SHAFT (IMPELLER) DEFLECTION DEMONSTRATES NO INTERFERENCES WITH CASING
!
- PUMP MOTOR SHAFT (ROTOR) DEFLECTION DEMONSTRATES
- NO INTERFERENCE WITH STATOR ,
' l
' ALIGNMENT OF MOTOR-PUMP SHAFTS AT COUPLING DEMONSTRATED TO SATISFY VENDOR REQUIREMENTS i -
I
!
- BEARINGS CHECKED FOR QUALIFIED LIFE j i 1 -
,1 l
i l
_ , Y
" - - ' ~ '
( ) :
I PUMP OPERABILITY VERIFICATION BY TESTING i l
Adequacy of analytical models used by S & L verified by IN-SITU impedence~ testing conducted for other S & L projects ,
RBCCW Pump and Motor LPCS Pump and Motor RCIC Pump SLC Pump and Motor
\ '
~
t
. t i
i l VALVE ASSEMBLY 0)ERABILITY VERIFICATION BY ANALYSIS I
1 4 i -
- ' VALVE STRESSES DEMONSTRATED TO BE IN ELASTIC RANGE i
' VALVE STEM (YOKE) DEFLECTION DEMONSTRATED NOT TO CAUSE ,
1 i BINDING .
I i 4
I
\
l l Comparison Between Clinton Active Valves and Clinton Valve Assemblies Tested Valve Size (inches)
Valve Type
.5C .75 1 1.5 2 2.5 3 4 6 8 10 12 14 16 18 20 24 30 36 Gate A A A A A A A A A A A A A A A Globe A A A A d 1 1 1 1 A A A ,
A l
Butterfly A A A A A A A A A A A Plug / ball. A A A l
Safety relief
g g relief -
j Check A A A A A 1 1 A A A A A A A Clinton active valve size f r
a Range of Clinton valve assemblies tested l Range of. valve assemblies tested . :
(Sargent & Lundy Nuclear Projects) l
l
-]
-)
Comparison Between Clinton Active Valves and ,'
Clinton Valve Assemblies Tested i
Valve Size (inches)
Valve _
! Type
. 5C .75 1 1.5 2 2.5 3 4 6 8 10 12 14 16 18 20 24 30 36 Gate A Ad l
Clobe A A A i
Butterfly A A A I Plug / ball. A A A i
Safety '
O' Ih;}'}
relief l gl vacuum .
g relief Check A AA AAA A AAA A A A ,
A Clinton active valve size 5 Range of Clinton valve assemblies tested ,
Range of; valve assemblies tested . l l (Sargent & Lundy Nuclear Projects)
l . -
-. . . t
\
3
. -3 t
- . , i Comparison Between Clinton Active Valves and s ClintonValveAssembliesfTested a
. + .
l e I
- ( l valve size (inches).' ,
valve ,
Type
.50 .75 1.5 2 2.5 10 12 14 18 l 1 3 4 6 8 16 20 24 30 36 -
Gate A AA l . i ,t Globe .
(%'4 k-I Butterfly AA i
Plug / ball. d A A
) Safety I relief I Vacuum *g j j relief j t Check A A ,
AAAA A AAA
. l .
l A Clinton active valve sizd- .
g Range of Clinto[1 valve Assemblies testgd; j W Range of: valve assembliesf tested . - -
(Sargent & Lundy Nuclear Projects) -
=_._m._
\ .
TESTlilG PERFORMED 0?) REPRESENTATIVE VALVEhSEM3DAGE LIES VALVE DESCRIPTION PARAMETERS SIZE - RATlHG - SHAKE TABLE STATIC MAXIf1tM 0 PETTING CLOSING /
B0DY TYPE AND QUALIFICATIOlf PULL TEST VALVE VALVE TINE ACTUATOR TYPE TEST TEST INPUT _
PRESSURIZATION CYCLED MONITORED 1" - 600# GLOBE WITH X 9.4c YES YES YES AIR OPERATOR 1k" - 600# GLOBE WITH X 9.70 YES YES YES AIR OPERATOR 5" - 600# GLOBE WITH X 10.5s YES YES YES
\lR OPERATOR .
1" - 600# GLOBE WITH X 9.2G YES ' YES YES tlR OPERATOR
- 1500# GLOBE WITH X 9. 4r, YES YES YES
'LIR OPERATOP.
.h" - 2500# GLOBE WITH X 6.00 YES YES YES OTOR OPERATOR
- 600# GLOBE WITH X 4.50 YES -
YES YES OLEN0iD OPERATOR -
" ~
- 2500# GLOBE WITH =
X 4.5G- YES
~
YES s YES
, SLEN01D OPERATOR ~
i , ,
l " ' ' '
, PAGE 2 -
VALVE DESCRIPT10:1 DARAf1ETERS l
- SIZE - RATING - SHAKE TABLE STATIC ' MAXIMU'1 OPENING CLOSING /
! BODY TYPE AND QUALIFICATION PULL TEST VALVE VALVE TIME ACTUATOR TYPE TEST TEST INPUT , PRESSURIZATION CYCLED M0lllTORED
- 5/8" - 150# GLOBE
- ilTH S0LEN0ID X 11 . 5 0 YES YES YES
- )PERATOR i L2" - 150# WAFER jiTOP VALVE WITH X 11','Oc YES YES YES ILIROPERATOR ,
[L2"-150r
- IUTTERFLYWITH 1
X 3.0a YES YES -N0
- ilR OPERATOR i" - 150#
iUTTERFLY WITH X 3.0s YES YES N/A lANUAL GEAR
~
1" - 300# GATE
, flTH MOTOR X 6.75a YES YES -
YES IPERATOR
~
.6" - 1500# 6 ATE
~
~
!IITHMOTOR X 6'.75s YES YES YES 4 ,
jIPERATOR . .
i
PAGE ?
1 .
I VALVE i
DESCRIPTION PARAf1ETERS SHAKE TABLE " STATIC HAXIMUM OPENING CLOSING /
SIZE - RATING -
QUALIFICATION PULL TEST VALVE VALVE TIME B0DY TYPE AND TEST INPUT PRESSURIZATION CYCLED MONITORED ACTUATOR TYPE TEST
=
X 6.00 YES YES YES
. 1" - 1500# PRESSURE ,
t RELIEF VALVE X 6.00 YES YES YES 2" - 1500# PRESSURE l REllEF VALVE :
X 6.0c YES YES YES 4" - 1500# PRESSURE REllEF VALVE
~
- 8" x 10" SAFETY .
X 9.00 .YES YES YES i
RELIEF VALVE WITH I
AIR OPERATOR _
X 6'750 YES N/A N/A
4 i '
I
~
l O
j . . ~
..