Summary of 870203 Meeting W/Mark III Containment Hydrogen Control Owners Group Re CLASIX-3 Computer Code Validation & Emergency Procedure Guidelines.List of Attendees Encl
ML20211M976
Person / Time
Site: Perry, Grand Gulf, River Bend, Clinton, 05000000
Issue date: 02/24/1987
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8702270407
Download: ML20211M976 (5)


Text

.

=- ..

[ 3 Kf Cgo UNITED STATES -

['

7,

.#.c Ig g

t NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 a.,  !

'%,,,,,/ February 24, 1987 Docket Nos. 50-416/417 50-461 50-458 50-440/441 LICENSEES: System Energy Resources, Inc.

Illinois Power Company Gulf States Utilities Cleveland Electric Illuminating Company FACILITIES: Grand Gulf Nuclear Stction, Units 1 and 2 Clinton, Unit 1 River Bend, Unit 1 Perry, Unit 1 and 2

SUBJECT:

SUMMARY

OF FEBRUARY 3, 1987 MEETING WITH MARK III CONTAINMENT HYDROGEN CONTROL OWNERS GROUP (HCOG)

The purpose of the meeting was to discuss HC0G submittals regarding CLASIX-3 computer code validation and emergency procedure guidelines. Enclosure 1 is a list of attendees at the meeting.

The staff requested further consideration in the BWR HEATUP code of the effect of superheated steam, non-equilibrium and irreversible thermodynamics, and modeling of reactor dryers and steam separators on calculated pressure and temperature in the drywell and containment during a degraded core accident.

The staff also requested consideration of the effect of heating due to fission products released inside the containment.

The staff questioned several areas of the HC0G submittals. The basis for using 25 minutes as the time to reach 41 percent hydrogen in the wetwell was questioned in light of the quarter scale test data which showed little variation in hydrogen concentration between the wetwell and containment. Another area discussed was survivability of pressure and temperature instruments if they are inside containment, solenoids for ADS valves, safety relief valves in addition to ADS valves and the stanby liquid control system. The staff questioned

whether the effect of secondary burning on separation of redundant equipment should be considered for areas away from the steam tunnel. Several areas in the emergency procedure guidelines were discussed including, removal of the hydrogen deflagration temperature limit (HDTL) from the procedures, use of "best estimate" calculations for turning igniters c.ff, use of the backup purge system and use of venting when there is no threat to containment. Staff requested that HC0G provide guidance to utilities regarding the selection of vent paths taking into consideration potential combustion outside of containment.

HCOG representatives said that quarter scale tests are scheduled to be completed in March 1987.

G702270407 870224 PDR ADOCK 05000416 P PDR

, ~ - - --- ... -. . - - . -

e . ., .

HCOG will consider the staff questions and comments raised in this meeting in an HCOG internal meeting March 5 and 6, 1987. Submittals will be revised as necessary following the March meeting.

odstadaisnedby Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing Enclosure (s):

As stated cc: See next page DISTRIBUTION

~ N NRC PDR LPDR PD#4 Reading WButler LKintner/BSiegel Junda M0'Brien Young, OGC EJordan BGrimes ACRS(10) t

/PM' LKintner:ca PD#4/D WButler ~]

0 ' /2A/87 g /gtg/87

, tir. Oliver D. Kingsley, Jr.

System Energy Resources, Inc. Grand Gulf Nuclear Station (GGNS) cc:

Mr. Ted H. Cloninger Mr. C. R. Hutchinson Vice President, Nuclear Encineering GGNS General Manager and Support System Energy Resources, Inc.

System Energy Resources, Inc. Post Office Box 756 Post Office Box 23054 Port Gibson, Mississippi 39150 Jackson, Mississippi 39205 Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General F.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Raton Rouge, Louisiana 70804 Nicholas S. Reynolds, Esquire Bishop Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W. Jackson, Mississippi 39201 Washington, D. C. 20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Utilities System Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Divisien of Solid Waste Management Mississippi Department of Natural Mr. John G. Cesare Resources Director, Nuclear Licensing and Safety Bureau of Pollution Control System Energy Resources, Inc. Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 .

Alton B. Cobb, M.D.

. Mr. R. W. Jackson, Project Engineer State Health Officer

! Bechtel Power Corporation State Board of Health 1 15740 Shady Grove Road P.O. Box 1700

, Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Comission Port Gibson, Mississippi 39150 '

Route 2. Box 399 Port Gibson, Mississippi 39150 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. James E. Cross GGNS Site Director System Energy Resources, Inc.

I P.O. Box 756 l Port Gibson, Mississippi 39150 l

l

Enclosure 1 ATTENDEES February 3, 1987 Meeting NRC-HCOG Name Affiliation L..L. Kintner NRC/NRR/ DBL /BWD-4 A. Notafrancesco NRC/NRR/ DBL /PSB

'l Jack Kudrick NRC/NRR/ DBL /PSB Bob Evans Enercon Services i

Randy Langley Gulf States Utilities /HCOG D. D. Yue NRC/NRR/ DBL /RSB George Thomas NRC/NRR/ DBL /RSB i Matthew Rager Enercon Services Juan Unda NRC/NRR/BWR-4 i Dean Houston NRC/ACRS Staff -

I l

l l

i l

i

2-HCOG will consider the staff questions and coments raised in this meeting in an HC0G internal meeting March 5 and 6, 1987. Submittals will be revised as necessary following the March meeting.

Lester L. Kintner, Project Manager BWR Project Directorate No. 4 Division of BWR Licensing Enclosure (s):

As stated cc: See next page 4