Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000341/202400214 August 2024Integrated Inspection Report 05000341/2024002Packing leak
High Radiation Area
Ultimate heat sink
Stroke time
Water Inventory Control
Hydrostatic
Past operability
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Pressure and Temperature Limits Report
Foreign Material Exclusion
Operability Determination
Moisture barrier
License Renewal
Liquid penetrant
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Overexposure
ML24199A21825 July 2024Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016)
ML24169A40918 July 2024Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld ExaminationHydrostatic
Incorporated by reference
Aging Management
License Renewal
Power Uprate
IR 05000341/20243029 July 2024NRC Initial License Reexamination Report 05000341/2024302Job Performance Measure
ML24173A10114 June 2024Retake Exam Post-Exam Cover Letter & Comments
ML24155A08511 June 2024Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024
ML24151A6483 June 2024Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities
IR 05000341/202440230 May 2024Security Baseline Inspection Report 05000341/2024402
ML24143A18529 May 2024– Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0Internal Flooding
Probabilistic Risk Assessment
Open Phase Condition
ML24141A20720 May 2024Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection
IR 05000341/20240106 May 2024NRC Inspection Report 05000341/2024010Coatings
Aging Management
Flow Accelerated Corrosion
Feedwater Heater
License Renewal
IR 05000341/202400130 April 2024Integrated Inspection Report 05000341/2024001Packing leak
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Feedwater Heater
Operability Determination
Moisture barrier
License Renewal
Fire Protection Program
Power change
ML24107B13718 April 2024Confirmation of Initial License Reexamination June 2024
ML24101A37311 April 2024Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012Commercial Grade Dedication
Large early release frequency
Commercial Grade
ML24100A8429 April 2024Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013Aging Management
License Renewal
IR 05000341/20234028 April 2024Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public)Cyber Security
Affidavit
IR 05000341/20230045 February 2024Integrated Inspection Report 05000341/2023004
IR 05000341/20230108 December 2023Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010Safe Shutdown
Unanalyzed Condition
Fitness for Duty
Loop seal
Packing leak
Ultimate heat sink
Stroke time
Fire impairment
Locked High Radiation Area
Condition Adverse to Quality
Significance Determination Process
Foreign Material Exclusion
Operability Determination
License Renewal
Fire Protection Program
Fire Watch
Unidentified leakage
ML23310A1498 December 2023Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance RequirementsSafe Shutdown
Surveillance Frequency Control Program
Offsite Circuit
Fire Protection Program
Overspeed trip
ML23341A1858 December 2023Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation
IR 05000016/20230011 December 2023NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1
ML23334A1901 December 2023Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010Aging Management
License Renewal
ML23335A0061 December 2023Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002Non-Destructive Examination
Aging Management
Foreign Material Exclusion
Scaffolding
IR 05000341/20230037 November 2023Integrated Inspection Report 05000341/2023003 and 07200071/2023001Safe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Pressure and Temperature Limits Report
Annual Radioactive Effluent Release Report
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Operability Determination
Earthquake
Commercial Grade
Liquid penetrant
Fire Protection Program
Unidentified leakage
Overspeed trip
ML23297A05130 October 2023Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances)Safe Shutdown
Ultimate heat sink
Tornado Missile
Enforcement Discretion
Probabilistic Risk Assessment
Earthquake
Offsite Circuit
Fire Protection Program
ML23311A34820 October 2023DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892High winds
Grab sample
ML23272A15510 October 2023Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter)
ML23283A0229 October 2023Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval
ML23276B4545 October 2023Cyber Security Inspection Report 05000341/2023402Cyber Security
Affidavit
ML23243A88518 September 2023Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances)Safe Shutdown
Ultimate heat sink
Fire Barrier
Tornado Missile
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Large early release frequency
Earthquake
Maintenance Rule Program
Fire Protection Program
ML23248A2247 September 2023Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer PerformanceProbabilistic Risk Assessment
Exemption Request
ML23223A22429 August 2023Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances)Ultimate heat sink
Enforcement Discretion
Exemption Request
ML23237B43325 August 2023Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFIJob Performance Measure
IR 05000341/202300524 August 2023Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005)License Renewal
ML23229A01217 August 2023Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances)Safe Shutdown
Surveillance Frequency Control Program
Fire Protection Program
Unidentified leakage
IR 05000341/202330116 August 2023NRC Initial License Examination Report 05000341/2023301Job Performance Measure
ML23227A22115 August 2023Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2Surveillance Frequency Control Program
Unidentified leakage
ML23219A1797 August 2023Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2Temporary Modification
Aging Management
Operability Determination
Maintenance Rule Program
ML23216A1874 August 2023Submittal of Relief Request RR-A25 for Extended License PeriodHydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
License Renewal
IR 05000341/20230024 August 2023Integrated Inspection Report 05000341/2023002Safe Shutdown
Packing leak
Ultimate heat sink
Fire Barrier
Commercial Grade Dedication
Internal Flooding
Past operability
Enforcement Discretion
Functionality Assessment
Missed surveillance
Feedwater Heater
Operability Determination
License Renewal
Fire Protection Program
Grace period
ML23206A12726 July 2023NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat SinkUltimate heat sink
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
ML23178A24228 June 2023Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III
IR 05000341/202300128 June 2023Integrated Inspection Report 05000341/2023001High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Past operability
Temporary Modification
Cyber Security
Functionality Assessment
FLEX
High Energy Line Break
Test box
Significance Determination Process
Operability Determination
License Renewal
Fire Protection Program
Grace period
Power change
Overspeed trip
ML23200A25528 June 2023Post-Exam Letter with Comments and Exam Analysis
ML23122A23326 June 2023Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsSafe Shutdown
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
IR 05000341/202201021 June 2023Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010Safe Shutdown
Packing leak
Condition Adverse to Quality
Tornado Generated Missile
Significance Determination Process
Large early release frequency
Earthquake
ML23166A08915 June 2023Operator Licensing Examination Approval Fermi Power Plant, June 2023
ML23158A1338 June 2023Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat SinkUltimate heat sink
Enforcement Discretion
ML23130A10317 May 2023Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency
ML23114A1171 May 2023Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection