 Issue dateTitleTopic
ML20258A28214 September 2020Submittal of Changes to Emergency Plan Implementing ProceduresSafe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Scram Discharge Volume
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
GNRO-2020/00026, 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related28 February 20203 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety RelatedSafe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Scram Discharge Volume
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML16256A32112 September 2016Revision 5 to Emergency Preparedness-Emergency Plan Implementing Procedures, EN-EP-310, Emergency Response Organization Notification System.
ML16200A20313 July 2016Emergency Plan Procedure - Reentry - Safety RelatedEarthquake
ML16195A17412 July 2016Revision 011 to Emergency Plan Procedure 10-S-01-22, Recovery.
ML16123A3462 May 2016Revision 021 to Procedure No. 10-S-01-19, Personnel Injury
ML16125A10325 April 2016Revision 031 to 01-S-10-6, Emergency Response OrganizationHealth Physics Network
ML16068A3782 March 2016Volume 10, Section 02, Revision 018 to 10-S-02-1, ERF Inspection, Inventories, Operability Checks, and Maintenance, Non-Safety RelatedHealth Physics Network
FLEX
Significance Determination Process
ML16028A08127 January 2016Entergy Grand Gulf Unit 1 - Revision 2 to EN-EP-609, Emergency Operations Facility (EOF) OperationsFitness for Duty
Health Physics Network
FLEX
GNRO-2011/00096, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear Station28 October 2011Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear StationSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Internal Flooding
Met Tower
Operating Basis Earthquake
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage
Failure to Scram
ML0903307822 February 2009Emergency Preparedness Procedure 10-S-01-19, Revision 16, Personnel Injury
ML08350024315 December 2008Emergency Preparedness Procedure 10-S-01-12, Revision 39, Radiological Assessment and Protective Action RecommendationsMet Tower
ML08323066518 November 2008Emergency Preparedness Procedure 10-S-01-33, Revision 17, Emergency Operations Facility (EOF) OperationFitness for Duty
Health Physics Network
ML08323065818 November 2008Emergency Preparedness Procedure 10-S-01-34, Revision 15, Public Information and Enmc/Eic Operations
ML08323054018 November 2008Emergency Preparedness Procedure 10-S-01-30, Revision 15, Technical Support Center (TSC) OperationsHealth Physics Network
Emergency Lighting
ML08296053822 October 2008Emergency Preparedness Procedure 01-S-10-3, Revision 15, Emergency Preparedness Department Responsibilities.
ML08296053116 October 2008Revision 4 to Emergency Preparedness Procedure 10-S-01-35, Core Damage Assessment.Fuel cladding
ML0829605409 October 2008Emergency Preparedness Procedure 10-S-01-11, Revision 19, Evacuation of Onsite Personnel.
ML0827701461 October 2008Revision 021 to Emergency Preparedness Procedure 10-S-01-29, Operations Support Center (OSC) OperationsSafe Shutdown
ML0827701471 October 2008Emergency Plan Implementing Procedure, 01-S-10-6, Rev. 21, Emergency Response Organization.
GNRO-2004/00057, Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology19 November 2004Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 MethodologySafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Internal Flooding
Met Tower
Operating Basis Earthquake
Design basis earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage
Failure to Scram
ML04113035921 April 2004Emergency Preparedness Procedure 01-S-10-3, Revision 12Fire Protection Program
Fire Watch
GNRO-2004/00020, Revision 12 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations.10 March 2004Revision 12 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations.Health Physics Network
Emergency Lighting
Fire Protection Program
Fire Watch
GNRO-2004/00015, Changes to Emergency Plan Implementing Procedures - February 12, 200412 February 2004Changes to Emergency Plan Implementing Procedures - February 12, 2004Fitness for Duty
Health Physics Network
Fire Protection Program
Fire Watch
GNRO-2004/00003, Revision 2 to Emergency Plan Procedure 10-S-01-35, Core Damage Assessment, Safety Related.14 January 2004Revision 2 to Emergency Plan Procedure 10-S-01-35, Core Damage Assessment, Safety Related.Fuel cladding
Fire Protection Program
Fire Watch
GNRO-2003/00073, Changes to Emergency Plan Implementing Procedures-December 8, 20038 December 2003Changes to Emergency Plan Implementing Procedures-December 8, 2003Safe Shutdown
Ultimate heat sink
Earthquake
Fire Protection Program
Fire Watch
GNRO-2003/00066, Revision 16 to EPIP-01-S-10-619 November 2003Revision 16 to EPIP-01-S-10-6Fire Protection Program
Fire Watch
GNRO-2003/00052, Changes to Emergency Plan Implementing Procedures - September 18, 200316 September 2003Changes to Emergency Plan Implementing Procedures - September 18, 2003Fitness for Duty
GNRO-2003/00049, Changes to Emergency Plan Implementing Procedures, 01-S-10-3, Rev. 1128 August 2003Changes to Emergency Plan Implementing Procedures, 01-S-10-3, Rev. 11Fire Protection Program
Fire Watch
GNRO-2003/00034, Changes to Emergency Plan Implementing Procedures3 June 2003Changes to Emergency Plan Implementing ProceduresFire Protection Program
GNRO-2003/00020, Changes to Emergency Plan Implementing Procedures - March 17, 2003, Rev. 37 to 10-S-01-06, Rev. 10 to 01-S-10-3, Rev. 17 to 10-S-01-11 and Rev. 2 to TQ-11017 March 2003Changes to Emergency Plan Implementing Procedures - March 17, 2003, Rev. 37 to 10-S-01-06, Rev. 10 to 01-S-10-3, Rev. 17 to 10-S-01-11 and Rev. 2 to TQ-110Fitness for Duty
Health Physics Network
Fire Protection Program
GNRO-2003/00014, Transmittal of Changes to Grand Gulf Nuclear Station Emergency Plan Implementing Procedures. Includes 10-S-01-29, Rev. 19 & 10-S-01-17, Rev. 128 February 2003Transmittal of Changes to Grand Gulf Nuclear Station Emergency Plan Implementing Procedures. Includes 10-S-01-29, Rev. 19 & 10-S-01-17, Rev. 1Safe Shutdown
GNRO-2002/00097, Changes to Emergency Plan Implementing Procedures - December 20025 December 2002Changes to Emergency Plan Implementing Procedures - December 2002Met Tower
GNRO-2002/00081, Transmittal of Grand Gulf Emergency Plan Implementing Procedure, 01-S-10-5, Revision 711 September 2002Transmittal of Grand Gulf Emergency Plan Implementing Procedure, 01-S-10-5, Revision 7Fitness for Duty
Health Physics Network
GNRO-2002/00068, Changes to Emergency Plan Implementing Procedures, Rev. 109 10-S-01-112 August 2002Changes to Emergency Plan Implementing Procedures, Rev. 109 10-S-01-1Safe Shutdown
Safe Shutdown Earthquake
Earthquake
ML02060029828 February 2002Changes to Emergency Plan Implementing Procedures, 10-S-01-19, Rev 13
ML02029032128 January 2002Changes to Emergency Plan Implementing Procedures - January 28, 2002
ML01268042320 September 2001Changes to Emergency Plan Implementing Procedures - September 20, 2001, Revision 11 to 10-S-01-20 and Revision 17 to 10-S-01-29Safe Shutdown
GNRO-2001/00053, Changes to Emergency Plan Implementing Procedures - July 6, 20016 July 2001Changes to Emergency Plan Implementing Procedures - July 6, 2001
GNRO-2001/00030, Revised Epips,Including Revision 14 to 01-S-10-6,Rev 28 to 10-S-01-12,Rev 12 to 10-S-01-34 & Rev 10 to 10-S-01-20 to Plant Operations Manual Volume 01 Section 1013 April 2001Revised Epips,Including Revision 14 to 01-S-10-6,Rev 28 to 10-S-01-12,Rev 12 to 10-S-01-34 & Rev 10 to 10-S-01-20 to Plant Operations Manual Volume 01 Section 10Met Tower
GNRO-2001/00019, Changes to Emergency Plan Implementing Procedures7 March 2001Changes to Emergency Plan Implementing ProceduresSafe Shutdown
Fitness for Duty
Health Physics Network
Safe Shutdown Earthquake
Met Tower
Earthquake
Fuel cladding