ML20258A282 | 14 September 2020 | Submittal of Changes to Emergency Plan Implementing Procedures | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Scram Discharge Volume Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
GNRO-2020/00026, 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related | 28 February 2020 | 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Stroke time Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action FLEX Scram Discharge Volume Earthquake Fuel cladding Pressure Boundary Leakage Grace period |
ML16256A321 | 12 September 2016 | Revision 5 to Emergency Preparedness-Emergency Plan Implementing Procedures, EN-EP-310, Emergency Response Organization Notification System. | |
ML16200A203 | 13 July 2016 | Emergency Plan Procedure - Reentry - Safety Related | Earthquake |
ML16195A174 | 12 July 2016 | Revision 011 to Emergency Plan Procedure 10-S-01-22, Recovery. | |
ML16123A346 | 2 May 2016 | Revision 021 to Procedure No. 10-S-01-19, Personnel Injury | |
ML16125A103 | 25 April 2016 | Revision 031 to 01-S-10-6, Emergency Response Organization | Health Physics Network |
ML16068A378 | 2 March 2016 | Volume 10, Section 02, Revision 018 to 10-S-02-1, ERF Inspection, Inventories, Operability Checks, and Maintenance, Non-Safety Related | Health Physics Network FLEX Significance Determination Process |
ML16028A081 | 27 January 2016 | Entergy Grand Gulf Unit 1 - Revision 2 to EN-EP-609, Emergency Operations Facility (EOF) Operations | Fitness for Duty Health Physics Network FLEX |
GNRO-2011/00096, Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear Station | 28 October 2011 | Proposed Emergency Action Levels Using NEI 99-01 Revision 5 Scheme Grand Gulf Nuclear Station | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Internal Flooding Met Tower Operating Basis Earthquake Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Unidentified leakage Failure to Scram |
ML090330782 | 2 February 2009 | Emergency Preparedness Procedure 10-S-01-19, Revision 16, Personnel Injury | |
ML083500243 | 15 December 2008 | Emergency Preparedness Procedure 10-S-01-12, Revision 39, Radiological Assessment and Protective Action Recommendations | Met Tower |
ML083230665 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-33, Revision 17, Emergency Operations Facility (EOF) Operation | Fitness for Duty Health Physics Network |
ML083230658 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-34, Revision 15, Public Information and Enmc/Eic Operations | |
ML083230540 | 18 November 2008 | Emergency Preparedness Procedure 10-S-01-30, Revision 15, Technical Support Center (TSC) Operations | Health Physics Network Emergency Lighting |
ML082960538 | 22 October 2008 | Emergency Preparedness Procedure 01-S-10-3, Revision 15, Emergency Preparedness Department Responsibilities. | |
ML082960531 | 16 October 2008 | Revision 4 to Emergency Preparedness Procedure 10-S-01-35, Core Damage Assessment. | Fuel cladding |
ML082960540 | 9 October 2008 | Emergency Preparedness Procedure 10-S-01-11, Revision 19, Evacuation of Onsite Personnel. | |
ML082770146 | 1 October 2008 | Revision 021 to Emergency Preparedness Procedure 10-S-01-29, Operations Support Center (OSC) Operations | Safe Shutdown |
ML082770147 | 1 October 2008 | Emergency Plan Implementing Procedure, 01-S-10-6, Rev. 21, Emergency Response Organization. | |
GNRO-2004/00057, Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology | 19 November 2004 | Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Internal Flooding Met Tower Operating Basis Earthquake Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Unidentified leakage Failure to Scram |
ML041130359 | 21 April 2004 | Emergency Preparedness Procedure 01-S-10-3, Revision 12 | Fire Protection Program Fire Watch |
GNRO-2004/00020, Revision 12 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations. | 10 March 2004 | Revision 12 to EPIP 10-S-01-30, Technical Support Center (TSC) Operations. | Health Physics Network Emergency Lighting Fire Protection Program Fire Watch |
GNRO-2004/00015, Changes to Emergency Plan Implementing Procedures - February 12, 2004 | 12 February 2004 | Changes to Emergency Plan Implementing Procedures - February 12, 2004 | Fitness for Duty Health Physics Network Fire Protection Program Fire Watch |
GNRO-2004/00003, Revision 2 to Emergency Plan Procedure 10-S-01-35, Core Damage Assessment, Safety Related. | 14 January 2004 | Revision 2 to Emergency Plan Procedure 10-S-01-35, Core Damage Assessment, Safety Related. | Fuel cladding Fire Protection Program Fire Watch |
GNRO-2003/00073, Changes to Emergency Plan Implementing Procedures-December 8, 2003 | 8 December 2003 | Changes to Emergency Plan Implementing Procedures-December 8, 2003 | Safe Shutdown Ultimate heat sink Earthquake Fire Protection Program Fire Watch |
GNRO-2003/00066, Revision 16 to EPIP-01-S-10-6 | 19 November 2003 | Revision 16 to EPIP-01-S-10-6 | Fire Protection Program Fire Watch |
GNRO-2003/00052, Changes to Emergency Plan Implementing Procedures - September 18, 2003 | 16 September 2003 | Changes to Emergency Plan Implementing Procedures - September 18, 2003 | Fitness for Duty |
GNRO-2003/00049, Changes to Emergency Plan Implementing Procedures, 01-S-10-3, Rev. 11 | 28 August 2003 | Changes to Emergency Plan Implementing Procedures, 01-S-10-3, Rev. 11 | Fire Protection Program Fire Watch |
GNRO-2003/00034, Changes to Emergency Plan Implementing Procedures | 3 June 2003 | Changes to Emergency Plan Implementing Procedures | Fire Protection Program |
GNRO-2003/00020, Changes to Emergency Plan Implementing Procedures - March 17, 2003, Rev. 37 to 10-S-01-06, Rev. 10 to 01-S-10-3, Rev. 17 to 10-S-01-11 and Rev. 2 to TQ-110 | 17 March 2003 | Changes to Emergency Plan Implementing Procedures - March 17, 2003, Rev. 37 to 10-S-01-06, Rev. 10 to 01-S-10-3, Rev. 17 to 10-S-01-11 and Rev. 2 to TQ-110 | Fitness for Duty Health Physics Network Fire Protection Program |
GNRO-2003/00014, Transmittal of Changes to Grand Gulf Nuclear Station Emergency Plan Implementing Procedures. Includes 10-S-01-29, Rev. 19 & 10-S-01-17, Rev. 1 | 28 February 2003 | Transmittal of Changes to Grand Gulf Nuclear Station Emergency Plan Implementing Procedures. Includes 10-S-01-29, Rev. 19 & 10-S-01-17, Rev. 1 | Safe Shutdown |
GNRO-2002/00097, Changes to Emergency Plan Implementing Procedures - December 2002 | 5 December 2002 | Changes to Emergency Plan Implementing Procedures - December 2002 | Met Tower |
GNRO-2002/00081, Transmittal of Grand Gulf Emergency Plan Implementing Procedure, 01-S-10-5, Revision 7 | 11 September 2002 | Transmittal of Grand Gulf Emergency Plan Implementing Procedure, 01-S-10-5, Revision 7 | Fitness for Duty Health Physics Network |
GNRO-2002/00068, Changes to Emergency Plan Implementing Procedures, Rev. 109 10-S-01-1 | 12 August 2002 | Changes to Emergency Plan Implementing Procedures, Rev. 109 10-S-01-1 | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML020600298 | 28 February 2002 | Changes to Emergency Plan Implementing Procedures, 10-S-01-19, Rev 13 | |
ML020290321 | 28 January 2002 | Changes to Emergency Plan Implementing Procedures - January 28, 2002 | |
ML012680423 | 20 September 2001 | Changes to Emergency Plan Implementing Procedures - September 20, 2001, Revision 11 to 10-S-01-20 and Revision 17 to 10-S-01-29 | Safe Shutdown |
GNRO-2001/00053, Changes to Emergency Plan Implementing Procedures - July 6, 2001 | 6 July 2001 | Changes to Emergency Plan Implementing Procedures - July 6, 2001 | |
GNRO-2001/00030, Revised Epips,Including Revision 14 to 01-S-10-6,Rev 28 to 10-S-01-12,Rev 12 to 10-S-01-34 & Rev 10 to 10-S-01-20 to Plant Operations Manual Volume 01 Section 10 | 13 April 2001 | Revised Epips,Including Revision 14 to 01-S-10-6,Rev 28 to 10-S-01-12,Rev 12 to 10-S-01-34 & Rev 10 to 10-S-01-20 to Plant Operations Manual Volume 01 Section 10 | Met Tower |
GNRO-2001/00019, Changes to Emergency Plan Implementing Procedures | 7 March 2001 | Changes to Emergency Plan Implementing Procedures | Safe Shutdown Fitness for Duty Health Physics Network Safe Shutdown Earthquake Met Tower Earthquake Fuel cladding |