GNRO-2003/00034, Changes to Emergency Plan Implementing Procedures

From kanterella
Jump to navigation Jump to search
Changes to Emergency Plan Implementing Procedures
ML031681406
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 06/03/2003
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2003/00034 10-S-01-11, Rev 18, 10-S-01-18, Rev 7
Download: ML031681406 (35)


Text

'

Entergy Entergy Operations, Inc.

Waterloo Road P.O. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Charles A. Bottemiller Manager Plant Ucensing June 3, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Changes to Emergency Plan Implementing Procedures - June 3, 2003 Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 GNRO-2003/00034 Ladies & Gentlemen:

Entergy Operations, Inc. submits in accordance with 10CFR50 Appendix E, Section V changes to the following Emergency Plan Implementing Procedure:

10-S-01-11, Rev. 18 10-S-01 -18, Rev. 7 This letter does not contain any commitments.

Yours truly, Charles A. Bottemiller, Licensing Manager MJL attachment:

1. Procedure 10-S-01-11
2. Procedure 10-S-01-18 cc: (See Next Page) cfty-

NOL5

June 3, 2003 GNRO-2003/00034 Page 2 of 2 cc:

Hoeg T. L.

(GGNS Senior Resident)

(w/a)

Levanway D. E.

(Wise Carter)

(w/a)

Reynolds N. S.

(w/a)

Smith L. J.

(Wise Carter)

(wla)

Thomas H. L.

(w/o)

U.S. Nuclear Regulatory Commission ALL LETTERS ATTN: Mr. E. W. Merschoff (w/2) 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission ALL LETTERS - U.S.

ATTN: Mr. Bhalchandra Vaidya, NRRIDLPM (w/2)

POSTAL SERVICE MAIL ATTN: FOR ADDRESSEE ONLY DELIVERY ADDRESS ATTN: U.S. Postal Delivery Address Only ONLY Mail Stop OWFN/7D-1 Washington, D.C. 20555-0001

PLA2IT OEIRATIONS AQL Volume 10 Section 01 10-S-01-11 Revision:

18 Date:5/27/03 EMERGENCY PLAN PROCEDURE EVACUATION OF ONSITE PERSONNEL Prepared:

A Reviewed:

L Te -?ita Concurred:

OSRC:

t Approved:

4c

/

Z 7

lant General Manager Mana?4 4A -.

ager, Emergency Preparedness List of Effective Pages:

Pages 1-11 Attachments I, II List of TCNs Incorporated:

Revision

=N 1-18 None J:ADM_SRVS\\TECH-PUB\\REVISION\\lOSO111.DOC

Title:

Evacuation of Onsite No.:

lO-S-O1-11 Revision:

18 Safety Personnel Evaluation

1. OVERVIEW / SIGNATURES Fadlity: GONS Document Reviewed: 10-S0-l I Change/Rev. 18 System Designator(s)/Description: N/A escri2tion of Proosged hanier Revision 18 is to clarify portions of the procedure. This is to address comments received in EPTS 6 training as identified in EPATS 1897.

Grammatical changes.

Revises 6.1.2.a.1 to clearly indicate that that the ED notifies Security to begin the accountability process identified in Section 6.2.1.

Revises 6.3.1.a.1 to cloarly indicate that the ED notifies Security to begin the accountability process.

Moves 6.1.2.b.4 concerning emergency response personnel actions to Section 6.1.3, Personnel Response In the Protected Area.

Deletes exceptions from 6.1.3 title and incorporates them into 6.1.3.a.4.

Moves 6.2.1.a.3 to 6.1.3.a.l.a for clarity Moves portions of 6.2.1.a to 6.1.3.a.3 for clarity Combines several sentences into 6.1.3.a.4 and 6.1.3.a.5 to clearly indicate expected actions for each group of personnel responding to a Site Evacuation Rewords 6.2.1.a to indicate that personnel follow the actions outlined in 6.1.3, Personnel Response In The Protected Area.

To promote consistency between OSC field teams and Control Room field teams during Site Evacuation and Limited Evacuation, copies the Shift Manager's actions in 6.2.2.c to 6.2.1.c ( provides CAS with the names and badge numbers of Control Room personnel in the field who cannot log into an accountability card reader).

If the proposed activity, in Its entirety, involves any one of the crlteria

below, check the appropriate box, provide a ustification/basis in the Description above, and fozward to a Reviewer.

No furter 50.59 Review is recluired.

If none of the criteria is applicable, continue with the 50.59 Review.

O The proposed activity Is editorlalypographical as defined In Section 52.2.1.

O Tho proposod actMty represents an FSAR-only change as allowed In Soction 5.2.2.2

. (Inert item # from Section 522.2).

O The proposed actMty Is controlled by another regulation per Sectlon 52.2.3.

J:ADM_SRVS\\TECH-PUB\\REVISION\\lOSO111.DOC EMERGENCY PAN PROCEDURE GRANsM GUL F NCIEAR STATION

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Safety I

Personnel I

I Evaluation If further 50.59 Review is required, check the applicable review(s):

(Only the sections Indicated must be cluded n the Review.)

Richard Sumrall /

i

/ EO I EP / 5-15-2003 Name (print)

Signature / Company / Department / Date

?.;fIwj VAfe,&, f Ake(r,k2ZJ'2.

/

5-/ f PZo 3

Name (print) / Signa*ia

/( Company/

nparfment / Date iVAft Chairman's Name (print) / Signature / Date (Rcquired only for Programatic Mxcluaion Sreoningi (f

Rction 5.8) and 50.59 Evaluations.)

List of AsstWingContributing Personnel:

Kame:

Scope of Assistances Larry Durden Review of Security Plan J:ADMLSRVS\\TECH_PUB\\REVISION\\10SO111.DOC (El SCREENING Sections 1, II, and m required O

50.59 EVALUATION EXEMPTION Sections I, U, m, and IV required o

S0.59 EvAWATION (#: _

Sections L U, III, and V required Preparers Reviewer:

OSRCt GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Safety r

Personnel I

lEvaluation I.

SCREENING A. Licensing Basis Document Review

1.

Does the proposed activity Impact the facility or a procedure as described In any of the following Ucensing Basis Documents? (Check "WA" for those documents that are not applicable to the facility.)

Operadng License YI ND N/A CH"GE I andor SEC7TONS MPACTED operating License El TS NRC Orders O

IE O

n "YES", obtaln NRC approval prior to knplementlng the change. (See Section 5.1.13 for exceptions.)

LBDs conakled wurS0.59 IRS so W/A CHANGE J (f appliable) andlor SECTIONS LMPACTED FSAR 0

IS TS Bases a3 El Tioeabical RequiromPntfl Manual n]

E Core Operating Limits Report O]

Offaite Dose Calculations Manual O

El NRC Safety Evaluation Reports1 0

El n 'YES", perform an Exemption Review per Section IV Q2 perform a 50.59 Evaluation per Section V.

LIDs controUed wider other S

no N/A CHANGE # (f applicable) andlor SEC1tONS IMPACTED Quality Assurance Program anual2 0

E Emergency Plan' a

E Security Plan 3 O

E Fire Protection Program4 0

I81 O (includes the Fire Hazards Analysis)

I fYES", evaluateprocess any changes In accordance wih the appropriate regulaUon.

2.

Does the proposed activity Involve a test or experiment not described In the FSAR?

If "'yes," perform an Exemption Review per Section IV OR perform a 50.59 Evaluation per Section V.

3.

Does the proposed actMvty potentially Impact equipment, procedures, or facilitles utilized for storing spent fuel at an Independent Spent Fuel Storage Installation?

(Check 'WA" If dry fuel storage Is not applicable to the facility.)

If "yes," perform a 72.48 Review In accordance with NMM Procoduro LI-I 12.

(See Sections 1.5 and 5.3.1.5 of the EOI 10CFR50.59 Review Program Guldelines.)

O Yes 1E No a

'rem O

No MiI WA 1 If

'YES, seeSection 5.t.5.

2 YES,' noIfy ee responsible department nd ensure a 50.54 Evaluation is perforned.

3 The Security Plan Is dassHed as safeguards and can only be reviewed by personnel wfth the appropriate secuity dearne. The Preparer shoud noUfy the security departnent of potenial changes b the Security Plan.

4 fYES, evaluate the change In acoordance wih te reqirements d the acltys Operatng Luenso ConcitorL J:ADMLSRVS\\TECH-PUB\\REVISION\\10SO111.DOC GRAND GULF NUCLEAR STATION EMERGENCY PAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Safety I

Personnel I

Evaluation B.

Basis (Provide a clear, concise baals for the anwers given in the applicable sections above. Adequate basis must be provided within the Screening such that a third-party reviewer can reach the same conclusions. Simply stating that the change does not affect TS or the FSAR is not an acceptable basis.)

Performed a keyword search of the on-line Emeraency Plan. UFSAR. Tech Specs. TRM. Onerating License. NRC Orders. COLR.

ODCM. Fire Protection Proaram, and SERs for the keywords 'accountability'. 'site evacuation.

'evacuation'.

Reviewed all hits returned. Performed a manual search of the online OAPM. No changes in this rocedure affect the documents above.

The GGNS Emeraencv Plan describes evacuation of the Site and areas offsite.

This rocedure does not address evacuation of offsite areas.

Emeraencv Plan section 6.5.1 describes general reauirements for Site Evacuation and some secific detailed cuidance. The chanaes in this trocedure remain consistent with section 6.5.1 of the Emeraencv Plan, some reauirements are relocated to other ortions of the procedure to enhance clarity.

Section 7.7 of the Emergency Plan addresses some aspects of

'accountability'.

The reauirements in the rocedure remain consistent with section 7.7 of the Emeraencv Plan.

This chanae does not represent a chanae to any of the LBDs listed above or ny system. structure, or component described in the FSAR.

C. References

[Discuss the methodology for performing the LBD search.

State the location of relevant licensing document information and explain the scope of the review such as electronic search criteria used (e.g., key words) or the general extent of manual searches per Section 5.3.6.4 of LI-lOl.1 LBDs/Documents Reviewed:

Keywords:

OAPM. Emeraencv Plan. UFSAR. Tech

'accountabilitv'. 'site evacuation'.

Specs. TRM. Oeratina License, NRC

'evacuationW Orders. COLR. ODCM, Fire Protection Program, and SERs D. Xs the validity of this Review dependent on O

Yes any other change?

(See Section 5.3.4 of the EOI E

No lOcrx5o.59 Program Revlew Guldellnes.)

If "Yes," list the required changes.

N/A J:ADICSRVS\\TECH.PUB\\REVISION\\1OSOl1l.DOC GRAND GULF NUCLEAR TATION TMERGENCY PLAN rocEDw n

Title:

Evacuation of Onsite No.:

10-S-O1-11 Revision:

18 Safety I

Personnel I

I lEvaluation II.

  • mvZRONMENTIL SCREENING If any of the following questions is answered yes,' n Enviromental Review must be performed in accordance with XMM Procedure V-115, Environ=ental Evaluations, and attached to this 50.59 Review.

Will the proposed Change being evaluated:

x=

NoQ O

X Involve a land disturbance of previously disturbed land areas in excess of one acre i.e., grading activities, construction of buildings, excavations, reforestation, creation or removal of ponds)?

O X

Involve a land disturbance of undisturbed land areas (i.e., grading activities, construction, excavations, reforestation, creating, or removing ponds)?

O X

Involve dredging activities in a lake, river, pond, or stream?

O X

Increase the amount of thermal heat being discharged to the river or lake?

O X

Increase the concentration or quantity of chemicals being discharged to the river, lake, or air?

O X

Discharge any chemicals new or different from that previously dischargcd?

O X

Change the design or operation of the intake or discharge structures?

a C

Modify the design or operation of the cooling tower that will change water or air flow characteristics?

O E

Modify the design or operation of tho plant that will change the path of an existing water discharge or that will result in a new water discharge?

O X

Modify existing stationary fuel burning equipment (i.e., diesel fuel oil, butane, gasoline, propane, and kerosene)?l o

W Involve the installation of stationary fuel burning equipment or use Or portable fuel burning equipment (i.e., dicool fuel oil, butane, gasoline, propane, and kerosene)?"

O C

Involve the installation or use of equipment that will result in an air emission dselu+/-yet?

O E

Involve the installation or modification of a stationary or mobile tank?

O 0

Involve the use or storage of oils or chemicals?

D 0

Involve buriAl or placement of any solid wastes in the site area that may effect runoff, surface water, or groundwater?

1SeeNMMPcedureEV-117. AJrEmssionsManagement Pgram,-trgumoe akaswerng iis qusin.

J:ADMLSRVS\\TECH.PUB\\REVISION\\10SO111.DOC GRAND GULF NUCLEAR STATION EMESRGENCY PAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Emergency I

Personnel Plan l

I I

I Evaluation l

10CFR50.54(a) Screenina

1.

DOCUM INFORMATSON Procedure/Document Number: 10-S-01-11 Proc./Doc. Revision: 18 Document

Title:

Evacuation of Onsite Personnel Brief Description of Proposed Revision:

Revision 18 is to clarify portions of the procedure. This is to address comments received in KPTS 6 trainina as identified in EPATS 1897.

Grammatical changes.

Revises 6.1.2.a.1 to clearly indicate that that the ED notifies Security to begin the accountability process identified in Section 6.2.1.

Revises 6.3.1.a.1 to clearly indicate that the ED notifies Security to begin the accountability process.

Moves 6.1.2.b.4 concerning emergency response personnel actions to Section 6.1.3, Personnel esponse n the Protected ALt.

Deletes exceptions from 6.1.3 title and incorporates them into 6.1.3.a.4.

Moves 6.2.1.a.3 to 6.1.3.a.l.a for clarity Moves portioimi of 6.2.1.a to

.1.3.a.3 for clarity Combines several sentences into 6.1.3.a.4 and 6.1.3.a.5 to clearly indicate expected actions for each group of personnel responding to a Site Evacuation Rewords 6.2.1.a to indicate that personnel follow the actions outlined in 6.1.3, Personnel Response In The Protected Area.

To promote consistency between OSC field teams and Control Room field teams during Site Evacuation and Limited Evacuation, copies the Shift Manager's actions in 6.2.2.c to

.2.l.c ( provides CAS with the names aLid badye niumber.

of Control Room personnel in the field who cannot log into an accountability card reader).

anA some secific detailed uidance.

A.) Does the proposed revision require a change to the Emergency Plan?

Yes so The GGNS Eeraencv Plan describes evacuation of the Site and areas offsite.

This procedure does not address evacuation of offsite areas.

Emergencv Plan section 6.5.1 describes eneral recuirements for Site Evacuation The chanoes_in this orocedure remain consistent with section 6.5.1 of the Emeraencv Plan. some reauirements are relocated to other Dortions of the procedure to enhance clarity.

Section 7.7 of the Emercency Plan addresses some aspects of 'accountability,.

The reauirements in the procedure remain consistent with section 7.7 of the Emerrencv Plan.

B.) Does the proposed revision change the site Emergency Action Levels EALs)?

_yes_ J No Xf the answer to either question i YES, then a 50.54(q) evaluation =ust be verfom=ed.

See attachment 9.2.

3.

APPROVAL Screening Completed By:

IA

- u E

3/26/2003 SIGNAtURE DATE Screening Reviewed By:

K6,1 t. F. 6 t

I-Ldo 5 V

SIGINATURE DATE J:ADM_SRVS\\TECI_PUB\\REVISION\\1OS0111.DOC

2.

SCRENING GRAND GULF NUCLEAR STATION EMERGENCY LAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-Ol-11 Revision:

18 Page:

i Personnel RPTS FR 11OCFR50.59_Review Required?

(X) Yes If Yes, attach 50.59 Review Form I ) o INot re ired er LI-101 Cross-Discipline review required?

(X) Yes (Note affected Departments Below)

Preparer nitials>>>

Department Cross-Discipline Reviews Needed Signoff Isigned tronic, telcon)

Operations Emerency Director Position Lead TSC Coordinator Position Lead security Ao A -V_3 F-

.7 Does this directive contain Tech Spec Triggers? ( ) YES X) NO REQUIPLEN1TS CROSS-REFERENCE LIST Requirement Implemented by Directive IDirective Paragraph Number Name IParacraph Number IThat Implements Reouirement Reg.

GGNS GONS GGNS GGNS GGNS GGNS GGNS GGNS GGNS GGNS Guide 1.95 Emer Plan Emer Plan Emer Plan ELWL PludLi Emer Plan Emer Plan Emer Plan Emer Plan Emer Plan Emer Plan UGNS Lzner vian GONS Emer Plan GNRO-97/00113 GGNS Emer Plan C.6.S5 6.7.2.S9

6. 6.S1 6.7.2.S5 6.5.1.i.1 6.5.1.a.3 6.5.1.a.4 7.7.S5 6.6. S3 6.6.S2,S4 6.5.1.a.2 6.5.1.a.5.Sl 6.5.1.a.6 97-15-02.Item 1 & 3 6.5.1.a.5.S2 6.4.4 6.4.1 6.4.2 6.1.2.b, 6.1.2.c 6.1.2.d(2) 6.1.2.d(3) 6.4.1, 6.4 Note 6.4 6.1.3.a(3),

6.1.3.b(l), 6.2.1, 6.2.2, 6.3.1 6.1.3.c 6.1.1.a, 6.1.1.a Warning 6.1.5 6.1.2.b.3(a)

  • Covered by directive as a whole or by various paragraphs of the directive.

J:ADK_SRVS\\TECI-PUB\\REVISION\\10SO111. DOC Component Database Change Request generated and the backup documentation available for setpoint and/or calibration data only O Yes I N/A CDBCR t

-. -L GRAND GLnF NUCLvEAR STATION EMERGENCY PAN PROCEDURE wrn, _QV_frPnstinn Lead Sc m

I

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

ii Personnel Current Revision Statement Revision 18:

Revision 18 is to clarify portions of the procedure. This is to address comments received in EPTS 6 training as identified in EPATS 1897.

Grammatical changes.

Revises 6.1.2.a.1 to clearly indicate that that the ED notifies Security to begin the accountability process identified in Section 6.2.1.

Revises 63.1.a.1 to clearly indicate that the ED notifies ecurity to begin te accountability process.

Moves 6.1.2.b.4 concerning emergency response personnel actions to Section 6.1.3, Personnel Response In the Protected Area.

Deletes exceptions from 6.1.3 title and incorporates them into 6.1.3.a.4.

Moves 6.2.1.a.3 to 6.1.3.a.l.a for clarity Moves portions of 6.2.1.a to 6.1.3.a.3 for clarity Combines several sentences into 6.1.3.a.4 and 6.1.3.a.5 to clearly indicate expected actions for each group of personnel responding to a Site Evacuation Rewords 6.2.1.a to indicate that personnel follow the actions outlined in 6.1.3, Personnel Response In The Protected Area.

Tn promote consistency between OSC field teams and Control Room field teams during Site Evacuation and Limited Evacuation, copies the Shift Manager's actions in 6.2.2.c to 6.2.1.c ( provides CAS with the names and badge numbers of Control Room personnel in the field who cannot log into an accountability card reader).

J:ADM_SRVS\\TECH_PUB\\REVISION\\10S0111.DOC GRAND GF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

1 Personnel TABLE OF CON~TENTS Pr 1.0 PURPOSE 2

2.0 RESPONSIDILITIES 3.0 REFERENCE 2

4.0 ATTACHMENTS 3

5.0 DEFINITIONS 3

6.0 DETAILS 4

6.1 Site Evacuation 4

6.1.2 IluerlIaLe Actions {Control Room) 5 6.1.3 Personnel Response in the Protected Area 6

6.1.4 Personnel Response outside the Protected Area 7

6.1.5 Security Personnel Response 7

b.l.6 Follow-up Actions (Emergency Director) 0 6.2 Accountability 8

6.2.1 Personnel Accountability within the Protected Area with a Site Evacuation 8

6.2.2 Personnel Accountability within the Protected Area without a Site Evacuation 9

6.3 Limited Evacuation 10 6.4 Evacuating Personnel Survey and Decontamination 11 J:AD_SRVS\\TECH-PUB\\REVISION\\lOS0111.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-Ol-11 Revision:

18 Page: 2 Personnel 1.0 PURPOSE 1.1 This procedure describes actions to take for two types of evacuations:

1.1.1 Site Evacuation 1.1.2 Limited Evacuation 1.2 This procedure also describes actions to be taken to ensure personnel accountability within the protected area.

2.0 RESPONSIBILITIES 2.1 Shift Manacer/Emeraencv Director -

Is responsible for:

2.1.1 Determining whether or not evacuation is necessary and the extent of the evacuation.

2.1.2 Implementation of this procedure when emergency conditions require protection for percons located in the Emergency Preparednecs Owner Controlled Area (Attachment II) including the Protected Area.

2.1.3 Ensuring that periodic announcements are made over the Plant PA and the Site Paging System (7929),

until all evacuation actions are complete, concerning:

a.

Nature and location of the event

b.

Required personnel actions

c.

Any other information pertinent to the event.

2.1.4 Ensuring that CAS and/or SAS is advised of an evacuation.

2.1.5 Providing instructions to Radiation Protection personnel cuuLceililng nua-eutergency personrel who hve evacuated to the Radiation Protection area of the 93' level of the Control Building, during a Limited Evacuation or reported for accountability during personnel accountability without an evacuation.

2.1.6 Initiating actions to locate individuals not accounted for.

2.2 ecurity coordinator -

s responsible for:

2.2.1 Personnel accountability in the Protected Area, personnel and traffic control once an evacuation has been initiated.

2.2.2 Performing checks of all buildings, outlying and laydown areas in the Emergency Preparedness Owner Controlled Area (Attachment II),

to ensure evacuation, after a site evacuation has been ordered.

3.0 REFERENCES

3.1 GGNS Emergency Plan 3.2 Security Section Procedure l1-S-11-6, Security Response During Operating Emergencies J:ADM_SRVS\\TECH_PUB\\REVISION\\lOSOlll.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page: 3 Personnel 4.0 ATTACHMENTS 4.1 Attachment I - GGNS Evacuation ap 4.2 Attachment II - Emergency Preparedness Owner Controlled Area 5.0 DEFINITIONS 5.1 CA - Controlled Access Area 5.2 C& - Central Alarm Station 5.3 Company Owned Progertv - All the land the company owns at the site.

5.4 El - Emergency Information Center 5.5 Emeraencv Preparedness Owner Controlled Area (FEPOCA) - The area at the site, which is owned and controlled by the station, for which the station has the responsibility to evacuate, except for any areas covered by agreements wiLli sLLe OL LhtL yuveLuneiLital agencies.

5.6 Emeraencv Response Personnel - GGNS Entergy Operations and contractor personnel who are:

5.6.1 ERO members standing call, as scheduled by Emergency Preparedness, during the emergency or occurrence OR b.6.2 electrical, nscruments

Controls, echanical, Radiationi Protection, Operations, Chemistry shift or Security personnel required to respond to an emergency.

5.7 ENMC -

Emergency News Media Center 5.8 EDE - Emergency Operations Facility, located in the Energy Services Center.

5.9 EQ - Emergency Response Organization 5.10 E$C - Energy Services Center 5.11 Limited Evacuation - An evacuation of specific areas of the plant.

5.12

=SC - Operations Support Center 5.13 PA -

Public Address 5.14 Protected Area - Area located within the Emergency Preparedness Owner Controlled Area and enclosed by physical barriers to which access is controlled for security purposes.

5.15 M^S - Secondary Alarm Station 5.16 Site Evacuation - An evacuation of the Emergency Preparedness Owner Controlled Area and Protected Area.

5.17 TSC - Technical Support Center J :ADM_SRVS\\TECHLPUB\\REVISION\\10SO111.DOC

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

4 I

Personnel I

I I

I 6.0 DETAILS 6.1 Site Evacuation Emercency Director/Shift Manaaer) 6.1.1 The Emergency Director/Shift Manager should use his best judgment to determine whether a Site or Limited Evacuation is necessary.

a.

As a general guideline, Site Evacuation (rather than Limited Evacuation) is to be performed when:

(1) A Site Area Emergency is declared, or (2) A General Emergency is declared, or (3) Anytime hazardous conditions (radiological, environmental, chemical, fire, etc.) threaten the health or safety of personnel in a major portion of the site.

b.

The following areas are evacuated if a Site Evacuation has been declared.

(1) The protected area (exceDt Control Room. CAS, SAS, and activated Emergency Response Facilities inside the Protected Area)

(2) Emergency PrApRirPd1nF Owner controlled Area -

(except EOF, and Security Island)

c.

Determine if further evacuations are necessary (i.e., Control

Room, OF, TSC. OSC.

CAS, SAS or Security TlAnr).

Tf one or more of these facilities are to be evacuated, alternate sites may be used to perform the functions of the evacuated facility.

J:ADM_SRVS\\TECI_PUB\\REVISION\\1OSO111.DOC WAmnin.

Before conducting an evacuation, considerations should be made for weather conditions, traffic or radiological impediments.

If the evacuation has the potential to cause more harm, inform all persons to shelter in a safe location or perform a limited evacuation.

Warning For security emergencies, inform all personnel to take shelter, to N move around in the plant, and to man only those emergency facilities which are necessary and that don't pose a risk to personnel.

GRAND ULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.: 10-S-01-11 Revision:

18 Page:

5 I

Personnel I

I I

I 6.1.2 Immediate Actions (Control Room/TSC)

a.

Once an Evacuation has been determined to be necessary, ensure the following actions are performed:

(1) Notify Security (CAS-2402 and/or SAS-2423) to begin the accountability pro-eRR idPntAfid in Srt.inn 6.2.1 before announcing an evacuation (unless immediate personnel safety is at risk).

If personnel safety is at risk, notify security as soon as possible after the evacuation is announced.

(a) Inform Security of evacuation routes to be used, area to be evacuated and destination of evacuees.

b.

Protect Plant Personnel (Control Room/TSC)

(1) Sound the Evacuation Alarm for five seconds.

(2) If a release is in progress, designate appropriate evacuation routes (North or South Gate) and Evacuation Reception Centers; Warren Central High School (north),

Hinds Community College - Utica Campus (northeast),

Hazelhurst High School (east), Natchez High School (south).

(3) rhe meraency pirector or desianee should make an announcement similar to the following on the PA system (to the entire site):

(a)

'ATTENTION ALL PERSONNEL.

ATTENTION ALU PERSONNEL.

CONDITIONS IN THE PLANT WARRANT AN IMMEDIATE SI EVACUATI.

ALL NON-EMERGENCY PERSONNEL EVACUATE THE SITE. USE E _

GATE AND REPO2T TO THE EVACUATZOPJ RECEPTZO CENTER.

ALL EMERGENCY RESPONSE PERSONNEL REPORT TO YOUR EMERGENCY RESPONSE FACILITY.

(b) All PA announcements should be repeated.

J:ADICSRVS\\TECH-PUB\\REVISION\\10SO111.DOC NOTE Activating the Evacuation Alarm also activates the flashing red evacuation lights in high noise areas of the plant.

NOTE Bold talIcIzed portions of the evacuation announcement are required if a radioactive release is in progress.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

6 Personnel 6.1.2.b (Cont.)

(4) Personnel in the Controlled Access Area (CAA) normally exit immediately through the HP Lab (93' elevation of the Control Building), unless otherwise directed.

c.

Use the PA Systems to give frequent information updates on the status of the emergency.

d.

Notification Of Personnel Outside The Protected Area (1) If a site evacuation is declared, supervisory personnel ensure that no one remains in his or her immediate work area.

(2) Company. nntract personnel and visitors located outside the protected area but within the Emergency Preparedness Owner Controlled Area are notified by public address system (phone 7929) or security personnel equipped with A pnrtable PA system.

(a) The Security Coordinator dispatches an officer, in accordance with Security Post Order, to assist in making checks of the Emergency Preparedness Owner Controlled Area to ensure that personnel have been notified and are evacuating as directed.

These checks will be completed as soon as possible but no later than 2 houro under most conditions.

(b) Security reports the results of the Emergency Preparedness Owner Controlled Area evacuation to the Emergency Director.

(3) Other persons outside the Emergency Preparedness Owner Controlled Area, but in public access areas near-site or passing through the Company-owned property ae noLified by the Alert and Notification System activated by local authorities.

6.1.3 Personnel Response In The Protected Area

a.

Emeroency Resnonse Personnel (1)Ir exlLlag the CAA, the normal exit is through the Health Physics Lab on the 93' level of the Control Building, unless otherwise directed.

(a) Personnel exiting the CAA may be requested to key card into the HP accountability reader.

(2) Proceed to your Emergency Response Facility to support emergency response actions.

(3) Emergency personnel assigned to the OSC should card into the Maintenance Shop accountability card reader and report to the OSC.

J:ADM_SRVS\\TECH-PUB\\REVISION\\10SO111.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

7 l

Personnel I

I 6.1.3.a (Cont.)

(4)

The following Emergency Response Personnel need not log into an accountability card reader for accountability:

(a) Emergency Response Personnel assigned to the Control Room, TSC, CAS, SAS, or Security Island (h)

OSC t.AAmR thAt Ari-rrrAntly in th.

field (c) Operations personnel currently in the field (5) Emergency response personnel who respond to offsite Emergency Response Facilities (EOP, ENMC, and EIC) exit the protected area through Security Island, ensuring they use the exit turnstile card reader for accountability.

These personnel then proceed to their assigned facilities unless directed otherwise.

b.

Non-Emeraency Personnel (1)

Exit the protected area through Security Island, ensuring that you use the exit turnstile card reader for accountability.

c.

All personnel should be trained on evacuation routes or escorted by someone who is so trained.

a.

Company employees, contract personnel and visitors are to leave the Emergency Preparedness Owner Controlled Area upon notification of a Site Evacuation. The normal access routes are to be used unless otherwise directed.

b.

Emergency Response Personnel report to your Emergency Response Facility.

6.1.5 Security Personnel Response

a.

In the event that the Security Island, SAS, or other manned security areas become uninhabitable, security personnel will relocate in accordance with Security Section Procedure 11-S-11-6.

b.

If relocation to CAS is prevented for whatever reason, the Security Coordinator in conjunction with the Emergency Director will determine alternate relocation sites.

c.

All patrol personnel assigned duties in the power block will relocate in accordance with Security Section Procedure 11-S-11-6.

J:ADMLSRVS\\TECH-PUB\\REVISION\\lOSO111.DOC rersonncl Recn0c

%Jutzd rcFoetaA GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCED URE I

A 5

t CU.1.4

-I

 -

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

8 L

Personnel I

I I

I 6.1.5 (Cont.)

d.

Security Island personnel relocate to a safe distance until hazardous conditions no longer exist.

6.1.6 Follow-up Actions Emeraency Director)

A.

niqiir4 priodic announcements are made over the Plant PA asnd the Site Paging System (#7929) concerning the evacuation until Security reports that the evacuation is complete.

6.2 Accountability 6.2.1 Personnel Accountability Within The Protected Area with a Site Evacuation

a.

Personnel respond as outlined in 6.1.3.

b.

The OSC Coordinator should provide CAS with the name and badge number of OSC team members in the field within 10 minutes of the declaration of the evacuation.

c.

The Shift Manager should provide CAS with the name and badge number of Operations personnel in the field within 10 minutes of the declaration of the evacuation.

d.

Security should perform accountability for their personnel in accordance with security procedures.

e.

The Security Coordinator determines the accountability and reports it to the Emergency Director (ED).

This is accomplished by providing a printout of those individuals remaining within the protected area who have not key carded into an accountability card reader.

The Security Coordinator ensures that TSC, Control Room, Security personnel and OSC team personnel currently in the field are accounted for by reviewing the accountability printout.

f.

The accountability process is considered complete when all personnel on the accountability printout are accounted for or identified as missing. It is anticipated that accountability and identification of missing persons can be accomplished in approximately 30 minutes from the declaration of the Site Area Eergency, General Emergency or the time it is determined that a site evacuation is required.

g.

Search and Rescue should begin at the completion of accountability and be done in accordance with l0-S-01-18.

J :AD-SRVS\\TECH-PUB\\REVISION\\10S0111.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

9 l

Personnel I

I I

I 6.2.2 Personnel Accountability within the Protected Area without a Site Evacuation

a.

The Shift Manager/Emergency Director makes the decision that plant conditions exist that warrant personnel accountability without a site evacuation being declared.

b.

Notify the Security officer in CAS (phone 2402) that personnel accountability will be performed and that a site evacuation will not be declared at this time.

~NOTE A list of all persnnnel currently logged into the protected area and their location can be obtained by contacting security (CAS or SAS).

c.

If it is desired that all personnel within the protected area log into an accountability card reader and assemble at designated areas, perform the following steps:

(1)

Announce over the plant paging system that personnel accountability is required and that all personnel within the protected area should proceed immediately to the nearest accountability card reader, card in and await further instructions. Accountability card readers are located in the following areas:

maintenance shop wall near break room door HP Lab 93' elevation Control Building Control Room Kitchen Security Island Exit Turnstiles (2)

The Shift Manager, within 10 minutes of the declaration of accountability, should provide CAS with the name and badge number of perations personnel in the field who can not immediately report to an accountability card reader.

(3) If the OSC is activated and OSC teams are in the field, Lhe osc coordinator, within 10 minutes of the declaration of accountability, should provide CAS with the name and badge number of each team member in the field.

(4) Personnel reporting to the maintenance shop should card into the maintenance shop accountability card reader and then assemble in the maintenance shop break room and await further instructions.

(5) Non-operations personnel reporting to the Control Room kitchen accountability card reader should card in and then assemble in the 177' viewing gallery area and await further instructions.

(6) Operations personnel reporting to the Control Room kitchen accountability card reader should card in and then assemble in the operations locker room.

j:ADM_SRVS\\TECH_PUB\\REVISION\\1OS0111.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

10 Personnel 6.2.2.c (Cont.)

(7) Personnel reporting to the HP lab accountability card reader should card in and then assemble in the HP break area or hallway on the 93' elevation of the Control Building and await further instructions.

(8) Security should perform accountability for their personnel in accordance with security procedures.

(9) Personnel using the Security Island Exit turnstyles for accountability purposes should swipe their key card in the card reader and EXIT the Protection area.

d.

Thp Security Coordinator determines the accountability and reports it to the Emergency Director (ED).

This is accomplished by providing a printout of those individuals remaining within the protected area who have not key carded into an accountability card reader. The Security Coordinator ensures that TSC, Control Room, Security personnel and OSC team personnel currently in the field are accounted for by reviewing the accountability printout.

e.

The accountability process is considered complete when all personnel on the accountability printout are accounted for or identified as missing.

It is anticipated that the personnel accountability and idcntification of miesing pereons can be accomplished in approximately 30 minutes from the time that it is determined that accountability is required or the declaration of a Site Area Emergency or General Emergency.

f.

Search and Rescue should begin at the completion of accountability and be done in accordance with 10-S-01-18.

6.3 Limited Evacuation 6.3.1 Generally, a limited evacuation may be required if the health and safety of personnel are threatened by radiological hazards, fire, smoke, heat or flooding in a localized area.

a.

When the area to be evacuated is identified:

(1) motify Security CAS-2402 and/or SAS-2423) to begin the accountability process before announcing an evacuation (unless immediate personnel safety is at risk).

If personnel safety is at risk, notify security as soon as possible after the evacuation is announced.

(2) Make an announcement on the PA system identifying the area to be evacuated with directions to evacuating personnel to report to the HP laboratory or the Maintenance Shop accountability card readers.

J:ADN_SRVS\\TECH_PUB\\REVISION\\lOSOll1.DOC GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Evacuation of Onsite No.:

10-S-01-11 Revision:

18 Page:

11 I

Personnel I

I 6.3.1.a Cont.)

(3)

Ensure periodic announcements are made over the Plant PA concerning the evacuation as long as the condition(s) is(are) present.

b.

Roqucot thc Scurity Coordinator to determine accountability in the local evacuated area and report the results to the Shift Manager/Emergency Director. This is normally accomplished by obtaining a printout of those personnel currently key carded into the ffected area.

c.

During a limited evacuation, Security may be unable to determine accountability in the localized area(s).

If this is the case, a building accountability should be performed and the results reported to the Shift Manager/Emergency Director.

6.4 Evacuating Personuiel Suryvwv Aid DcoutnlInatiori 6.4.1 In the event that a radiological release occurs before the evacuation is completed, personnel and vehicles may be surveyed and decontaminated as needed. A monitoring and decontamination station is established at the EOF when directed by the Emergency Director.

If a delay due to decontamination poses an undue risk to evacuating personnel, then personnel, vehicles, and materials are directed to an offsite monitoring and decontamination facility.

6.4.2 All personnel exiting the CAA are monitored for contamination.

6.4.3 Personnel decontamination should be performed in accordance with 08-S-02-22, Personnel Decontamination.

6.4.4 All personnel decontamination done on site is to be performed by or supervised by qualified Senior Health Physicists.

6.4.5 Decontamination involving internal contamination (absorption through wounds. inaestion, etc.) should be performed under the supervision of qualified irst Aid personnel.

J:ADMLSRVS\\TECH_PUB\\REVISION\\10SO111.DOC NOTE It is not necessary to key card out of the affected area(s) or zone(s) during the evacuation, but personnel are required to card into an accountability card reader when directed.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE I

EMERGENCY PLAN PROCEDURE 10-S-01-11 Attachment I Revision:

18 Page 1 of 1 GONB EVACUATION MAP ATTENTION TO VISITORS:

As a visitor to Grand Gulf Nuclear Station you are required to adhere to nstructions announced over the P.A. System during any declared emergency. Announcement of a site evacuation will require an immediate and orderly exit from the site as directed.

(See map below for evacuation routes)

TO GRAND GULF STATE PARK NORTH GATE TO PORT GIBSON J:ADM-SRVS\\TECHLPUB\\REVISION\\10SO111.DOC GRAND GULF NUCLEAR STATION

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE l10-S-01-11 Revision:

18 Attachment II Page 1 of 1 EP OWNER CONTROLLED AEA K=

The EP Owner Controlled Area includes Heavy Hall Road from the plant to Radial Well

  1. 1. thouah not shown on drawino.

J:ADM_SRVS\\TECH_PUB\\REVISION\\10SO111.DOC

PLAXIT OPERATIONS MUA Volume 10 Section 01 10-S-01-18 Revision:

7 Date: 5/Z7/03 EMGDCr PLAN PROCEDURE PERSONNEL SEARCE AND RESCUE SArZTYRLAE List of Effective Pages:

Pages 1-4 List of CNs Incorporated!

Revisi MN 0

None 1

None 2

None 3

None 4

None 5

1,2 6

None 7

None J:\\Adx_srvs\\TECH-PUB\\REVISION\\10\\10S0118.doc

Title:

Personnel Search and No.:

10-S-01-18 Revision:

7 Safety I

Rescue I

E l

valuation S.

OVERVIEW I SIGNATURES racility:

GGS Document Reviewed:

10-S-01-18 Char"e/Rev.

7 System Designator(s)/Description:

NA Descrltion of Prooosed Chanae Grammatical chances. corrects titles of HP to RP, adds several examoles of methods that may used to attemDt contactina missina personnel. transfers the responsibility ft LJvLLr mina attem,ta to contact miasinar eraonncl from the Emeraencv Director to the OSC Coordinator If the proposed actlvity, n

ts entirety, nvolves any one of the criteria below, check the approprlate boz, provLde a justLficatLon/basLs n the DescrLptLon above, and forward to a RvLewer.

No further 50.59 Revlew Ls requlred.

If ona of the criteria is applicable, continue wlth the 50.59 Rviow.

o The proposed actMty Is editoral/Ipographical as defined in Secton 522.1.

O The proposed actty represents an FSARnytf change as allowed In Section 5.2.2.2

. (Insert Rem # from Section 5.2.22).

O The proposed activit s controlled by another regulation por Soction 6.2.2.3.

If further 50.59 Revlew is requLred, check the applicable review(s):

(only the sections indlcated ast be included in the Review.)

(9]

SCREEN=G Sections1, 11, and III required O

50.59 EVALUATION tVIPTXION Sections I, II, III, and XV requLred O

50.59 EVALUATION (I:

Sections l, H, I, and V required A

Richard Sumrall /

/ EOI / EP 5-15-2003 Name (print) / Signat

/ Company / Department / Date Rkdw., V

/Vo/5,/k-Zo 0 Name (print) / Silnature / Co any / 'Depattment / Date N/A Chairman's Name (print) / Signature / Date

[Required only for Programmatic Exclusion Screenings (see Section 5.8) and 50.59 Evaluations.I List of Assisting/Contributing Personnel:

Names Larry Durden Scope of Assistance:

-Review of security Plan J:\\Ep\\STAFF\\rsumral\\draft procedures\\lOsOll8r7.doc Preparer:

Reviewers OSRC2 GRAND GULF NUCLEAR STATION F-KERGENCY PUN PROCEDURtE

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Personnel Search and I

Rescue I No.:

10-S-01-18 IRevision:

7 ISafety IEvaluation II.

SCREENING A.

Licensina Basis rh.rirmpnt R vipw

1.

Does the proposed activity Impact the facility or a procedure as described In any of the following Ucensing Basis Documents? (Check UA" for those documents that are not applicable to the facility.)

Opering License u s o

1 CHANGEandor SECflONS JMPACIED Operating License NRC Orders 3

MI 1

H -YES", obtain NRC approval prlor to Implementlng the change. (See Section L1.13 for exceptions.)

LBDs controlkd nder 50.59 TM so P/A CHANE # (Iappicabk) an/or SECIONS IMPACTED FSAR 0

TS Bases O

El Technical Requiremnts Manual l

18 Core Operating Limits Report O

IE Offsite Dose Calculations Manual O

El NRC Safety Evaluation Reports 1 El El H- "YES' performn an Exerpton Review per Section IV Q perform a 50.59 Evaluation per Section V.

LBDs conrroUed under ugler jES n0 3/k CIJANGE ((fapplicable) andlor SECTONS IMPACTED regtions Quality Assurance Program Manual 2 al El Emergency Plan' E3 El Security Plan' 3 0

El Fire Irotection Program 4

O El lincludes the Fire Hazards Analysis) ff "YES", evaluatelprocess any changes In accordance with the appropriate regulation.

2.

Does the proposed activity Involve a test or experiment not described In the FSAR?

If "yes," perform an Exemption Review per Section IV OR perform a 50.59 Evaluation per Section V.

S.

Doet the proposed activity potentially Impact equipment, procedures, or facilities utilized for storing spent fuel at an Independent Spent Fuel Storage Installation?

(Check "NA" 11 dry fuel storage Is not applicable to the facility.)

ff uyes," perform a 72A.8 Revlew In accordance with NMM Procedure U-112.

(See Sections 1.5 and 5.3.1.5 of the EOI IOCFR50.59 Review Program Guidelines.)

o yes El No O

Yes o No oa NA I

YES. see Section 5.1.5.

2 H mYES" nofy the responsrloe department and sure a 60.54 Evaluaion I peromied.

3 The Security Plan Is dassifled as safeguards and can only be reviewed by persomel wth the appropriate security cearance. The Preparer shoild noUfy te security department of potential canges to the Security Plan.

4If YES, evaluate te change In accordance with the requirements of te facilitys Operatin Ucense oond.tion.

J:\\Ep\\STAFF\\rsumral\\draft procedures\\10s0118r7.doc

-1 l

4 A

l GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE I

Title:

Personnel Search and No.:

10-S-01-18 Revision:

7 Safety Rescue Evaluation B.

Basis (Provide a clear. concise basis for the answers given in the applicable sections above.

Adequate baui. must b provided within the scresning such that a third-party reviewer can reach the same conclusions. Simply stating that the change does not affect TS or the FSAR is not an acceptable basis.)

Performed a keyword search of the on-line Emeraency Plan. UFSAR, Tech Specs. TRM. Oeratino License. NRC Orders. COLR. ODCM. Fire Protection Program. and SERs for the keywords Search'.

Search and Rescue'.

'flashliahts.

first aid'. 'OSC Coordinator', and missing personnel'.

Roviowed all hits returned. No chanee in this rocldrp ffernt anv of the documents above.

Emergencv Plan Section 6.5.1 discusses accountability and missing personnel in aeneric terms. but does not provide specific guidance as discussed in this procedure.

Performed online search of the OSHA Reaulations for the keywords

'accountability,.

'oearch and reccue'. 'earch'.

buddy system' and wmissina'.

OSHA reaulation 29CFR1910.38(c)(4)and 29CFR1926.35(b)(1) discusses havina vrocedures for accountability of ersonnel and 29CFR1910.38(c)(5) and 29CPR1926.351b)14) discuss having procedures for ersonnel erformin_

rescue and medical oerations. but they do not specify specific reauirements for these procedures.

This chance does not represent a chanae to any systems. structures. or components described in the UFSAR.

C.

References

[Discuss the methodology for performing the LBD search.

State the location of relevant licensing document information and explain the scope of the review sucb as electronic search criteria used (e.g., key words) or the general extent of manual searches per Section 5.3.6.4 of LI-101.l LBDs/Documents Reviewed:

Keywords:

Emercencv Plan. UFSAR. Tech Specs, TRM,

'Searchw.

Search and Rescue'.

Operatina License. NRC Orders. COLR.

'flashlight'.

first aid'.

OSC ODCM. Fire Protection Program, and SERs Coordinator'. and missina personnel' OSHA regulations 29CFR1910.38(c)(4).

'accountability'.

search and 29CFR1226.35(b)(1.

29CM1910.38(c)(5) rescue' searh.

lddy sytem nd and 29CFR1926.35(b)(4) missing.

D.

the validity of this eview dependent on O

Yes emy other ch e

(Dee ection

.3.4 of tho O

I E No 10CFR50.59 Program Review Guidelines.)

If "'Yes," list the required changes.

N/A J:\\Ep\\STAFF\\rsumral\\draft procedures\\ls0118r7.doc EKEnRGENqCY PLAN PROCEDURE GKAND GULF NCLEAR STATION

GRAND GULF NUCLEAR STATION

Title:

Personnel Search and No.:

10-S-01-18 I

Rescue I

rMERGENCY rLAN rROCEDURE Revision:

7 lSafety I

lEvaluation I

ZII.

REE S

NNG If any of the following questions i answered yes,' en Environmental Review must be performed in accordance with MM Procedure EV-115, 'Environmental Evaluations," and attached to this 50.59 Review.

Will the proposed Change being evaluateds Yg o-O El Involve a land disturbance of previously disturbed land areas in excess of one acre (i.e., grading activities, construction of buildings, excavations, reforestation, creation or removal of ponds)?

O 0

Involve a land disturbance of undisturbed land areas (i.e., grading activities, construction, excavations, reforestation, creating, or removing ponds)?

o 1K!

Involve dredging activties in a lake, river, pond, or stream?

O Ei Increase the amount of thermal heat being discharged to the river or lake?

O E3 Increase the concentration or quantity of chemicals being discharged to the river, lake, or air?

O El Discharge any chemicals new or different from that previously discharged?

O E3 Change the design or operation of the intake or discharge structures?

O ED Modify the design or operation of the cooling tower that will change water or air flow characteristics?

O E

Modify the design or operation of the plant that will change the path of an existing water discharge or that will result in a new water discharge?

O El Modify existing stationary fuel burning equipment (i.e., diesel fuel oil, butane, gasoline, propane, and kerosene)?l O

E3 Involve the installation of stationary fuel burning equipment or use of portable fuel burning equipment (i.e., diesel fuel oil, butane, gasoline, propane, and kerosene)?'

a E3 Involve the inctallation or use of equipment that will result in an air emission discharge?

0 El Involve the Installation or modification of a stationary or mobile tank?

O E

0 Involve the use or storage of oils or chemicals?

3 IX Involve burial or placement of any solid wastes in the site area that may effect runoff, surtace water, or groundwaLer?

t See NMM Procedure EV-117, Air Emissions Managemem Progaam," tor guicance In answeri ts question.

J:\\Ep\\STAFF\\rsumral\\draft procedures\\lOsOllBr7.doc

Title:

No.: 10-S-01-18 Revision:

7 Emergency Personnel Serhad RecePlan i

Search an Rescue I

~

~~~~~~Evaluation 10CFR50.54(a) Screeninf

1.

DOCUMENT INFORMaTION Procedure/Document Number: 10-S-01-18 lProc./Doc. Revision: 7 Document

Title:

Personnel Search and Rescue Brief Description of Proposed Revision: Grammatical changes, corrects titles of HP to RP, adds several examples of methods that may used to attempt contacting missing personnel, transfers the responsibility for performing attempts to contact missing personnel from the Emergency Director to the OSC Coordinator

2.

SCREENING A.) Does the proposed revision require a change to the Emergency Plan?

Yes -E No Emeroency Plan Section 6.5.1 discusses accountability and miooina Droonnal in ceneric terms. but does not provide specific uidance as discussed in this procedure, B.) Does the pooujed revision change the site Emergency Action Levels (SALa)?

_Yes No If the answer to either question is YES, then a 50.54(q) evaluation rust be performed. Se attachment 9.2.

3.

APPROVAL Screening Completed By:

h 3

l/I/oS SIGNATURE DATE Screening Reviewed By:

OkZ b'i 1fF A

'Ios U'

SIGNATURE DATE J:\\Ep\\STAFF\\rsumral\\draft procedures\\lOsOhl8r7.doc GRAND GULF NUCLEAR STATION EMERSENTCY PLAN PROCEDURE

Title:

Personnel Search and No.:

10-S-01-18 Revision:

7 Page:

i I

Rescue I

I I

I l10CFR50.59 Review Required?

(X) Yes If Yes, attach 50.59 Review Form No JNot required per LI-101 l

Cross-Discipline review required?

(X) Yes (Note affected Departments Below)

.( ) No IreDarer Initials>>> l 4

Department Cross-Discipline Reviews Needed Signoff Eignied. electronic, telcon)

Emergency Director Lead OSC Coordinator Lead Does this directive contain Tech Spec Triggers?

) YES (x) NO REQUIRESETS CROSS-REFEENE LST Requirement Implemented by Directive Directive Paragraph Number Name I Paragraph Number i That Implements Requirement None I

  • Covered by directive as a whole or by various paragraphs of the directive.

Component Database Change Request generated and the backup documentation available for setpoint and/or calibration data only 0 Yes ED N/A CDBCR Y Current Revision Statement Revision 7:

Makes grammatical changes Corrects titles of HP to RP Adds several examples of methods that may used to attempt contacting missing personnel Transfers the responsibility for performing attempts to contact missing personnel from the Emergency Director to the OSC Coordinator J: \\AdL_srvs\\Techpub\\Revision\\l0\\lOsOll8.doc NOTE Tlt: CuuWu t&ieiL DaLabaee Canuge RequesL kiLeLtLAlulL ki

,pLiUdcble uilly L VoluLue 06 dlld 07 maintenance directives.

GRAM3 GULF NUCLEAR STATION EMERGENCY PAN PROCEDURE

Title:

Personnel Search No.:

10-S-01-18 Revision:

7 Page:

1 I

-and Rescue I

I 1.0 PURPOSE ANn DISCUSSION 1.1 Purpose 1.1.1 To provide guidance for the organization, coordination and control of Search and Rescue Teams.

1.2 Discussion 1.2.1 During an emergency at GGNS, Search and Rescue Teams may be dispatched to locate and provide assistance to missing and possibly injured personnel.

1.2.2 Team members may be subjected to hazardous radiological and environmental conditions; therefore, the personnel safety precautions and methods described in this procedure must be observed.

1.2.3 The team must be prepared to perform first aid duties as necessary.

2.0 RESPONSIBILITIES 2.1 Emergency Director - Notifies OSC Coordinator when personnel are determined l to be missing and/or injured during an emergency.

2.2 OSC Coordinator -

Is responsible for the assembly, dispatch and coordination of the Search and Rescue Teams.

2.3 RP Shift Supervision-Assumes the responsibilities of the OSC Coordinator for dispatching Search and Rescue Teams from the Health Physics Lab when the OSC has not been activated.

2.4 Search and Rescue Team Leader -

Is responsible for the personal safety of team members.

2.5 Team Radiation Protection technician - Assists the team leader to ensure proper protection against radiological hazards for team members.

This includes the proper use of protective clothing, respiratory protection and ensuring team members' radiation exposures remain ALARA and below authorized limits.

3.0 REFERENCES

3.1 None 4.0 ATACHNENTS 4.1 None 5.0 DEFINITIONS 5.1 OSC - Operations Support Center 5.2 ALARA - As Low As Reasonably Achievable J:\\Adm_srvs\\Tech_pub\\Revision\\10\\10S0118.doc GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

GRAND GULF NUCLEAR STATION ITitle: Personnel Search I

and Rescue 6.0 DETAILS 6.1 SEARCH EMERGENCY PLAN PROCEDURE INo.:

10-S-01-18 IRevision:

7 Page:

2 l

AND RESCUE TEAM FORMATION 6.1.1 The Emergency Director advises the OSC Coordinator to assemble Search and Rescue Teams based on the personnel accountability listing.

6.1.2 The Emergency Director must provide the following information to the OSC Coordinator:

a.

Number and identity of missing persons

b.

Last known location

c.

Plant conditions that may affect team operations 6.1.3 The OSC Coordinator should ensure that attempts are made to contact the missing persons before dispatching Search and Rescue Teams.

a.

Attempts to contact missing personnel may include:

(1) pager announcements (2) portable radio announcements (3) telephone calls to the missing persons' office and pager 6.1.4 The OSC Coordinator assembles the required number of Search and Rescue Teams and designates a Team Leader for each team.

a.

The minimum manning for a Search and Rescue Team is:

(1) a Radiation Protection technician (2) a First Aid qualified individual

b.

The OSC Coordinator may assign additional personnel to the team as necessary.

6.1.5 The Health Physics Coordinator ensures that team members have sufficient remaining radiation nxponire marginTr pr 10-S-01-17, Emergency Personnel Exposure Control.

J:\\Adisrvs\\Tech-pub\\Revision\\1O\\l0s01l8.doc

[Title: Personnel Search l No.:

10-S-01-18 lRevision:

7 lPage: 3 and Rescue l

l l

6.1.6 The Team Leader ensures the team is provided with the following equipment (as applicable) based on the reported radiological and environmental conditions which the team is expected to encounter:

a.

Portable radio

b.

Dosimetry devices per 10-S-01-17, Emergency Personnel Expoourc Control

c.

Protective clothing

d.

Respiratory protective equipment

e.

First aid kit

f.

Flashlight

g.

Other equipment deemed necessary by the OSC Coordinator G.1.7 The OSC C.dlaaLur informs the TSC when he ream is ready or dispatch.

6.2 DISPATCHING OF SEARCH AND RESCUE TEAMS 6.2.1 The Health Physics Coordinator ensures that each team receives a detailed briefing covering the following subjects:

a.

Number and identity f miina pergons

b.

Last known location

c.

Expected radiological and environmental conditions to be encountered

d.

Frequency of status reports to the OSC

c.

Search pattern to be used 6.3 SEARCH AND RESCUE TEAM OPERATIONS 6.3.1 The Team Leader directs a pre-planned search pattern in the last known location of the missing individual and expands into the adjacent areas as necessary.

6.3.2 Use the buddy system". Team members do not seDarate without direct permission from the Team Leader.

6.3.3 The Team Radiation Protection technician has the authority to stop and/or redirect Search and Rescue Team actions based upon an assessment of radiological conditions.

If conditions are such that an unacceptable hazard is present, the Search and Rescue Team effort is to be terminated until those conditions are properly evaluated.

NOTE Frequent status reports must be relayed to the OSC.

The OSC Coordinator briefs the Emergency Director on the search progress.

J:\\Adm-srvs\\Tech-pub\\Revision\\10\\lOsOll8.doc GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Personnel Search No.:

10-S-01-18 Revision:

7 Page:

4 and Rescue 6.3.4 Once the missing individual has been located, the Team Leadeir must:

a.

Notify the OSC - Give the individual's name, location and physical condition.

b.

Direct the performance of first aid, if necessary, in accordance with 10-S-01-19, Personnel Injury.

Injured personnel should be transported to a safe area or the Firct Aid Station.

Stretchers are available throughout the plant, if needed.

c.

Request assistance from the OSC, if needed.

Assistance may be required to remove injured personnel trapped by falling equipment, to provide medical support, or to deal with adverse conditions such as fire, very high radiation levels, airborne activity, contamination, or team.

6.3.5 The Team Leader should notify the OSC Coordinator when a team member is missing.

J:\\Adm.srvs\\Tech-pub\\Revision\\10\\lOsOllB.doc GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE