GNRO-2001/00053, Changes to Emergency Plan Implementing Procedures - July 6, 2001

From kanterella
Jump to navigation Jump to search
Changes to Emergency Plan Implementing Procedures - July 6, 2001
ML011910478
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/06/2001
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
-RFPFR, GNRO-2001/00053
Download: ML011910478 (23)


Text

Enter

erations, Inc.

P.O.

Box 756 Port

Gibson, MS 39150 Tel 601 437 2800 July 6, 2001 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Subject:

Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29 Changes to Emergency Plan Implementing Procedures

- July 6, 2001 GNRO-2001/00053 Ladies

& Gentlemen:

Entergy Operations, Inc. submits in accordance with 10CFR50 Appendix E, Section V changes to the following Emergency Plan Implementing Procedure:

10-S-01-6 Rev.35 This letter does not contain any commitments.

Yours truly, CAB/MJL attachment:

I.

Procedure 1 O-S-01-6 cc:

(See Next Page)

July 6, 2001 GNRO-2001/00053 Page 2 of 2 cc:

Hoeg T. L.

(GGNS Senior Resident)

(w/a)

Levanway D. E.

(Wise Carter)

(w/a)

Reynolds N. S.

(w/a)

Smith L. J.

(Wise Carter)

(w/a)

Thomas H. L.

(w/o)

Mr. E. W. Merschoff (w/2)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV ALL LETTERS 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. S. P. Sekerak, NRR/DLPM/PD IV-I (w/2)

ALL LETTERS ATTN:

ADDRESSEE ONLY U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 07-01 11555 Rockville Pike Rockville, MD 20852-2378

Volume 10 Section 01 PLANT OPERFiTIONS MANUAL 10-S-01-6 Revision:

35 Date:

6/27/01 Prepared:

Reviewed:

Concurred:

PSRC:

Approved:

EMERGENCY PLAN PROCEDURE EMERGENCY PLAN PROCEDURE NOTIFICATION OF OFFSITE AGENCIES AND NOTIFICATION OF OFFSITE AGENCIES AND PLANT ON-CALL EMERGENCY PERSONNEL PLANT ON-CALL EMERGENCY PERSONNEL SAFETY RELATED SAFETY RELATED List of Effective Pages:

Page l-15 Attachments I

List of TCNs Incorporated:

Revision TCN 0

None 1

1 2-5 None 6

2 7

3,4,5 E-10 None 11 6

12-16 None 17-19 None 20 7

21 None 22 8,9 23 None 24 10 25 None 26 11 27 None 28 None 29 12 30 None 31 13 Revision TCN 32 None 33 None 34 14 35 None

c GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Safety Agencies and Plant On-Call Evaluation Emerqency Personnel 1

FaciW:

1 GRAND GULF I

I I. SIGNATURES I

Preparer:wM/q Richard Van Den Akker s-Zl-Li/

/

Signature Name (print)

Date Reviewer:

E-2 s-u

(.

Check the applicable boxes below.

If any of the boxes are checked, neither a Screening nor a 50.59 Evaluation is necessary.

Provide supporting documentation or r ferences as appropriate.

w.

El q

Cl q

cl The change is editorial as defined in either Section 5.3.4&J-or Section 54.1.I.I-of this procedure.

(Insert item # from Section 5.3.4 or Section 5.4.1.I).

Provide document change request to the appropriate department, if required.

The change is a substitute part per Section 5.4.1.2.

The change will be controlled in its entirety under 10CFR50.54 instead of 10CFR50.59 per Section 5.4.1.3 of this procedure.

An approved, valid Screening or 50.59 Evaluation covering all aspects of the change already exists per Section 5.4.1.4.

Reference 50.59 Evaluation or attach documentation.

Verify the previous Screening or 50.59 Evaluation remains valid.

The proposed

change, in its entirety, has been approved by the NRC per Section 5.4.1.5.

Reference:

The change is being made to conform to the SAR per Sections 5.4.1.6.

II. OVERVIEW Document Evaluated:

(Include document

number, revision, and title) 1 O-S-01 -6, Notification of Offsite Agencies and Plant On-Call Emerqencv Personnel, Rev. 35 Brief Description of the Proposed Change:

Remove the NRC phone numbers from the procedure.

I I

Ill. PRE-SCREENING BASIS:

(Discuss how the activity meets the Pre-Screening criteria.)

This revision clarifies the NRC phone numbers in section 6.4.1, 6.4.3 and 6.4.5.

The instructions did not include dialing a 1 before the area code, which is now required when using the FTS phones.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-s-01-6 Revision:

Emergency Plan Agencies and Plant On-Call 35 Evaluation Emergency Personnel EVALUATION OF EMERGENCY PREPAREDNESS PROCEDURE Procedure Number:

10-S-01-6 Procedure Name:Notification of Offsite Agencies and Plant On-Call Emergency Personnel Revision

/ TCN Number:

35 Does the procedure R@vision/TCN require an Emergency Plan change?

(

)

Yes (Xl No NOTE : IF

YES, THIS PROCEDURE CAN NOT BE ISSUED UNTIL THE EXBRGENCY PLAN IS CHANGED/REVISED.

Reason for the

'Yes/No' response:

This revision adds a 1 to the NRC phone numbers. There is no change to any Emergency Plan requirements and no change to any process or procedure as described in the emergency Plan.

Though the Emergency Plan discusses notifying the NRC it does not describe the process used to contact them or the phone numbers used.

This procedure change will not require any change to the Emergency Plan.

Prepared:

Date:

May 21, 2001 Approved:

s so-a/

Manager,/Emergency Preparedness

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE 1

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

i Agencies and Plant On-Call Emerqency Personnel Periodic Review Required:

( )

YES (X)

NO If

Yes, list frequency:

Year If No, refer to Attachment XIX of 01-S-02-3 for a list of procedure review methods and fill in the appropriate letter(s) below; if "Other,"

specify method.

Method(s) of Review K

10CFR50.59 Review Required:

m Yes - If

Yes, attach 50.59 Review.

( ) No - Not required per section (enter Section 6.3.2(b) or 6.3.2(c) of procedure 01-S-02-3)

Cross-discipline review At YES Tech Reviewer's Initials A5 RGviewed by:

Does this directive contain Tech Spec Triggers?

( ) YES (X) NO

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

ii Agencies and Plant On-Call Emerqency Personnel REQUIREMENTS CROSS-REZ'EXENCE LIST Requirement Implemented by Directive Name Paraqraph Number Directive Paragraph Number That Implements Requirement GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GGNS Emer Plan GNRI-94/00122 AECM 84/0397 GIN-95/02001 GGNS Emer Plan 10CFR50 AECM 84/0397 (GIN-95/02001)

GGNS Emer Plan 3.3.s3, s4 2.5.Sl,S2 6.2.4.S3 6.1.1.~

6.2.4.56 6.1.l.b(2),

G.l.l.c(Note) 1.5.S6 6.2.2 1.5.3.b 6.3.2 6.2.4.59

& SlO 2.5 6.2.4.S4

& S5 6.1.1.a 8.8.S4 6.6 5.1.5.s5 6.1.1.~

(Note)S2 NRC AL 94-04 6.4.l.b, 6.4.5.d.S2 Page 2,

Para.

2.2.1, 6.6.4 6.6.3 7.5.3a.2.e 6.4.2 72.A.4 6.4.2 Page 1,

S2 Item 1

6.6.3 8.8.S5 6.1.1.a.l

  • Covered by directive as a whole or by various paragraphs of the directive.

NOTE The Component Data Base Change Request statement is applicable only to Volume 06 and 07 maintenance directives.

Component Data Base Change Request generated for setpoint and/or calibration data only

[7 Current Revision Statement Revision 35:

Clarifies the NRC phone numbers in sections 6.4.1, 6.4.3 and 6.4.5.

The instructions did not include dialing a 1 before the area

code, which is now required when using the FTS phones.

Makes minor grammatical changes.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite

  • No.:

10-S-01-6 Revision:

35 Page:

1 Agencies and Plant On-Call Emergency Personnel 1.0 PURPOSE AND DISCUSSION 1.1 Purpose 1.1.1 This procedure:

a.

Describes emergency notification responsibilities and sequences.

b.

Provides instructions for Operational Hot Line usage.

C.

Provides instructions for emergency notification to Nuclear Regulatory Commission, Offsite Agencies and Plant personnel.

d.

Provides instructions for augmenting personnel as necessary.

2.0 RESPONSIBILITIES 2.1 Shift Manager/Emergency Director/Offsite Emergency Coordinator

- Is responsible for:

2.1.1 Implementing this procedure.

2.1.2 Notification of Offsite

Agencies, NRC, Plant personnel, and Plant On-Call personnel in accordance with this procedure.

2.2 Radiation Protection Manager/Radiation Emergency Manager

- Is responsible for:

2.2.1 Verbal notification to state Radiological Assessment officer (SRAO) I when trigger points are reached.

(Refer to 10-S-01-12.)

2.3 Emergency

Response

Organization Personnel

- Are responsible for:

2.3.1 Wearing personal PAGER during their on-call week and responding appropriately to pages received.

NOTE Emergency

Response

Organization personnel are requested to Wear their pagers at all times.

2.3.2 Conducting a pager test weekly when on-call.

2.3.3 Notifying Emergency Preparedness when a personal pager is inoperable or lost.

2.4 Communicators

- Are responsible for:

2.4.1 Completing all required communications in accordance with this procedure.

2.5 On-Call Manager

- May report to the plant to assume the position of Emergency

Director, upon notification of an Unusual
Event, if he deems it necessary.

Upon notification of an Alert or higher emergency classification, the On-Call Manager reports to the plant to assume the position of Emergency Director.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No.:

10-S-01-6 Revision:

35 Agencies and Plant On-Call Page:

2 Emergency Personnel 2.5 (Cont.)

He then activates the appropriate portion of the Emergency Organizations if that has not already been done by the Shift Manager.

In any

case, the Offsite Emergency Coordinator is notified.

3.0 REFERENCES

3.1 Emergency Plan Procedure 10-S-01-11, Evacuation of Onsite Personnel 3.2 Emergency Plan Procedure 10-S-01-12, Radiological Assessment and Protective Action Recommendations 3.3 Company Procedure OM-105, Fitness for Duty 4.0 ATTACHMENTS 4.1 Attachment I - Paging Instructions 5.0 DEFINITIONS 5.1 On-Call Manager

- GGNS Manager or designated alternate 5.2 On-Call Personnel

- Personnel meeting current training requirements and assigned to emergency organization positions 5.3 VIP 2000

- A computer emergency notification system used to contact on-call personnel in an emergency 5.4 QP - Quality Programs 5.5 TSC - Technical Support Center 5.6 EPP - Emergency Plan Procedure 5.7 OHL - Operational Hot Line 5.8 ENS - Emergency Notification System 5.9 OEC - Offsite Emergency Coordinator 5.10 NRC - Nuclear Regulatory Commission 5.11 HPN - Health Physics Network 5.12 EOC - Emergency Operations Center 5.13 SRAO - State Radiological Assessment Officer 5.14 RPM - Radiation Protection Manager 5.15 REM - Radiation Emergency Manager 5.16 EOF - Emergency Operations Facility 5.17 BEOF - Backup EOF 5.18 ERDS - Emergency

Response

Data System J:\\ADM SRVS\\TECH PUB\\REVISION\\lO\\lOSOl6.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

\\ *

Title:

Notification of Offsite No.:

10-S-01-6 Revision:

35 Page:

3 Agencies and Plant On-Call Emergency Personnel 5.19 PDS - Plant Display System Computer Terminal 6.0 DETAILS 6.1 Notification of Offsite Agencies 6.1.1 Shift Manager/Emergency Director/Offsite Emergency Coordinator takes action to:

a.

Complete a Notification Form.

The Emergency Notification Form is included as part of the EP Forms Control Process (EPP 06-01) and copies of this notification form are available in the Control

Room, TSC,
EOF, and BEOF.

(1)

Messages to State and Local authorities shall include information concerning Recommended Protective Actions.

NOTE The Emergency Director/OEC must approve all Notification forms before transmittal to Offsite Agencies.

b.

Assign communicators to notify the:

(1)

State and local agencies using the OHL.

(2)

NRC Operations Center using ENS.

NOTE NRC headquarters may require continuous Communications be maintained on the ENS.

It is extremely important to provide PROMPT NOTIFICATION to the Offsite Agencies to protect the Public.

C.

Notify State and Local Agencies.

Shift Manager/

Emergency Director/Offsite Emergency Coordinator shall ensure that notification is initiated to state and local agencies within 15 minutes of an emergency declaration.

Upon completion of the notification ensure at least one of the agencies in each of the following rows listed below received the message.

Primary Secondary Row 1 Mississippi Mississippi Emergency Highway Patrol Manaqement Agency Row 2 Louisiana Office of Louisiana Department of Emergency Preparedness Environmental Quality Row 3 Claiborne County Claiborne County Civil Sheriff's Department Defense Row 4 Tensas Parish Sheriff's Department None Row 5 Port Gibson Police Department None

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No.:

10-S-01-6 Revision:

35 Page:

4 Agencies and Plant On-Call Emergency Personnel 6.1.1 (Cont.)

NOTE The NRC shall be notified of the declaration of the Emergency IMMEDIATELY AFTER THE NOTIFICATION OF STATE AND LOCAL AGENCIES and not later than one hour after the Emergency declaration.

An open channel shall be maintained until terminated by the NRC.

d.

If an ALERT or higher classification has been

declared, activate
ERDS, in accordance with 6.4.2.
e.

For Unusual

Events, Offsite Agencies need only be advised initially, a followup Notification is performed one hour
later, with a final Notification upon termination of the event unless significant changes occur which may lead to escalation.

6.2 Operational Hotline Activation 6.2.1 Communicator must:

a Locate OHL phone and lift receiver.

When you lift the receiver the phone automatically rings at all the agencies.

b.

Wait 30 seconds for agencies to come on line.

(An occasional "Grand Gulf Standby" may be used during this period to let them know that the hotline is in operation).

C.

Depress the pushbutton on receiver to

talk, release button to listen.
d.

Announce "THIS IS GRAND GULF NUCLEAR STATION.

THIS IS AN EMERGENCY NOTIFICATION.

STANDBY FOR AN INITIAL ROLL-CALL.

e.

Perform initial roll call as follows:

(1)

Read all agency names.

(2)

Check off the responding agencies.

f.

Read Notification Form Items 1 through

13.

Read slowly and deliberately because the agencies must copy the message word for word.

NOTE Occasionally, an agency may interrupt your message with a question or a request to repeat information.

Inform the agency to stand by until you have completed the Message.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

5 Agencies and Plant On-Call Emergency Personnel 6.2.1 (Cont.)

g*

Address agency questions as follows:

(1)

Announce, "THIS IS GRAND GULF NUCLEAR STATION, ARE THERE ANY QUESTIONS?"

(2)

Re-read requested information from notification form.

(3)

If requested information is not on the notification

form, record the request and inform the Emergency Director/Offsite Emergency Coordinator.
h.

Perform final roll call as follows:

(1)

Read all agency names.

(2)

Check off the responding agencies.

NOTE l

If neither primary nor secondary agencies answer the FINAL ROLL CALL, notify at least one of the agencies by commercial telephone.

(Phone numbers are on form.)

6.2.2 Verification telephone calls may be received from:

a.

Mississippi State Board of

Health, Division of Radiological Health
b.

Louisiana Department of Environmental Quality NOTE Ensure all completed Emergency Notification forms are transferred to

TSC, if activated.

6.3 Backup Communications 6.3.1 If Operational Hot Line (primary means of notifying Offsite Agencies) is inoperative, use a commercial telephone (9 + number),

satellite telephone or Entergy Fiber Optic lines (74

+ 9 + number local

calls, 9 + 1 + number long distance calls) to contact each agency.
a.

Perform Step 6.2.lf.

6.3.2 IF ALL TELEPHONE SYSTEMS DO NOT WORK, provide notification by UHF radio located in the

TSC, EOF, SAS, or
CAS, to the Claiborne County Sheriff's
Office, Tensas Parish Sheriff's
Office, and Claiborne County Civil Defense (if available).
a.

Activate tone receiver to local agencies using the instructions posted near the radio.

J:\\ADM SRVS\\TECH PUB\\REVISION\\lO\\lOSOl6.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE 1

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

6 Agencies and Plant On-Call I

Emergency Personnel 6.3.2 (Cont.)

b.

Establish communications using radio Channel

8.

REQUEST THE TWO LOCAL AGENCIES TO NOTIFY THE STATE AGENCIES OF THE EMERGENCY SITUATION AND TO PROVIDE THEM WITH ALL OF THE EMERGENCY INFORMATION.

C.

Perform Step 6.2.lf.

6.4 NRC Emergency Telecommunications System (ETS) 6.4.1 Activation of ENS

a.

Lift the receiver on the phone marked "ENS" and listen for a

dial tone.

b.

Dial the number listed below Main:

1 (301) 816-5100 Back-up:

1 (301) 951-0550 1 (301) 415-0550 FAX:

1 (301) 816-5151 C.

The above numbers may also be called from any commercial telephone.

6.4.2 Activation of ERDS

a.
b.

C.

d.
e.
f.
g.

ERDS shall be activated as soon as possible but not later than one hour after declaring an emergency class of

Alert, Site Area Emergency, or General Emergency.

Locate PDS terminal in Control

Room, normally at the Shift Manager's desk.

Monitor is normally on at all times.

Ensure that mouse arrow is on the background of the screen and press the left mouse button to make the ROOT MENU appear.

Hold down the mouse button and move the mouse arrow to the ERDS indicator and release the mouse button.

The ERDS menu appears on the screen.

Initiate the data transfer by selecting the START TRANSFER indicator on the menu with the mouse arrow.

Press and release the left mouse button.

The rest of the ERDS initiation process is automatic.

If ERDS fails to connect with the NRC Operations

Center, it automatically retries until a connection is made.

If the ERDS connection fails or data transfer fails for any

reason, a failure message appears on the ERDS menu.

Repeat step D to attempt to connect ERDS to the NRC and notify the BOP Computer Group.

The NRC should be advised of the ERDS failure as soon as possible.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

7 Agencies and Plant On-Call Emergency Personnel 6.4.2 (Cont.)

NOTE DO NOT terminate the ERDS data transfer until requested to do so by the NRC.

h.

To terminate the data

transfer, put the mouse pointer arrow on the word TERMINATE TRANSFER on the ERDS menu and press and release the left mouse button.

The connection automatically terminates.

1.

The CLOSE SESSION indicator is used to exit ERDS.

6.4.3 Problems with ENS

a.

Any problems with the ENS must be reported to the NRC.

If unable to contact the NRC on the

ENS, report problems via commercial telephone.

The commercial NRC phone number is 1 (301) 951-0550.

I

b.

Any problems with ENS should also be reported to GGNS Site Telecommunications.

6.4.4 Attempt to notify the NRC Resident Inspector by telephone for all emergencies.

Work and home phone numbers are listed on the Emergency Notification Form.

6.4.5 The following additional NRC communication links are available in the TSC and EOF:

a.

Health Physics Network (HPN)

- Permits licensee personnel to transmit health physics and environmental information to the NRC the Operations Center.

NRC headquarters may require continuous communication be maintained on the HPN.

b.

Reactor Safety Counterpart Link (RSCL)

C.

Protective Measures Counterpart Link (PMCL)

d.

Management Counterpart Link (MCL)

Any of these communication links may be established by lifting the receiver on the appropriately marked phones and dialing:

1 (301) 816-5100 1

(301) 951-0550 NOTE Each phone can be identified by a label located on the front of the phone.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

8 Agencies and Plant On-Call Emergency Personnel 6.5 Notification of Plant Personnel (CONTROL ROOM ACTIONS) 6.5.1 Plant personnel are notified via PA System concerning the nature and location of event.

6.5.2 Plant personnel are advised via of PA System of emergency actions to be taken concerning event.

6.5.3 If plant conditions require evacuation of plant personnel, notifications/announcements are made in accordance with 10-S-01-11, Evacuation of Onsite Personnel.

For security emergencies, inform all personnel to take

shelter, to NOT move around in the
plant, and to man only those emergency facilities which are necessary and that don't pose a risk to personnel.

6.5.4 After TSC is

operable, PA announcements are made by TSC Communicator.

6.6 Additional Notification of Offsite Agencies 6.6.1 After TSC/EOF activation, hard copies of previous Notification Forms are transmitted to designated Offsite Agencies via the facsimile when time allows.

6.6.2 Within 30 minutes of issuing a Protective Action Recommendation (PAR) r the Emergency Director/Offsite Emergency Cooralnator contacts the Mississippi and Louisiana State Emergency Operations Directors to ascertain the status of the recommended PAR.

6.6.3 Frequent Update

a.

The Emergency Director/Offsite Emergency Coordinator shall ensure that frequent updates are provided to Offsite Agencies as new operational and radiological information becomes available via the Notification Form.

(1)

With the exception of an Unusual

Event, (see Step 6.1.18) the Notification Forms must be filled out and transmitted approximately every 60 minutes, or sooner if information becomes available.

The 60 minutes starts when the communicator begins the notification.

Notification Forms should be numbered consecutively to prevent transmittal sequence errors.

6.6.4 RPM/REM verbally contacts SRAO at least hourly or sooner if plant or radiological conditions change significantly.

a.

Within 60 minutes of exceeding a SPA0 trigger

point, the SRAO should be contacted by telephone.

If the SRAO trigger point results in a PAR, an Emergency Notification Form must be completed in accordance with Section 6.1.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-s-01-6 Revision:

35 Page:

9 Agencies and Plant On-Call Emergency Personnel 6.1 Notification of Plant On-Call Personnel NOTE In the event of Security emergencies, each Security related incident should be evaluated.

Only those support groups and facilities which are needed should be activated, regardless of the emergency or the emergency classification, so as to minimize the risk to personnel.

Utilization of the ERO call tree rather than VIP 2000 may be required to inform responders of emergency situation and prevent manning of unneeded facilities.

6.7.1 Activation of VIP 2000:

NOTE Password and activation instructions are maintained in an envelope labeled "VIP 2000 Activation Instructions",

in the On-Call Notification Book in the Control Room and Technical Manager's Logbook in the TSC.

a.

Activate VIP 2000 by calling 9-437-8155.

b.

Enter VIP 2000 password while the following message is being spoken.

C.

The VIP 2000 says; "Hello, this is the Grand Gulf Nuclear Station's Emergency Notification System."

(1)

If the VIP 2000 says; "There is no activity at this time" and hangs up, you did not enter the password soon enough.

(2)

Return to Step 6.7.la and try.again.

d.

VIP 2000 says; "Enter the scenario number you want to work with."

Enter the correct scenario from the list below:

EMERGENCY CLASSIFICATION SCENARIO(S)

TO BE ACTIVATED Unusual Event 01 Alert 02 Site Area Emerqency 03 General Emerqency 04 TSC & OSC Activation 07 EOF Activation 08

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

10 Agencies and Plant On-Call Emergency Personnel 6.7.1 (Cont.)

e.

VIP 2000 says:

"That scenario is completed/suspended/idle.

Do you want to queue it?

Please press 9 for

Yes, 6 for NO."

(1)

Press 2 to queue scenario.

f.

VIP 2000 says; "Enter scenario

status, press 1 for emergency, 2 for
test, and 3 for drill."

(1)

Press L for emergency, 2 for

test, or 2 for drill.

(2.

VIP 2000 says; "You have requested to start scenario as an emergency/drill/test.

Are you certain this is what you want to do?

Please press 9 for

Yes, 6 for No."

(1)

If

correct, press 2;

VIP 2000 says; "Your request has been honored.

Thank you.

Goodbye."

(2)

If incorrect, press 6; VIP 2000 says; No changes were made with this call."

Return to Step 6.7.l.a NOTE Additional notifications with the VIP 2000 are Required if event is upgraded from an Unusual Event Classification.

No additional notification via VIP 2000 is required if the event is upgraded from an Alert or Site Area Emergency.

h.

If additional notifications are

required, repeat Steps 6.7.la through 6.7.lg.

6.1.2 VIP 2000 Operation Verification Method I

I NOTE There are three different methods to verify that the VIP 2000 is operating.

Only one method is required to be used to verify operation.

The method used is determined by the individual.

a.

Proper operation of the VIP 2000 can be verified by one of the following methods:

(1)

Method I:

(a)

Approximately four to five minutes after activation, the VIP 2000 transmits a *Scenario Execution Log*

report to the Control Room and TSC facsimile.

The report should indicate the date and time the requested scenario went active.

The report should also indicate the mode (Emergency, Drill or Test) the VIP 2000 is operating.

J:\\ADM SRVS\\TECH PUB\\REVISION\\lO\\lOSOl6.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

11 Agencies and Plant On-Call Emergency Personnel 6.7.2 (Cont.)

(b)

If the report does not indicate that the requested scenario is

active, the VIP 2000 is not operating properly.

Go to Step 6.7.3.

Cc)

If in

1)
2)
3)
4)
5)
6)
7) the report indicated the VIP 2000 is operating the wrong
mode, call the VIP 2000 9-437-8155.

Enter the VIP 2000 password while the Hello message is being spoken.

If the VIP 2000

says,
  • Please enter your ID code.*
  • You failed to enter the password in time.*..

Hang up and try again.

When the VIP 2000

says,
  • Enter the scenario number you want to work with.*

Enter the scenario number that was queued in the wrong mode.

The VIP 2000

says,
  • That scenario is active.*

Press 1 to

complete, 2 to suspend or 3 to exit.

a)

Press 1 to complete.

When the VIP 2000

says,
  • You have requested to complete scenario

, are you sure this is what you want to do.

Press 9 for yes and 6

for no.*

a)

Press 9 for yes.

VIP 2000 says

  • that scenario has been completed.

Thank you.

Good-bye.*

Call the VIP 2000 and activate the scenario in the proper mode in accordance with 6.7.1.

(2)

Method II:

(a)

Approximately eight minutes after activation, the VIP 2000 transmits an *Execution Roster Qualified Members Only*

report to the TSC facsimile.

The report should show that positions are being filled and who is filling those positions.

(b)

If the report does not show the positions are being

filled, the VIP 2000 is not operating properly.

Go to Step 6.7.3.

J:\\ADM SRVS\\TECH~PUB\\REVISION\\lO\\lOSOl6.DOC

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-S-01-6 Revision:

35 Page:

12 Agencies and Plant On-Call Emergency Personnel 6.7.2 (Cont.)

(3)

Method III:

(a)

Wait approximately five minutes after activation.

Call VIP 2000 at 9-437-8155, and respond to the VIP 2000 in accordance with Step 6.7.5 using "123456789" as you ID code.

(b)

If the VIP 2000 does not tell you that you are filling your position as Shift Superintendent, the VIP 2000 is not operating properly.

Go to Step 6.7.3.

6.1.3 Back-up Notification Method (Group Page)

a.

If the VIP 2000 operation cannot be verified, initiate the two group pages as follows:

NOTE Initiate both group pages to notify the entire ERO.

Instructions and passwords are maintained in an envelope Labeled "VIP 2000 ACTIVATION INSTRUCTIONS",

in the On-Call Notification Book.

(1)

Call the Group Page Number g-930-8075.

Enter password when requested.

(2)

The recording says:

"This is a display

beeper, please enter your phone number at the sound of the tone."

(3)

At the

tone, enter the appropriate code to activate personnel response:

88*01 Emergency

- Unusual Event 88*02 Emergency

- Alert 88*03 Emergency

- Site Area Emergency 88*04 Emergency

- General Emergency 77*01 Drill

- Unusual Event 77*02 Drill

- Alert 77*03 Drill

- Site Area Emergency 77*04 Drill

- General Emergency (4)

After entering

code, hang up.

The paging system initiates a page to all emergency response organization pagers.

(5)

Call the Group Page number g-930-8074.

Enter the password when requested.

(6)

Repeat step 2,

3, and

4.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-s-01-6 Revision:

35 Page:

13 Agencies and Plant On-Call Emergency Personnel 6.1.4 Other Personnel Notification Method

a.

If the VIP 2000 is inoperative and group paging is unavailable, notification is made by phone or pager to those persons listed on the Emergency

Response

Organization Call Tree located in the On-Call Notification Book or Emergency Telephone Book.

b.

Additional Emergency

Response

personnel should be called as soon as possible to fill additional positions.

Names and telephone numbers of persons in the ERO are in Section B of the Emergency Telephone Book.

Responding to VIP 2000 Phone Call NOTE If you are notified by or call into the VIP

2000, you must respond to the questions asked by the VIP 2000.

It needs to know if and when you can report to your Emergency

Response

Facility to assume your emergency position.

a.

When you answer the

phone, the VIP 2000 says; "Hello, this is Grand Gulf Nuclear Station's Emergency Notification System.

Please enter your ID code."

Enter your social security number.

NOTE If the VIP 2000

says, "You have entered an Invalid ID
Code, and hangs up, call the VIP 2000 back at 437-8155 and try again.
b.

VIP 2000 says; "This is an emergency/a drill/only a test".

NOTE If your position has been

filled, VIP 2000 says:

"Your Position has been filled,"

and hangs up.

C.

If an EMERGENCY has been

declared, or a DRILL is being conducted, VIP 2000 says; "An Unusual Event/Alert/Site Area Emergency/General Emergency has been declared at Grand Gulf,"

and ask you the following questions:

(1)

"Are you fit for duty?

Press 9 for

Yes, 6 for NO."

(a)

If you are fit for duty in accordance with Entergy Procedure OM-105, press 9 for Yes.

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-s-01-6 Revision:

35 Page:

14 Agencies and Plant On-Call Emergency Personnel 6.7.5 (Cont.)

(b)

If you are not fit for duty in accordance with the above instruction, press 6 for No.

(2)

"Enter your estimated time of arrival in four-digit military time."

(a)

Enter estimated time of arrival.

Examples:

4 a.m.

would be entered as 0400 and 4 p.m.

would be entered as 1600.

(3)

VIP 2000 says; "Report to your emergency response facility.

You are filling your Emergency

Response

position as (name of your position),

thank

you, good-bye,"

and hang up.

d.

If a TEST is being conducted, the VIP 2000 asks the following questions:

(1)

"If this were an actual emergency, could you respond?

Press 9 for

Yes, 6 for No."

(a)

If you would be able to

respond, press
2.

(b)

If you would not be able to

respond, press
5.

(2)

"If this were an actual emergency and you were responding, estimate your time of arrival and enter it in four-digit military time.'

(a)

Enter your estimated arrival time.

Examples:

4 a.m.

would be entered as 0400, 4 p.m.

would be entered as 1600.

(3)

VIP 2000 says; "You are filling your Emergency

Response

position as (name of your position),

thank

YOU, good-bye,"

and hang up.

6.1.6

Response

to Pager

a.

When your pager beeps (or vibrates),

depress the read button on the pager.

b.

Observe the telephone number or code displayed in the pager window.

C.

If the telephone

number, 437-8155, is displayed, call this number as soon as possible.

(This is the telephone number for the VIP 2000.)

GRAND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE

Title:

Notification of Offsite No. :

10-s-01-6 Revision:

35 Page:

15 Agencies and Plant On-Call Emergency Personnel 6.8 6.7.6 (Cont.)

d.

If one of the following codes is displayed, respond as indicated in the table below:

CODE MEANING 88-01 Emergency

- Unusual Event 88-02 Emergency

- Alert

RESPONSE

Await further notification.

All personnel report to your emergency response facility.

88-03 Emergency

- Site Area Emergency All personnel report to your emergency response facility.

88-04 Emergency

- General Emergency All personnel report to your emergency response facility.

77-01 Drill - Unusual Event 77-02 Drill - Alert Await further notification.

All personnel report to your emergency response facility.

77-03 Drill - Site Area Emergency All personnel report to your emergency response facility.

77-04 Drill - General Emergency All personnel report to your emergency response facility.

66-06 Test - All Clear This is a test.

No response required.

Records and Information 6.8.1 Forms and paperwork generated by this procedure during EMERGENCIES are retained for information, event reconstruction and submitted to the

Manager, Emergency Preparedness to be filed as a Quality Assurance record.

GRA"ND GULF NUCLEAR STATION EMERGENCY PLAN PROCEDURE 10-S-01-6 Revision:

35 I

Attachment I

Page 1 of 1

PAGING INSTRUCTIONS INDIVIDUAL PAGE A.

On a touch tone

phone, dial the number of the desired pager.

B.

The recording

says, "Please enter the phone number you wished to displayed".

(1)

Immediately following the

tone, dial the number you want displayed on the pager.

C.

The recording

says, "Thank you for calling" and you hear a busy signal.

D.

Hang up telephone receiver.

E.

When pager responds (beeps or vibrates),

verify the number you entered is displayed in the pager window.