ML23332A001 | 28 November 2023 | Public Summary of November 7 Tribal Consultation Response Letter to the NRC | |
ML23317A368 | 6 November 2023 | Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 | |
ML23307A055 | 1 November 2023 | Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 | |
ML23305A050 | 1 November 2023 | NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security | |
ML23274A006 | 1 October 2023 | Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe | |
NRC-2021-0193, Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application | 22 September 2023 | Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application | |
ML23268A360 | 12 September 2023 | Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application | |
ML23226A172 | 10 August 2023 | NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate | |
ML23185A004 | 4 July 2023 | Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf | |
ML23180A299 | 29 June 2023 | Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal | |
ML23180A298 | 29 June 2023 | Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe | |
ML23177A197 | 26 June 2023 | Hermes CP Doc - Public Summary of 6-12-23 Letter from Consulting Tribe | |
ML23173A008 | 21 June 2023 | Hermes CP Doc - Re Consultation Summaries from June 2023 Meetings with Consulting Tribe | |
ML23160A287 | 9 June 2023 | Hermes CP Doc - General and Accident Analysis Audit Reports-Hermes Construction Permit PSAR (Docket Number 05007513) | Safe Shutdown Shutdown Margin Design basis earthquake Annual Radiological Environmental Operating Report Fuel cladding |
ML23157A331 | 6 June 2023 | Hermes CP Doc - Hermes CP Audit Questions 87-91 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 | |
ML23157A330 | 6 June 2023 | Hermes CP Doc - Hermes CP Audit Questions 82-86 and 92-94 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 | |
ML23139A270 | 19 May 2023 | Hermes CP Doc - Presentation for the 5-22-2023 Pre-Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application | |
ML23138A403 | 18 May 2023 | Hermes CP Doc - NRC General Audit Questions-Reactor Fuel, Reactor Vessel, Thermal Hydraulic Design, Reactor Coolant System | Fuel cladding |
ML23132A326 | 12 May 2023 | Hermes CP Doc - NRC Follow-up Emails to Federally Recognized Tribes Re Hermes CP Deis | |
ML23129A772 | 8 May 2023 | Hermes CP Doc - Consultation Update for THC and Tdoa Re Kairos Hermes Test Reactor, Oak Ridge, Tn (Project SHPO0001832) | |
ML23122A293 | 2 May 2023 | Hermes CP Doc - NRC Email to THC - Consultation Update Re - Kairos Hermes CP Review | |
ML23122A292 | 2 May 2023 | Hermes CP Doc - NRC Follow-Up Emails to Federally Recognized Tribes Re Hermes CP Deis | |
ML23115A480 | 25 April 2023 | NRR E-mail Capture - Hermes Audit Reports | |
ML23064A002 | 5 March 2023 | Hermes CP Doc - Information Related to Government to Government Consultations - Section 106 of the National Historic Preservation Act | |
ML23065A058 | 2 March 2023 | NRR E-mail Capture - Preliminary Hermes Construction Permit Application SE Appendix | Safe Shutdown Internal Flooding Earthquake Fire Protection Program |
ML23058A226 | 27 February 2023 | NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Graphite Materials Qualification Topical Report | |
ML23065A010 | 7 February 2023 | NRR E-mail Capture - Remaining Preliminary Chapters of Hermes Construction Permit Application SE | Safe Shutdown High winds Shutdown Margin Ultimate heat sink Non-Destructive Examination Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Design basis earthquake Earthquake Fire Protection Program Power change Coast down Tristructural Isotropic |
ML23036A000 | 2 February 2023 | Hermes CP Doc - (External_Sender) Re (External) Kairos Hermes Environmental Review | |
ML23052A127 | 1 February 2023 | Hermes SE Chapter 4 - (External_Sender) Proprietary Check | |
ML23031A036 | 31 January 2023 | Hermes CP Doc - Consultation Summary | |
ML23006A111 | 14 January 2023 | Hermes PSAR General Audit Questions PSAR Section 6.3 | |
ML23019A050 | 13 January 2023 | NRR E-mail Capture - General Audit Questions for Hermes PSAR Chapter 2 (Site Characteristics) | |
ML23017A081 | 10 January 2023 | Email with Preliminary Chapters of Hermes SE | |
ML23005A107 | 2 January 2023 | Hermes PSAR General Audit Question 1.3.9 Regarding 10 CFR 50.34(a)(8) | |
ML23058A225 | 23 December 2022 | NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Metallic Material Qualification Topical Report | |
ML23006A110 | 16 December 2022 | Hermes SE Chapter 6 - Benjamin Beasley Has Invited You to Work Together in SE Text for Prop Review | |
ML23006A112 | 16 December 2022 | Hermes SE Chapter 4 - Benjamin Beasley Has Invited You to Work Together in SE Text for Proprietary Review | |
ML22297A158 | 18 October 2022 | Email W Elizabeth Toombs - Kairos Cultural Resource Reports Follow Up | |
ML22242A204 | 30 August 2022 | Hermes CP Doc - (External_Sender) (External) Follow-up from NRC-NPS Teams Meeting on Aug 23 | |
ML22227A192 | 8 August 2022 | Final RAI 350 for Air Ingress Into the Primary Heat Transport System | |
ML22220A299 | 8 August 2022 | Hermes CP Doc - NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path | |
ML22227A180 | 8 August 2022 | Final RAI 348 on Shutdown Rod Reliability | Anticipated operational occurrence |
ML22230D076 | 5 August 2022 | Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System | |
ML22224A240 | 29 July 2022 | Hermes CP Application General Audit Question on Load Combinations | |
ML23150A251 | 19 July 2022 | NRR E-mail Capture - Questions on the Tritium Management System (Tms), Pebble Handling and Storage System (Phss), and Spent Fuel Cooling System (Sfcs) for the General Audit | Design basis earthquake |
ML22196A003 | 14 July 2022 | Hermes CP Doc - Confirmation of Plateau Utility Numbers | |
ML22204A004 | 6 July 2022 | Kairos Hermes CP Review - Email from J. Davis to Elizabeth Toombs Cherokee Nation | |
ML22175A150 | 24 June 2022 | Hermes CP Doc - Kairos Hermes CP General Audit Question 5.1-13 | |
ML22167A201 | 16 June 2022 | Hermes CP Doc - Transmittal of Hermes CP SE Section 3.2 | Tornado Missile |
ML22166A324 | 9 June 2022 | Hermes CP Doc - Follow-up Questions on the Inert Gas System for the General Audit |