Hermes CP Doc - NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow PathML22220A299 |
Person / Time |
---|
Site: |
Hermes |
---|
Issue date: |
08/08/2022 |
---|
From: |
NRC |
---|
To: |
NRC/NRR/DANU |
---|
References |
---|
Download: ML22220A299 (3) |
|
|
---|
Category:E-Mail
MONTHYEARML23332A0012023-11-28028 November 2023 Public Summary of November 7 Tribal Consultation Response Letter to the NRC ML23317A3682023-11-0606 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23305A0502023-11-0101 November 2023 NRR E-mail Capture - Response to Kairos Request for Non-Public Documents Related to Security ML23307A0552023-11-0101 November 2023 Hermes CP Doc - (External_Sender) Construction of Kairos Power, LLC, Hermes Non-Power Test Reactor, Ettp - Project SHPO0001832 ML23274A0062023-10-0101 October 2023 Hermes CP Doc - Public Summary of Sep 14 Meeting with Consulting Tribe NRC-2021-0193, Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application2023-09-22022 September 2023 Written Statement from the City of Oak Ridge Tennessee for the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23268A3602023-09-12012 September 2023 Request to Speak Letter from the City of Oak Ridge, Tennessee at the October 19, 2023 Evidentiary Hearing for the Kairos Power, LLC, Hermes Test Reactor Construction Permit Application ML23226A1722023-08-10010 August 2023 NRR E-mail Capture - Hermes Construction Permit Application Mandatory Hearing Resource Estimate ML23185A0042023-07-0404 July 2023 Hermes CP Doc - Submittal of Supplemental Information from Kairos Power_Redacted (8).pdf ML23180A2982023-06-29029 June 2023 Hermes CP Doc - Public Summary of 6-27-23 Email from Consulting Tribe ML23180A2992023-06-29029 June 2023 Hermes CP Doc - FW Email Summary of the April 20 Kairos Submittal ML23177A1972023-06-26026 June 2023 Hermes CP Doc - Public Summary of 6-12-23 Letter from Consulting Tribe ML23173A0082023-06-21021 June 2023 Hermes CP Doc - Re Consultation Summaries from June 2023 Meetings with Consulting Tribe ML23160A2872023-06-0909 June 2023 Hermes CP Doc - General and Accident Analysis Audit Reports-Hermes Construction Permit PSAR (Docket Number 05007513) ML23157A3302023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 82-86 and 92-94 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23157A3312023-06-0606 June 2023 Hermes CP Doc - Hermes CP Audit Questions 87-91 for Preliminary Safety Analysis Report Section 4.5 and Chapter 13 ML23139A2702023-05-19019 May 2023 Hermes CP Doc - Presentation for the 5-22-2023 Pre-Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23138A4032023-05-18018 May 2023 Hermes CP Doc - NRC General Audit Questions-Reactor Fuel, Reactor Vessel, Thermal Hydraulic Design, Reactor Coolant System ML23132A3262023-05-12012 May 2023 Hermes CP Doc - NRC Follow-up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23129A7722023-05-0808 May 2023 Hermes CP Doc - Consultation Update for THC and Tdoa Re Kairos Hermes Test Reactor, Oak Ridge, Tn (Project SHPO0001832) ML23122A2922023-05-0202 May 2023 Hermes CP Doc - NRC Follow-Up Emails to Federally Recognized Tribes Re Hermes CP Deis ML23122A2932023-05-0202 May 2023 Hermes CP Doc - NRC Email to THC - Consultation Update Re - Kairos Hermes CP Review ML23115A4802023-04-25025 April 2023 NRR E-mail Capture - Hermes Audit Reports ML23064A0022023-03-0505 March 2023 Hermes CP Doc - Information Related to Government to Government Consultations - Section 106 of the National Historic Preservation Act ML23065A0582023-03-0202 March 2023 NRR E-mail Capture - Preliminary Hermes Construction Permit Application SE Appendix ML23058A2262023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Graphite Materials Qualification Topical Report ML23065A0102023-02-0707 February 2023 NRR E-mail Capture - Remaining Preliminary Chapters of Hermes Construction Permit Application SE ML23036A0002023-02-0202 February 2023 Hermes CP Doc - (External_Sender) Re (External) Kairos Hermes Environmental Review ML23052A1272023-02-0101 February 2023 Hermes SE Chapter 4 - (External_Sender) Proprietary Check ML23031A0362023-01-31031 January 2023 Hermes CP Doc - Consultation Summary ML23006A1112023-01-14014 January 2023 Hermes PSAR General Audit Questions PSAR Section 6.3 ML23019A0502023-01-13013 January 2023 NRR E-mail Capture - General Audit Questions for Hermes PSAR Chapter 2 (Site Characteristics) ML23017A0812023-01-10010 January 2023 Email with Preliminary Chapters of Hermes SE ML23005A1072023-01-0202 January 2023 Hermes PSAR General Audit Question 1.3.9 Regarding 10 CFR 50.34(a)(8) ML23058A2252022-12-23023 December 2022 NRR E-mail Capture - (External_Sender) Re Transmittal of NRC Staff Draft Safety Evaluation Regarding Kairos Power Metallic Material Qualification Topical Report ML23006A1122022-12-16016 December 2022 Hermes SE Chapter 4 - Benjamin Beasley Has Invited You to Work Together in SE Text for Proprietary Review ML23006A1102022-12-16016 December 2022 Hermes SE Chapter 6 - Benjamin Beasley Has Invited You to Work Together in SE Text for Prop Review ML22297A1582022-10-18018 October 2022 Email W Elizabeth Toombs - Kairos Cultural Resource Reports Follow Up ML22242A2042022-08-30030 August 2022 Hermes CP Doc - (External_Sender) (External) Follow-up from NRC-NPS Teams Meeting on Aug 23 ML22220A2992022-08-0808 August 2022 Hermes CP Doc - NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path ML22227A1922022-08-0808 August 2022 Final RAI 350 for Air Ingress Into the Primary Heat Transport System ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System ML22224A2402022-07-29029 July 2022 Hermes CP Application General Audit Question on Load Combinations ML23150A2512022-07-19019 July 2022 NRR E-mail Capture - Questions on the Tritium Management System (Tms), Pebble Handling and Storage System (Phss), and Spent Fuel Cooling System (Sfcs) for the General Audit ML22196A0032022-07-14014 July 2022 Hermes CP Doc - Confirmation of Plateau Utility Numbers ML22204A0042022-07-0606 July 2022 Kairos Hermes CP Review - Email from J. Davis to Elizabeth Toombs Cherokee Nation ML22175A1502022-06-24024 June 2022 Hermes CP Doc - Kairos Hermes CP General Audit Question 5.1-13 ML22167A2012022-06-16016 June 2022 Hermes CP Doc - Transmittal of Hermes CP SE Section 3.2 ML22166A3242022-06-0909 June 2022 Hermes CP Doc - Follow-up Questions on the Inert Gas System for the General Audit 2023-09-22
[Table view] |
Text
From: Cuadrado de Jesus, Samuel Sent: Monday, August 8, 2022 4:59 PM To: Darrell Gardner; Drew Peebles; Jim Tomkins; Martin Bryan; Nicole Schlichting Cc: Beasley, Benjamin; Chereskin, Alexander; Helvenston, Edward; Schmidt, Jeffrey
Subject:
NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path Darrell, Drew, Jim, Marty, and Nicole, The Request for Additional Information (RAI) below was transmitted as draft on August 2, 2022. Since no changes were made as a result of the clarification call, this RAI is final.
Please respond to this request within 30 days of August 2, 2022.
- Regards, Samuel Cuadrado de Jesús Project Manager Advanced Reactor Licensing Branch (UARL)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION Issue Date: 8/2/2022 Hermes Construction Permit Application Kairos Power, LLC Dockets: 05007513--Hermes Non-Power Test Reactor EPIDS: L-2021-NEW-0011 RAI 339 Section 50.34 of Title 10 of the Code of Federal Regulations (10 CFR 50.34), "Contents of applications; technical information," provides requirements for information to be provided in a Construction Permit (CP). 10 CFR 50.34(a)(4) states that a CP shall contain a preliminary analysis and evaluation of systems, structures, and components (SSCs) provided for mitigation of the consequences of accidents to determine margins of safety during normal operations and transient conditions during the life of the facility.
Section 3.1.1, "Design Criteria," of the Kairos Power (KP) Hermes Preliminary Safety Analysis Report (PSAR) references document KP-TR-003-NP-A, "Principal Design Criteria [PDC] for the Kairos Power Fluoride-Salt Cooled, High Temperature Reactor," Revision 1, to provide the principal design criteria for the Hermes test reactor. KP-FHR PDC 32, "Inspection of the reactor coolant boundary," describes requirements to inspect portions of the reactor coolant boundary. The basis for this PDC states that "the potential for flow blockages/restriction from failed internals (such as graphite reflector blocks) is addressed as part of compliance with PDC 35, 36, and 37, including inspections if appropriate." This indicates that the requirements of PDCs 35, 36, and 37 are applicable to vessel internals as well as other components in the residual heat removal system. PDC 36 states that "[t]he passive residual heat removal system shall be designed to permit appropriate periodic inspection of important components to ensure integrity and capability of the system."
Hermes PSAR, Section 4.3, "Reactor Vessel System," describes SSCs which are needed to maintain the passive residual heat removal path. This pathway is essential to ensure adequate cooling during postulated events where the primary heat transport and primary heat rejection systems are not available.
As such, it is vital that adequate measures be available to assure that the natural circulation flow path will be available if called upon in a postulated event. Section 4.3.3, "System Evaluation," of the PSAR describes how the components in the reactor vessel system meet specific PDCs. However, it does not describe how certain components meet PDC 36. Based on information discussed during the General Audit, the staff understands that the vessel head will have four inspection ports and that Kairos has proposed to confirm the capability of the flow path during operation by monitoring temperature and flow. The staff has the following questions:
- 1. Provide a detail drawing of the natural flow path in the regions above the core.
- 2. It appears that a potential failure of graphite reflector blocks (e.g., debris, geometry changes, etc.)
could cause flow blockages or restrictions of the natural circulation flow path. Where can the flow path be inspected versus where would it need to be verified with flow and temperature monitoring? Can all of the natural circulation flow path that isnt part of forced circulation flow path be inspected?
- 3. Will flow and temperature monitoring be used to verify the functionality of the relatively stagnant natural circulation flow path during normal (pumped) operation? Will flow and temperature monitoring identify the cause of an off-normal condition and the location of potential issues with SSCs? If so, please describe how these will be accomplished.
- 4. Provide the number of fluidic diodes in the Hermes design. In the case of failure of one or more fluidic diodes, how many are needed for adequate passive heat removal?
Hearing Identifier: KairosPower_CPDocs_Public Email Number: 29 Mail Envelope Properties (SA1PR09MB739228CB365075745A690F2D88639)
Subject:
NRC Final Request for Additional Information 339 for Hermes Construction Permit Application Regarding Inspection of Vessel Internals and the Natural Circulation Flow Path Sent Date: 8/8/2022 4:58:46 PM Received Date: 8/8/2022 4:58:00 PM From: Cuadrado de Jesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>
Tracking Status: None "Chereskin, Alexander" <Alexander.Chereskin@nrc.gov>
Tracking Status: None "Helvenston, Edward" <Edward.Helvenston@nrc.gov>
Tracking Status: None "Schmidt, Jeffrey" <Jeffrey.Schmidt2@nrc.gov>
Tracking Status: None "Darrell Gardner" <gardner@kairospower.com>
Tracking Status: None "Drew Peebles" <peebles@kairospower.com>
Tracking Status: None "Jim Tomkins" <Tomkins@kairospower.com>
Tracking Status: None "Martin Bryan" <bryan@kairospower.com>
Tracking Status: None "Nicole Schlichting" <schlichting@kairospower.com>
Tracking Status: None Post Office: SA1PR09MB7392.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4596 8/8/2022 4:58:00 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: