Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24004A20912 December 2023Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code
ML23352A2388 December 202356882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow
ML23212A95024 May 2023Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material
ML21322A05127 October 2021Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A)
ML21295A24718 October 2021Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator ValveDedication package
ML21260A0079 September 2021Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay
L-MT-21-035, Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System7 May 2021Initial and Final Written 10 CFR 21 Notification for GE Hitachi Numac Prnm System
ML19347A42610 December 2019General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C)Post Accident Monitoring
ML19253A05329 August 2019Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19120A10617 April 2019Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19087A25221 March 2019Engine Systems, Inc. - 10 CFR 21 Reportable Notification on Excitation Transformers for Vickers Voltage Regulator System
ML19091A05021 March 2019Engine Systems, Inc. 10 CFR 21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0124, Rev. 0, Excitation Transformers for Vickers Voltage Regulator System
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML19042A08025 January 2019Part 21 Report No. 10CFR21-0124-INT; Rev. 0 - Saturable Reactor (Magnetic Amplifier) for Vickers Voltage Regulator System, P/N 8408218-ESI
ML19024A1647 January 2019Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts KitsCommercial Grade Dedication
Commercial Grade
ML18102A5293 April 201810CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506.Safe Shutdown
ML18087A00321 March 2018Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated)
ML18079A0146 March 2018Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve
ML18075A3556 March 201810 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve
L-MT-18-012, Interim Report of a Deviation or Failure to Comply12 February 2018Interim Report of a Deviation or Failure to Comply
L-MT-18-008, Initial and Final Part 21.21(d)(4) Report Notification of Failure to Comply or Existence of a Defect Regarding Westinghouse Breaker Cubicle1 February 2018Initial and Final Part 21.21(d)(4) Report Notification of Failure to Comply or Existence of a Defect Regarding Westinghouse Breaker CubicleTime of Discovery
ML17212A62824 July 2017Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge ConnectionsAnchor Darling
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML17142A32311 May 2017Interim Report Concerning Supply of Stainless Steel Tubing
L-MT-17-031, Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G120 April 2017Interim Report of a Deviation or Failure to Comply Regarding New Relay Coil GE Part Number 6306774G1
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17039A5693 February 2017Final Part 21 Report on Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
L-MT-17-005, Interim Report of a Deviation or Failure to Comply17 January 2017Interim Report of a Deviation or Failure to Comply
ML16321A45121 October 2016Part 21 Reporting of Defects and Noncompliance
ML16281A27130 September 2016Part 21 - Safety Related Component Welding by an Unqualified Welder
ML16321A45031 August 2016Part 21 Notification - Flowserve Swing Check ValvesAnchor Darling
ML16243A47526 August 2016Part 21 Safety Related Component Welding by an Unqualified Welder
ML16243A47225 August 2016Part 21 Reporting of Defects and Noncompliance
ML16188A37430 June 2016Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies
ML16139A83410 May 2016Electroswitch - Transmittal of 10CFR Part 21 Reporting of Defects and Noncompliance Regarding Vendor Inspection of Electroswitch Corporation Docket No. 99900833
ML16039A2693 February 2016Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna
ML15265A41821 September 2015Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin
ML15211A49724 July 2015Part 21 - Mounting Bracket Seismic Qualification
ML15187A17230 June 2015Interim Part 21 Report - Potential Test Induced Defect in 0867F Main Steam Safety Relief ValvesFlow Induced Vibration
BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays25 June 2015Part 21 Notification Regarding Allen Bradley Model 700RTC RelaysCommercial Grade
ML15162A0239 June 2015Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant
ML15173A0168 June 2015Engine Systems, Inc. - 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0112, Rev. 0, Incorrect Relay Installed in Governor Control Panel, P/N 8002096-PANEL
ML15155A57728 May 2015Part 21 Notification Regarding Allen Bradley 700RTC Relay ConfigurationFitness for Duty
Commercial Grade
ML15134A0171 May 2015Part 21 Report Regarding Potential Test Induced Defect in a 0867F Main Steam Safety Relief ValvesFlow Induced Vibration
ML15103A2446 April 2015Part 21 Report - Deviation of Hk Circuit Breaker Close Latch SpringCommercial Grade Dedication
ML15077A42217 March 2015Curtiss Wright Flow Control Co., Interim Part 21 Report - Potential Test Induced Defect in a 0867F Main Steam Safety Relief Valves
ML15022A65020 January 2015Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities