Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217K43918 October 1999Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,enclSafe Shutdown Earthquake
Design basis earthquake
ML20217H33014 October 1999Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr
ML18152B35412 October 1999Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical InfoVT-2
ML20217C1058 October 1999Forwards Amend 153 to License DPR-3 & Safety Evaluation. Amend Revises TS Section 6.0,Administrative Controls,By Deleting TS Sections 6.2.2.f Which Contains Limits on Working Hours of Plant Staff
ML20216K1681 October 1999Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein
ML20212J9101 October 1999Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later DateVT-2
ML20212J2231 October 1999Forwards Copy of Environ Assessment & Fonsi Re 990317 Application for Amend to Revise TS Section 6.0 by Deleting TS Section 6.2.2.f Which Contains Limits on Working Hours of Plant Staff
ML18152B33927 September 1999Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRCNondestructive Examination
VT-2
ML20212G50922 September 1999Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6)
ML18152B33317 September 1999Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves.Grace period
ML18152B66717 September 1999Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03Generic Fundamentals Examination
ML18152B33416 September 1999Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power StationsNondestructive Examination
VT-2
ML20211N2538 September 1999Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl
ML20211L9151 September 1999Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity
ML18152B4471 September 1999Requests That NRC Remove Listed Labels from Distribution
ML20211J50031 August 1999Forwards Proposed Rev 29 to Yankee Decomissioning QA Program, for NRC Info & Approval.Yaec Requests That Rev 29, Dtd May 1999 & Originally Transmitted in Be Withdrawn from Further Consideration by NRC Staff
ML20211J22131 August 1999Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl
ML20211J27127 August 1999Forwards Amend 152 to License DPR-3 & Safety Evaluation. Amend in Response to Application Dated 990324,deletes License Condition 2.C (10) Which States: Licensee Shall Maintain FFD Program IAW Requirements of 10CFR26Fitness for Duty
ML20211H41327 August 1999Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint
ML20216F18926 August 1999Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat
ML20138B32423 August 1999Forwards Draft Response to Question 1 Re NAPS USI A-46Earthquake
ML20211D90420 August 1999Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 SubmittalHigh Radiation Area
Hydrostatic
VT-2
ML20211B38717 August 1999Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project
ML20210T06713 August 1999Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation
ML20210Q98412 August 1999Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13
ML20210S06210 August 1999Forwards semi-annual fitness-for-duty Program Performance Data for six-month Period of 990101-990630,IAW 10CFR26.71(d)Fitness for Duty
ML20210Q7666 August 1999Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas
ML18152B4086 August 1999Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves.Loop seal
Stroke time
ML18152B4095 August 1999Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d)Fitness for Duty
ML20210N2925 August 1999Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits
ML20210R1424 August 1999Forwards Insp Rept 50-029/99-02 on 990411-0714.One Severity Level 4 Violation Occurred,Being Treated as NCV
ML20210J8862 August 1999Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate
ML20210F61228 July 1999Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal
ML18152B39726 July 1999Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02
ML20210F36921 July 1999Submits Response to NRC Request for Clarification of Certain Details of Yaec Proposed Mods to Yankee Nuclear Power Station Defueled TS
ML20209D4889 July 1999Forwards Rev 29 to Decommissioning QA Program, for Info & NRC Approval,Iaw 10CFR50.54(a)(3).Attachment a Provides Listing of Changes,But Does Not Discuss All Refomatting, Grammatical,Editorial or Typographical ChangesNondestructive Examination
Condition Adverse to Quality
Liquid penetrant
ML20209E7629 July 1999Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass LinesPacking leak
Pressure Boundary Leakage
05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl8 July 1999Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl
ML20209E3712 July 1999Forwards Insp Repts 50-338/99-03 & 50-339/99-03 on 990425-0605.Violations Being Treated as Noncited Violations
ML20209C3271 July 1999Forwards Rev 2 to Security Training & Qualification Plan.Rev Withheld
ML20209C3151 July 1999Forwards Rev 9 to Security Plan,Reflecting Plant Decommissioning Activities & Continues to Provide Protection Against Radiological Sabotage.Rev Withheld
ML18152B4401 July 1999Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co
ML20209D16128 June 1999Forwards UFSAR for Ynps.Updated Ynps FSAR Is Being Submitted Biennially,Iaw Commitment in Ltr Dtd 950614.Document Reflects Changes Made to Ynps as of 981231,unless Otherwise NotedSafe Shutdown
ML18152B43724 June 1999Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary ConnectionsHigh Radiation Area
Hydrostatic
VT-2
ML20196G25823 June 1999Discusses Closure of GL 92-01,rev 1,suppl 1,reactor Vessel Structural Integrity
ML20196F11522 June 1999Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program
ML18152B43622 June 1999Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06Design basis earthquake
ML20212J29522 June 1999Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS
ML20196G22121 June 1999Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,IncludedGrab sample
ML20195J70115 June 1999Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP