ML20217N390 | 25 October 1999 | Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure | |
ML20217M757 | 22 October 1999 | Advises That Attachment 1 to ,Marked as Proprietary,Re Safety Limit MCPR & Fuel Vendor Change Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) | Minimum Critical Power Ratio |
ML20217L859 | 21 October 1999 | Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation | |
ML20217N552 | 21 October 1999 | Forwards Operator Licensing Exam Rept 50-331/99-302(OL) for Tests Administered During Wk of 990920.Six Applicants Passed All Sections of Exam & Were Issued Operating Licenses | |
SVP-99-181, Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 | 20 October 1999 | Forwards Biennial Update to Quad Cities Ufsar,Iaw 10CFR50.71(e).Update Includes Changes to Facility & Procedures & Are Current Through 990630 | |
ML20217M210 | 19 October 1999 | Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates | |
ML20217M663 | 19 October 1999 | Forwards Insp Rept 50-277/99-07 & 50-278/99-07 on 990920.No Violations Noted | |
ML20217M118 | 19 October 1999 | Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates | |
ML20217M185 | 19 October 1999 | Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates | |
BSEP-99-0170, Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) | 19 October 1999 | Forwards Proprietery Notification of Change in Operator Status.Individual Name,Docket Number,License Number & Effective Date of Expiration,Encl.Proprietary Info Withheld, Per 10CFR2.790(a)(6) | |
ML20217H892 | 18 October 1999 | Forwards SER Accepting Eight of Licensee Relief Requests, NDE-R001,(Part a & B),NDE-R027,NDE-R028,NDE-R029,NDE-R030, NDE-R032 & NDE-R035,one Request Relief NDE-R036,denied & Relief Request NDE-R034 Unnecessary | |
ML20217H466 | 18 October 1999 | Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl | |
ML20217H847 | 18 October 1999 | Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs | |
ML20217K844 | 15 October 1999 | Submits Revised Commitment to NRC Bulletin 90-01,Suppl 1 for Hope Creek Generating Station | |
JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 | 15 October 1999 | Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 | |
ML20217F480 | 14 October 1999 | Provides Individual Exam Results for Applicants Who Took Sept 1999 Initial License Exam.Informs That Info Considered Proprietary & That Listed Info,Supplements & Exam Rept Will Be Issued Shortly | |
ML20217K924 | 14 October 1999 | Forwards Amend 234 to License DPR-56 & Se.Amend Consists of Changes to TS in Response to Application & Suppls ,1001 & 06,which Will Support PBAPS Mod P00507,which Will Install Digital Pr Neutron Mining Sys | |
ML20217F739 | 14 October 1999 | Requests Addl Info Re Peach Bottom Atomic Power Station Units 2 & 3 Appendix R Exemption Requests | Safe Shutdown Exemption Request |
ML20217H977 | 13 October 1999 | Forwards SRO & RO Initial Exam Rept 50-354/98-302,suppl Rept on 990125-29,mtg Meeting on 990322,990429-30 & 0617-18 in-office Review & 990720 Telcon on Appeal Results.Overall, 11 of 16 Applicants Received NRC Licenses | |
ML20217F684 | 13 October 1999 | Forwards Senior Reactor Operator Initial Exam Repts 50-277/99-302(OL) & 50-278/99-302(OL) Conducted on 990913- 16.All Applicants Passed All Portions of Exam | |
JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping | 13 October 1999 | Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping | |
BSEP-99-0161, Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 | 13 October 1999 | Submits Response to NRC RAI Re Relief Request VRR-03.VRR-03 Requested Relief from full-stroke Open Exercise Requirements for Supply Check Valves to air-operated Valves 1(2)-RNA-V313,1(2)-RNA-V314,1(2)-RNA-V350 & 1(2)-RNA-V351 | |
ML20217D971 | 13 October 1999 | Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure | |
ML20217K701 | 13 October 1999 | Provides Response to Questions Related to Request for License Amend,Per 10CFR50.90, Credit for Containment Overpressure. Supporting Calculations Encl | |
ML20217D290 | 13 October 1999 | Forwards SER Accepting Licensee 990305 Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation | |
ML20217F126 | 12 October 1999 | Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 | Safe Shutdown |
ML20217F302 | 12 October 1999 | Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at PBAPS Have Been Completed.Ltr Also Confirms Completion of Actions Required by Confirmatory Order Modifying Licenses, | Safe Shutdown Fire Barrier |
05000254/LER-1999-004, Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action | 12 October 1999 | Forwards LER 99-004-00,IAW Requirements of 10CFR50.73(a)(2)(i)(B).Util Is Committed to Listed Action | |
BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station | 8 October 1999 | Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station | |
JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon | 8 October 1999 | Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon | Safe Shutdown Earthquake Operating Basis Earthquake Squib Design basis earthquake Earthquake Backfit |
ML20217G119 | 8 October 1999 | Informs That on 990930,NRC Staff Completed mid-cycle PPR of Brunswick NPP & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next Five Months | |
ML20217E745 | 8 October 1999 | Forwards Response to NRC 990820 RAI Concerning Proposed Alternatives Associated with Third ten-yr Interval ISI Program for Pbaps,Units 2 & 3 | Hydrostatic VT-2 |
NG-99-1405, Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request | 8 October 1999 | Informs That Util Has Completed Addl Review to Ensure That All Related Requirements for Repair/Replacements Have Been Addressed,Per Util Requesting Approval of Several Inservice Insp Relief Request | |
NG-99-1383, Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs | 8 October 1999 | Forwards Response to NRC 990930 RAI on TS Change Request TSCR-010 Re Excess Flow Check Valve SRs | Maintenance Rule Program |
ML20217F722 | 7 October 1999 | Forwards Insp Rept 50-331/99-11 on 990820-0930.No Violations Noted | Power change |
ML20217F632 | 7 October 1999 | Forwards Insp Repts 50-254/99-01 & 50-265/99-01 on 990721- 0908.No Violations | |
05000254/LER-1999-003, Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee | 7 October 1999 | Forwards LER 99-003-00 IAW 10CFR73(a)(2)(v)(A).Commitment Made by Util,Listed.Any Other Actions Described in LER Represent Intended or Planned Actions by Licensee | |
ML20217G263 | 7 October 1999 | Informs That on 990930,NRC Staff Completed mid-cycle PPR of Hatch Plant & Did Not Identify Any Areas Where Performance Warranted More than Core Insp Program.Regional Initiative Insps to Observe Const Activities Will Be Conducted | |
ML20217G040 | 7 October 1999 | Forwards Insp Repts 50-321/99-09 & 50-366/99-09 on 990607-11 & 0823-27.One Violation Occurred Being Treated as NCV | |
ML20217C150 | 7 October 1999 | Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant | |
ML18107A556 | 7 October 1999 | Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests | Coatings Moisture barrier Dissimilar Metal Weld |
ML20217C439 | 6 October 1999 | Informs That Util Authorized to Administer Initial NRC Retake Written Exam to Applicant Listed,During Week of 991011 | |
ML20217C414 | 6 October 1999 | Forwards Response to NRC 981109 RAI Re Resolution of USI A-46 for Pbaps.Proprietary Excerpts from GIP-2,Ref 25 Results of BWR Trial Plant Review Section 8 Also Encl. Proprietary Excerpts Withheld | Safe Shutdown Safe Shutdown Earthquake Coatings Operating Basis Earthquake Seismically rugged Earthquake Backfit |
ML20217B915 | 6 October 1999 | Provides Clarifying Info to Enable NRC to Complete Review of License Change Request ECR 98-01802,re Changes Necessary to Support Installation of Digital Pr Neutron Monitoring & Incorporate long-term T/H Stability Solution Hardware | |
ML20217B770 | 6 October 1999 | Submits Corrected Info to NRC 980528 RAI Re Util Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions | |
BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl | 6 October 1999 | Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl | |
ML20217C693 | 6 October 1999 | Forwards Insp Repts 50-324/99-06 & 50-325/99-06 on 990801- 0911 at Brunswick Reactor Facility.No Violations Were Identified | |
ML20212L041 | 5 October 1999 | Informs That Privacy Info Identified in Util Re Duane Arnold Energy Center Emergency Telephone Book,Rev 61 Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(a)(6) & Section 103(b) of Atomic Energy Act | |
NG-99-1358, Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included | 5 October 1999 | Forwards DAEC plant-specific Response to 990927 RAI Re TS Change Request on Excess Flow Check Valve Surveillance requirements.TSTF-334,included | Incorporated by reference Maintenance Rule Program |
ML20212K942 | 5 October 1999 | Informs That NRC Accepts 990513 Inservice Inspection Relief Request CR-31 for Quad Cities Nuclear Power Station,Units 1 & 2 |