ST-HL-AE-5087, Monthly Operating Repts for Apr 1995 for South Texas Project Electric Generating Station

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1995 for South Texas Project Electric Generating Station
ML20083M958
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/30/1995
From: Groth J, Hill R
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ST-HL-AE-5087, NUDOCS 9505220144
Download: ML20083M958 (14)


Text

- -

s b-The Light cg,o mp a ny  ;

South g p, Texas Project Electric Generating station P. O. Box 289 Wadsworth, Texas 77483 May 15, 1995 ST-HL-AE-5087 File No.: G02 10CFR50.71 j l

l l

U. S. Nuclear Regulatory Commission l Attention: Document Control Desk Washington, DC 20555 l

l South Texas Project l Units I and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operatinn Reports for April 1995 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for April 1995.

If you should have any questions on this matter, please contact Mr. S. M. Head at (512) 972-7136.

l l

1 r

' . F. roth M

Vice President, l Nuclear Generation l

l MKJ/lf Attachments: 1) STPEGS Unit 1 Monthly Operating Report - April 1995

2) STPEGS Unit 2 Monthly Operating Report - April 1995 Project Manager on Behalf of the Participants in the South Texas Project ,

wsoms.m ooi D 9505220144 950430 g PDR ADOCK 05000498

_ _ _ _ _ ___ _ ___ _ 3 1________ _ __ _ _ PCR

e E ,s ,

i ,

Houston Lighting & Pcwer Conipany ST-HL-AE-5087-84uth Texas reject Electric Generating Stat.ion

' File & - G02 Page 2  ;

c:

Leonard J. Callan Rufus S. Scott Regional' Administrator, Region IV Associate General Counsel U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 '

Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager Operations - Records Center ,

U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 13H15 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie Sr. Resident Inspector 50 Bellport Lane c/o U. S. Nuclear Regulatory Comm. Bellport, NY l1713 P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff Bureau of Radiation Control J. R. Newman, Esquire Texas Department of Health Morgan, Lewis & Bockius 1100 West 49th Street 1800 M Street, N.W. Austin, TX 78756-3189 Washington, DC 20036-5869 U. S. Nuclear Regulatory Comm.

K. J. Fiedler/M. T. Hardt Attn: Document Control Desk ,

City Public Service Washington, D. C. 20555-0001 P. O. Box 1771 J San Antonio, TX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire j City of Austin Egan & Associates, P.C.  !

Electric Utility Department 2300 N Street, N.W.

721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 C. A. Johnson

' Central Power and Light Company P. O. Box 289, Mail Code: N5012 '

Wadsworth, TX 77483 l

i

. i

.E; l .. *.

?'

i 1

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 '

NONTELY OPERATING REPORT APRIL 1995 ,

ROUSTON LIGRTING AND POWER CO.

NRC DOCKET NO. 50-498 '

LICENSE NO. NPF-76 Reviewed By: [aCd4J 0 d IDlhb D/M. bgg Q L Ddte / .

Reviewed By:

F. II. MALLEN Of' T Ib!4[

Date

~

'i Approved By: M N Nh L. W. MYERS C S!//

Dhte 3 ,

t

l .

Monthly Sumunary STPEGS Unit 1 began the reporting period shutdown for refueling and scheduled maintenance.

The unit was returned to service on 4/14/95 at 1845. Power ascension tests were completed and 100% reactor power was achieved on 4/20/95 at 0814.

The unit operated for the remainder of the reporting period with no unit shutdowns or significant power reductions.

t I

OPERATING DATA REPORT  !

DOCKET NO. 50-498 UNIT 1 ,

DATE May 8, 1995  !

COMPLETED BY R,L. Hil1 {

TELEPHONE 512/972-7667 OPERATING STATUS

1. REPORTING PERIOD: 04/01/95-04/30/95 GROSS HOURS IN REPORTING PERIOD: 719
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt) : 3800 MAX. DEPEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 i
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) : None
4. REASONS FOR RESTRICTION (IF ANY): N/A

'I THIS MONTH YR TO DATE CUMULATIVE-

5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 448.8 1906.0 35858.9  !
6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0
7. HOURS GENERATOR ON LINE.................. 389.3 1818.0 34585.4
8. UNIT RESERVE SHUTDOWN HOURS.............. 0 0 0 t
9. GROSS THERMAL ENERGY GENERATED (MWt).... 1266206 6525787 126347768  !
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 429440 2242522 42897482
11. NET ELECTRICAL ENERGY GENERATED (MWH).... 407942 2144541 40655493 i
12. REACTOR SERVICE FACTOR................... 62.4% 66.2% 61.2%'
13. REACTOR AVAILABILITY FACTOR.............. 62.4% 66.2% 61.2%
14. UNIT SERVICE FACTOR......................___54.1% 63.1% 59.1%
15. UNIT AVAILABILITY FACTOR................. 54.1% 63.1% 59.1%
16. UNIT. CAPACITY FACTOR (Using MDC)......... 45.4% 59.6% 55.5%
17. UNIT CAPACITY FACTOR (Using Design MWe).. 45.4% 59.6% 55.5
18. UNIT FORCED OUTAGE RATE.................. 0.0% 3.2% 29.3%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

N/A

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l

i l

4

- - - - - ~ -- ~ - - , , , w- - . ~ , n- --r .--s.

I

,. ?,' _.  !

J

+

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE May 8, 1995 COMPLETED BY R.L. Hill i' TELEPHONE 512/972-7667 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

-(MWe-Net) (MWe-Net) 1 0 17 843 2 0 18 774 3 0 19 910 4 0 20 1247 5 0 21 1258 6 0 22 1260 7 0 23 1259 8 0 24 1262 9 0 25 1263 10 0 26 1263 11 0 27 1261 12 0 28 1263 13 5 0 29 1261 14 0 30 1262 15 181 31 N/A 16 433 ,

i l

a- ..

UBIIT. SIBITDOIRIS AHD POIESR REDUCTICIIS e:-~c, DOCKET NO. 50-498 UNIT 1

  • DATE May 8, 1995 COMPLETED BY -R.L, Hi11 TELEPHONE 512/972-7667
  • REPORT MONTH APRIL 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event: Code Code Prevent Recurrence j Down Report #

Reactor 95-07 950304 S 329.7 C 4 'N/A N/A N/A Refueling and scheduled maintenance outage.

1 2- 3 4 . 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage

F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other'

.i

_ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . - . _ . ~ . . - . . . . .- . _ .- _ . . __ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ .. _ _ _ _ . _ _ _ _ . _ . _ _

2-PORVs and Safety Valves 8"- W There were no PORV or Safety Valves challenged during the reporting period.

  • ^*

1 j

P SOUTE TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTELY OPERATING REPORT APRIL 1995 MOUSTON LIGHTING AND POWER CO.

NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 '

o Reviewed By: GM{A l h D." M. g GENDAHL 10 Dhte I

Reviewed By: / 4e h_'

LEf ' ~ '

7![o Dhte'

!fj" Approved By: 4 -

M-t- /I R.'E. MASSE Dath l

I

Monthly summaary STPEGS Unit 2 began the reporting period operating at approximately 87%

reactor power with ascension to 100% in progress following recovery from a '

reactor trip on 3/28/95. The unit achieved full power on 4/1/95 at 0338.

On 4/3/95 at 1936 reactor power was reduced to 75% to allow repair of an electro-hydraulic control oil leak on the low pressure governor valve actuator of Steam Generator Feedwater Pump Turbine 22. Maintenance was completed and the unit was returned to full power on 4/4/95 at 0307.

The unit operated for the remainder of the reporting period with no unit shutdowns or significant power reductions.

1 l

i

a OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 2 DATE May 8, 1995 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 OPERATING STATUS

1. REPORTING PERIOD: 04/01/95-04/30/95 GROSS HOURS IN REPORTING PERIOD: 719
2. CURRENTLY AUTHORIZED POWER LEVIL (MWt) : 3800 MAX. DEPEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 719.0 2821.3 32858.1
6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 l
7. HOURS GENERATOR ON LINE.................. 719.0 2008.6 31641.3
8. UNIT RESERVE SHUTDOWN HOURS.............. 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWt).... 2736514 10650438 115430934
10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 942860 3677981 39135851
11. NET ELECTRICAL ENERGY GENERATED (MWH).... 901557 3522233 37248488
12. REACTOR SERVICE FACTOR................... 100.0% 98.0% 63.9%
13. REACTOR AVAILABILITY FACTOR.............. 100.0% 98.0% 63.9%
14. UNIT SERVICE FACTOR...................... 100.0% 97.6% 61.5%
15. UNIT AVAILABILITY FACTOR................. 100.0% 97.6% 61.5%
16. UNIT CAPACITY FACTOR (Using MDC)......... 100.3% 97.8% 57.9%
17. UNIT CAPACITY FACTOR (Using Design MWe).. 100.3% 97.8% 57.9%
18. UNIT FORCED OUTAGE RATE.................. 0.0% 2.4% 28.8%
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Scheduled 45 day refueling outage to begin on October 7, 1995.

20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A l

l 1

l

e-

, )
  • AVERAGE DAILY UNIT POWER LEVEL DOCKET NO, 50-499 UNIT 2 DATE May 8, 1995-COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1239 17 1266 2 1258 18 1265 3 1172 19 1265 1

4 1247 20 1266 S 1255 21 1265 l

6 1247 22 1264 7 1249 23 1266 .

l 8 1256 24 1268 l 9 1226 25 1266 10 -1228 26 1267 11 1236 27 1266 12 1233 28 1266 13 1254 29 1266 14 1266 30 1266 15 1266 31 N/A 16 1267 i

e s_ :. .

UNIT SEUTDOOMS AND POWER REDUCTIOMB *'..

DOCKET NO. 50-499-UNIT 2 '*-

DATE May 8, 1995

.CCMPLETED BY R.L. Mill

+

TELEPHONE 512/972-7667 REPORT MONTH APRIL 1 .. 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action-to' (Hours) Shutting Event ~ Code Code Prevent Recurrence Down Report #

Reactor 1

95-03 950403 F 0.0 A 5 N/A SJ V Reactor power reduced to 75% to allow repair of an electro-hydraulic control oil leak on the low pressure governor valve actuator of Steam Generator Feedwater Pump Turbine 22.

I 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-19A' IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

_ . -- .,. - , . - , . ... _ ~ . _ - _ _ - _ _ - _ _ - _ _ _ . _ _ _ _ _ - . . _. _~

3

. 's s

PORVs and Safety Valves Susumary There were no PORV or Safety Valves challenged during the reporting period.

l l

l