MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
_ _.
. The Light company llouston Lighting & PowerI ""'h "" "5"' '3""I' ""'""'i"O'"" # ""' # **d*""I"" # #
September 13, 1991 ST.HL AE 3872 File No.: 002 10CFR$0.71 U. S. Nuclear Regulatory Connission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Units 1 & 2 Docket Hos. STN 50 498 6 50 499 Monthly Operatinr. Reports for August. 1991 Pursuant to 10CFR50.71(a) and South Texas Project Elcet ric Generating Station (STPECS) Technical Specification 6.9.1.5, attached are the Monthly -
Operating Reports for August, 1991. j 11 you should have any questions on this matter, please contact
, Mr. C. A. Ayala at (512) 972 8628.
Q) .
William J. Jump Manager Nuclear Licensing MKJ/sgs At ta::hments : 1) STPECS Unit 1 Monthly Operating Report August, 1991
- 2) STPECS Unit ? Monthly Operating Report - August, 1991 br o 91o933 4 [hK05000ang PDR L RREP\91071001.1&2 A Subsidiary of flouston ludusMies incorporated
c .-
i ST ilL AE 3872
'llouston Lighting & Parr Cotopany Pile No. :002 South Tcsas Project 1Intric Generating Station Page 2 I
cci l
)
Regional Administrator, Region IV Rufus S. Scott j Nuclear Regulatory Commission Associate General Counsel- {
611 Ryan Plaza Drive, Suite 400 llouston Lighting 6 Power Company j Arlington, TX 76011 P. O. Box 61867 l llouston. TX 77208 !
Ceorge Dick, Project Manager !
IL S. Nuclear Regulatory Commission INPO l Washington, DC 20$55 Records Center l 1100 Circle 75 Parksay i J.-1. Tapia Atlanta, CA 30339 3064 !
Senior Resident Inspector .
c/o U. S. Nuclear Regulatory Dr. Joseph H. llendrie - '
Coramission 50 Bc11 port Lane P. O. Box 910 -Bellport, NY 11713 ,
Bay City,-TX. 77414 !
D . K . 1,ad e r .i J. R. Newman, Esquiro Sureau of Radiation Control -i 13ewman & iloitzinger, P.C, Texas Department of 11ealth j 1615 L Street, N.V. 1100 West 49th Street !
Washington, DC 20036 Austin, TX 78756 3189 -!
D. E,. Ward /T M. Puckett !
Contral Power and Light Company. [
P. 0.-Box,'2121 ;
Corpus Christi, TX 78403 !
J. C.-Lanier/M. B. Lee .
1 City of Auntin j Electric Utility Department l
~P.O. Box 1088
- Austin, TX 78767 K. R. Fiedler/M T. liardt f City Public Service Board i P. O. Box 1771 -f
. San Antonio, TX 78296 i f
I i
L:
P i 1
- I l .
i
- Revised 09/06/91 !
t U
u '
. IA/NRC/_
, , , ,m,-.L...._.-_-_,-...,.,,..,,,..,-... . . - . , , . . - _ - . . . . . . ..._ ..-... _ ._ _ .-__.._2- - - . - . . _ _ -
e I
i
(
l l
SOUTl! TEXAS PROJECT ELECTRIC GENERATING STATION t UNIT 1 f HONTIILY OPERATING REPORT AUGUST 1991 i-Il0USTON LIGl! TING AND POWER CO.
NRC DOCKET NO. 50-498 [
}
LICENSE NO. NPF-80 f
b 9 - % 'I i Rn"leved (
Supervisor Date -
@NviewedBy: u b -r~' N[l M Plant EUg[neering lianager Dato i Approved By: A1Xf-k $ b bl Plant $ nag'er i
\) Date i
i r
i l $
I l
l 1
l l
r I
i 4 .
i Monthly Sutumary l
i i
STPEGS Unit 1 began t.he reporting period at 100% reactor power. On 8/20/91 l reactor power was reduced to allow oil to be added to both 1A and ID RCP upper l oil reservoirs. The remaining purap oil levels were checked. The unit was returned to full power on 8/21/91.
The unit concluded the reporting at 1004 reactor power.
l l .
_ _ _ '_.i-____.- - - _ _ --...~-_,1 . . . . _ . . , _ - . . . . . , , , _
s OPERATING DATA REPORT DOCEET NO 50 498 UNIT I DATE k.pg 5. 1991 COMPLETED BY A1 P. Eent TELEM10NE )12/972 7786 OPERATING STATUS
- 1. REPORTING PERIOD: 08/0108/31 GROSS 110VRS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUT110R1 ZED POWER LEVEL (MWe): 3P00-MAX. DEPEND. CAPACITY (MWu. Net): __1250.6 DESIGN ELECTRICAL RATING (MWe Net): _1250.6_ ,
- 3. POWER LEVEL TO WilICil R?STRICTED (IF ANY)(MWe Net): Hnnt
'4 REASONS FOR RESTRICTION (IF ANY): N/A TilIS MONTH YR TO DA'lE CUMULATIVE
- 5. ' NUMBER OF ll0URS REACTOR WAS CRITICAL.,... 744,Q 359?J 17373.6
- 6. REACTOR RESERVE SHUTDOWN ll0URS... ....... p ,
0 0
- 7. Il0URS GENERATOR ON LINE.................. 744.0 3470.9 _,,16620.3
- 8. UNIT RESERVE SilUTDOWN 110URS . . . . . . . . . . . . . . 0 0 0
- 9. GROSS THE'1 MAL ENERGY GENERATED (MWt) . . . . 2782043 12769(22.1 60447901
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWil) . .E7660 ,_ 43081?Q ,_,,20405610
- 11. NET' ELECTRICAL ENERGY GENERATED (MVil).... 894323 40PJ1Q 19191293
- 12. REACTOR SERVICE FACTOR.................. 100.01 61.6% 65.7%
- 13. REACTOR AVAILABILITY FACTOR............. 100.0% 61.6% 65.7%
i 14.: UNIT SERVICE FACT 0R..................... 100.0t C9.7% 62.8,1
- 15. UNIT AVAILABILITY FACTOR. . . . . . . . . . . . . . . . 100. 0% .
54.74 62.8%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 96.1% 55.8% $ 8 . 0.1
- 17. UNIT. CAPACITY FACTOR (Using Design MWo).. 96.1% 55.8% 58.Q3
- 18. UNIT FORCED OUTAGE RATE.................. 0.04- 11.3% 14.7%
- 19. SHUTDOWNS SCllEDU" : D OVER NEXT 6 MONTilS (TYPE. DATE, t.ND DURATION OF EACH):
N/A
- 20. IF SMUT-DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF ATARTCP: N/A
l r
AVERAGE DAILY UNIT POWER LEVEL 4
DOCKET NO. 50 448 j UNIT 1 DATE Sen. 5. 1991 i f
COMPLETED BY A. P. Kent TELEPil0NE 512/972 7786 [
t t
i MONTH AUGUST l
t i
DAY AVERAGE DAILY POWER ltVEL DAY AVERAGE DAILY POWER LEVEL l (MVe Net) (MVe. Net) j 1224 17 1232 1
2 1220 18 1231 !
3 1224 19 1203 l r
4 122$ 20 424 l
$ 1228 21 1215 6- 1228 22 1228 l
7 1228 23 121p _
B 1229 24 1230 t 9 1230 25 1232 10 1230 26 1233 -p r
11 1229 27 1234 ,
I 12 __ 1229 28 1233 i
_ _ - 13_ 1229 29 1232 , ;
i 14 1231 30 1229 F 15 1233 31 1229
-16 1234 f i
t
' ---,Yw, +--w, ,._-,-,,---r--w-- E- s --
. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Sen. 5. 1991.
COMPLETED BY . A . P. Kent TELEPHONE 512/972-778A' REPORT MONTH AUGUST l' l 2 3 4 5.
No. Date ' Type Duration. Reason Method of Licensee System Component Cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report a Reactor 91-06, 910820 F 0.0 B 5 N/A AB P Reactor power was redaced to allow for oil replenishment of the 1A and 1B Reactor Coolant Pump upper oil reservoirs. The remaining pump oil levels were checked.
l 1
1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Re fueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exa:n Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other i H-Other (Explain)
, . . ~ . . _ . _ . , - , _ _ . _ _ , . _ . . . . _ . _ . . . - . _ . - . _ _ . . _ , _ _ _ . _ . . . _ . . .__ . - , _ . _ _ _ _ , . _ _ .
k ,
aw l
- N Tliere were no l'ORV or Safety valves clialleur,ed (WtW, O W
a SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONillLY OPERATING REPORT AUGUST 1991 It0USTON LICETING AND POWER CO.
NRC DOCKET No. 50 499 LICENSE NO. NPF 80 Reviewedjd v < [
/ % .- 9- 5 -9 i Supervisor Date Review)dBy: _
- j/[/)/
PlantingineerudManager Dde Approved By: A1ks -
x ~
S (> \
Plah da:I ager \ Q Date l
l
Menthly Summ ry STPEGS Unit 2 operated during the reporting period with no unit shutdowns or significant power reductions.
o
d i
OPERATING DATA REPORT i
DOCKET NO. 10 499 l UNIT 2 l DATE Sep. 5. 1991 COMPLETED BY A P Ment . ;
TELEPil0NE 512/972-7786 OPERATING STATUS l
- 1. REPORTING PERIOD: 08/01 08/31 CROSS Il0URS IN REPORTING PERIOD: 744- l
- 2. CURRENTLY a.UT110RIZED POWER LEVEL (MVL): 3890 !
MAX. DEPEND. CAPACITY (MWe Net): _1250.6-- ;
DESIGN ELECTRICAL RATING (MWe. Net): 1250.6 ;
- 3. _ POWER LEVEL TO VillCil RESTRICTED (IF ANY)(MWo Net): None-
- 4. REASONS FOR RESTRICTION (IF ANY): N/A t
Tills MONTl! YR TO DATE CUMUIATIVE l t
- 5. NUMBER =OF ll0URS REACTOR WAS CRITICAL....._,74h D 5678 h 14659.8 l 5
6 REACTOR RESERVE SilUTDOWN 1100RS. . . . . . . . . . . O _D 0 7.- HOUR S G EN EKATOP. ON LI N E . . . . . . . . . . . . . . . . . . 744.0 5575.9 13921.6 }
- 8. UNI P RESERVE SilUTDOWN 110URS . . . . . . . . . . . . . . 0 0 0
- 9. GROSS THERMAL ENERCY GENERATED (MWt).... 2837741 20957620 50662888 .j
- 10. CROSS ELECTRICAL ENERGY CENERATED (MWH)... 953350 , 7094280 _ 17116750 f
- 11. NET ELECTRICAL ENERGY CENERATED (MW}l) . . . . 911314 6776714 16225494
- 12. _ REACTOR S ERVICE FACTOR . . . . . . . . . . . . . . . . . ._1.00. 01 97.4% ls Q1 l
- 13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . . 100.0% 97.4% 76.0% !
- 14. UNIT S ERVICE FACTOR . . . . . . . . . . . . . . . . . . . . . 100. 0 % 95.6% 72.11 v
t 15, UNIT AVAILABILITY FACTOR................. 100.0% 95.6% -72.1%
i
- 16. UNIT CAPACITY FACTOR'(Using MDC)........, 97.9% 92.9% 67 11 [
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 97.9% 92.9% 67.2% '!
i
'18. UNIT FORCED OUTAGE RATE.................. 0.0% ,,
4.4% 15.1% j i 19. SilUTDOWNS SCllEDULED OVER NEXT C MONTHS (TYPE. DATE AND DURATION OF EACll): [
L .
l t
L Refueling and scheduled maintenance outage to begin September 14, 1991,
- 20. 'IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A f
\ t
-[>
( t
- . - -...-..a-,,a--....-___._. , _ . - - - . _ _ _ _ , - _ . _ _ _ . . _ . . - _ . , . _ -. - - _. - . . - - -
-. _ _ _ _ _ ~ _ -. . - . - . - - _ . . - . - - .. . . - .
[
AVF. RAGE DAILY UNIT POWER LEVEL I
DOCKET NO. 50 499 ._
UNIT 2 (
DATE Sen. 5. 1991 -
COMPLETED BY A.P. Kent TELEPil0NE 512/972 7786 ;
f MONTil AUGUST i r
e DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY NVER LEVEL (MWe-Net) (MWe Net) 1 1224 17 122h.
2 1226 18 1227 3 1215 19 1227 _
4 1211 20 1225
$ 1223 21 1224 6 1225 22 J224 7 1225 23 1217 .
8 1225 24 1227 9 1224 25 1229 10 1224 26 1230 11 1223 27 1231 12 1221 28 1231 13 1220 , __
29 1728 14 1224 30 __
1228 15 _
1224 31 1229 16 1227
_ . . . . .m --m . . . . - . . . . - . - . _ . . - . - - . . . . . . .- _ _ . . . . . .~
'~
.' UNIT SHUTDOWNS AND POWER REDUCTIONS ~
DOCKTT NO. 50-499
' UNIT 2 +
DATE Sec. 5. 1991 CO!iPLETED BY A.P. Kent TELEPHONE 512/972-1786^
REFDRT MONTH AUGUST 1 2 . - . . :3 AI 5 .
Method'of No. Date Type- Duration Reason Licensee Syrtem Component Cause & Corrective Action to (Hours) Shuttfny, ' Event Code Code Prevent Recurrence Down Report #
R( r THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD l
l
.l I . _ .
1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram .j' D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Ou' age F-administrative 5-Reduction G-Operational Error (Explair) 9-Other
~ . . . . _ . - . - .. - .. . . - . . . . . - ~ , . . . - . . . - - . - . . -
~ . .
... l a'
4 5 4.
2 .. ,
I
. .1 fpRVs and Safety Valves Summary l i
There were no PORV or Safety Valves challenged during the reporting period, l