MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
,. .
The Light company """"' "
llouston Lighting k Power . -
January 10, 1991 ST i!L AE 3669 File No.: 002 10CFR50,71 U. S. Nuclear Regulatory Conaiscion Attention: Document Control Desk Vashington, DC 20555 l
South Tcxas Project Electric Generating Station Units 1 & 2 Docket Nos, STN 50 498 & 50 499 l
Monthly Operatine Reoorts for December. 1990 Pursuant to 100FR50,71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6,9.1.5, attached are the Monthly Operating Reports for December, 1990, If you should have any questions on this matter, please contact Mr. C. A. Ayala at (512) 972 8628,
/
C ^& W
( A,, , llarrison Tanager, Nuclear Licensing l
! RAD /sgs Attachmen:.s : 1) STPEGS Unit 1 Monthly Operating Report December, 1990
- 2) STPEGS Unit 2 Monthly Operating Report - December, 1990 i
'(
A1/030.N16 A Subsid!ary of llouston Industries Incorpt, rated
^
' ~ '9161150005 901231 h PDR ADOCK 05000498 R PDR
,: 4 4 : .:
e -'t-b'_
h~ k. iH6uston Lighting & Power Compan - ST-HL AE-3669 South Texas Project Electric Generat ng Station No.* G02
-CCi Regional Administrator,_ Region-IV -Rufus S. Scott .
Nuclear Regulatory: Commission- Associate Ceneral Counsel--
- 611 Ryan Plaza Drive,-Suite 1000 _
Houston _ Lighting & Power Company ;
--Arlington, TX 76011- P. O. Box.61867 !
Houston,_IX 77208 George _ Dick,: Project Manager
( U.S.LNuclear Regulatory Commission: INPO
-Washington,'DC 20555 Records Center
__ _ _ . _ 1100 Circle 75 Parkway
' J . ; I . _ Tapia . Atlanta, CA 30339 3064
! Senior Resident Inspector c/o' U. S. Nuclear: Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane
- P. 0.-Box:910 _ .
Bally,et,10( 11713 Bay City,_TX; 77414 D, K. Lacker J. R.- Newman,. Esquire . Bureau of-Radiation Control Newman 6.Holtzinger,-P.C. Texas Department of Health
- 1615;L Street,11.W. 1100 West 49th Street Washir,gton, DC .20036. Austin, TX- 78756-3189 R.-P. Verret/D. E. Ward Central Power & Light Company P. 0.LBox 21211 Corpus Christi,'TX-- 78403
- J.-C.:Lanier/M.--B. Lee City of _ Austin Electric _ Utility Department P.0.-Box 1088- ,
i Aus tin,' . TX l 78767. s R. J;- Costello/M. T'. Hardt
< City Public: Service Board P. 0.LBox 1771=
_ San _ Antonio,;TX 78296 Revised 10/08/90 4
L4/NRC/
r i --i . . i. .' .. . . . . . . . . . . . . . , - . . . , . .
ATTACHMENT I SToHL AE %k9
. PAGE I 0F D 1
l l
l SOUTil TEXAS PROJECT ELECTRIC CENERATING STATION UNIT 1 MONTilLY OPERATING REPOR1 DECEMBER 1990 ,
1100STON LICllTING AND POWER CO.
NRC DOCKET NO, 50-498 LICENSE NO, NPF-76
_ Reviewed : .
t - M -9 i Supervisor Date Re By: / ' 4' ' N Plant'EngtTter(ngynnger Date Approved By: d u; If 4!9l Plant Manz er Date
ATTACHMENT I ST HL.AE %9 PAGE 1 0F- (a Monthiv Summary STPEGS Unit I remained shutdown following a unit trip on 11/24/90 due to an actuation of the generator ground fault protection rtlay.
l 1
)
l l
l
. J ATTACHMENT I L . .
ST Hl. AE %M 9
PAGE 0F L OPERATING DATA REPORT DOCKET NO. 50 498 UNIT 1 DATE Jan. 4. 1991 COMPLETED BY A.P. Kent TELEPil0NE 512/972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 12/01-12/31 GROSS Il0URS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUTil0RIZED POWER LEVEL (MWt): ).B.Q.Q MAX, DEPEND. CAPACITY (MWe Net): 1250.6 DESIGN ELECTRICAL RATING (MWe Net): 1250.6
- 3. POWER LEVEL TO WilICH RESTRICTED (IP ANY)(MWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A TilIS MONTH YR TO DATE CUMULATIVE
' 5, NUMBER OF 110URS REACTOR WAS CRITICAL, . . . . 0 5533.7 . 13781.1
- 6. REACTOR RESERVE SIIUTDOWN ll0URS . . . . . . . . . , , 0 0 0
- 7. Il0URS G ENERATOR ON LINE , . . . . . . . . . . . . . . . . . 0 5202.3 13141.1
- 8. UNIT RES ET.VE StiUTDOWN 110URS . . . . . . . . . . . . . . 0 0 0
- 9. GROSS TilERMAL ENERGY CENERATED (MWt)..... 0 18999716 47678208
- 10. GROSS ELECTRICAL ENERGY CENERATED (MWil) . . 0 6366900 16097490 11, NET ELECTRICAL ENERGY GENERATED (MWH) . . . . 17721 5999814 15124483 12, REACTOR S ERVICE FACTOR . . . . . . . . . . . . . . . . .. 0.0% 63.2% 66.8%
- 13. REACTOR AVAILABILITY FACTOR.............. 0.0% 63.2% 66.8%
- 14. UNIT S ERVIC E FACTOR , . . . . . . . . . . . . . . . . . . . . . 0.0% 59.4% 63.7%
15, UNIT AVAILABILITY FACTOR................. 0.0% 59.4% 63.7%
- 16. UNIT CAPACITY FACTOR (Using MDC)........, 1.9% 54.8% 58.7%
- 17. UNIT CAPACITY FACTOR (Using Design MWe)., -1.9% 54.8% 58.7%
- 18. UNIT FORCED OUTACE RATE................. 100.0% 23.8% 15.5%
19, SHUTDOWNS SCllEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACil):
Scheduled 68 day refueling outage to begin January 15, 1991,
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 03/24/91
ATTACHMENT i ST HL AE %M PAGE Y OF 6 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 498 UNIT 1 DATE Jan. 4. 1991 COMPLETED BY A.P. Kent TELEPHONE 512/972-776.5 MONTH DECEMBER Y
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0
c
-UNIT.SHUTDOUNS AND POWER REDUCTIONS; -
DOCKrT NO. 50-498 - -
UNIT:'1- .
DATEJan. 4. 1991; COMPLETED BY A'.P. Kent
~ TELEPHONE ' 512/972-7786 REPORT MONTH DECEMBER 1 2 3 4 5 No. Date. Type Duration Reason Method'of Licensee System Component Cause & CorrectiveL Action t6 i (Hours) Shutting ~ Event- Code . Code ' Prevent.Recurrencej Down. Report #
Reactor 90-16 901124 :F: 744.0 A 4 1-90-025 TJ CCL The unit tripped'due:to an actuation"of~
the generator ground fault' protection' - -
relay. Internal inspection of'the.' genera- -
tor revealed damage to'the end turn of..
stator coil #20. A significant amount of.
header box anterial was missing, presum-ably vaporized by an. electrical:are from. g the failed stator coil end turn to' the -
cooling water manifold. Excessive end :
turn assembly vibration is suspected as-the root cause, however additional-testing and inspections are necessary before the-cause of the failure can be conclusively,-
determined. The generator rotor will be'
~
removed and full inspection and repairs' will be performed concurrent with the refueling outage.
t q
i m
1 2 3 -4 'S * *en >
F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983- Sig S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test '2-Manual Scram .mgQ-C-Refueling D-Regulatory-Restriction 3-Automatic Scram 4-Cont. of Existing
%Q e --8 E-Operator Training & License-Exam- Outage < gn $- .
F-Administrative S-Reduction ]~
C-Operational Error (Explain) 9-Other .hO L
- . H-Other-(Explain) 9 hI'
. , .- . . ~ . _ -+. ..L' x.-- . . ,
_ - . - ,,,, - . . , , + . . . .,,,n.n.- Y$
. .' ATTACHMENT L ST HL A PAGEu__0F E %LG9 PORVs and Safety Valves Summary There were no PORV or Safety _ Valves challenged during the reporting period.
8
'. . ATTACHMIST 2 ST HL AE 3 M PAGE _.L OF ._6 SOUTil TEXAS PROJECT 1
ELECTRIC CENERATING STATION f i
UNIT 2 l HONTitLY OPERATING REPORT DECEMBER 1990 ilCUSTON LICilTING AND POWER CO.
NRC DOCKET NO. 50-499 LICENSE NO, NPF-80
"~ '
Reviewed Supervisor Date Revic < -- ' ' E ' #/
Plarft Eng neering Manager Date Approved By: ._lf t)(#
f/
PlantMana);er \ Date l
l I
l' l
Al fMCHiviENT 2 ST HL AE & % 9 PAGE 2 0F (0 -
Monthiv Summary
'Following a refueling outage,_STPEGS Unit 2 was returned to service for normal operation on 12/11/90 at 0949. The unit operated for the remainder of the reporting period with no unit shutdowns or significant power reductions.
l<
l-l
[
t l
~
ATTACHMENT .2-ST HL AE 1049 PAGE S OF 6 OPERATING DATA REPORT DOCKET NO. 50 499 UNIT 2 DATE Jan. 3. 1991 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 12/01 12/31 GROSS 110URS IN REPORTING PERIOD: 744
- 2. CURRENTLY AUT110RIZED POWER LEVEL (MWt): 3800 MAX. DEPEND CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6 I
- 3. POWER LEVEL TO WilICil RESTRICTED (IF ANY)(MWe Net): None 4 REASONS FOR RESTRICTION (IF ANY): N/A TilIS MONTil YR TO DATE CUMULATIVE 1
5, NUMBER OF 110URS REACTOR WAS CRITICAL. , , , , 607.0 6004.4 8981.3
- 6. REACTOR RESERVE SHUTDOWN llOURS........... 0 0 0 l
- 7. Il0URS G EN ERATOR ON LI N E . . . . . . . . . . . . . . . . . . 508.9 5499.0 8345.6
- 8. UNIT RES ERVE SilUTDOWN 110URS . . . . . . . . . . . . . . 0 0 0 )
- 9. CROSS TilERMAL ENERGY GENERATED (MWt) . . . .1608911 20182891 24705268
- 10. ' GROSS ELECTRICAL ENERGY GENERATED (MWil) . . 534740 6809440 10022470
- 11. NET ELECTRICAL ENERGY GENERATED (MVil) . . . . 497468 6427594 9446768
- 12. REACTOR SERVICE FACTOR.................., 81.6% 68.5% 66.7%
- 13. REACTOR AVAILABILITY FACTOR. . . . . . . . . . . . . , 81.6% 68.5% 66.7%
l 14. UNIT SERVICE FACT 0R...................... 68.4% 62.8% 62.06
- 15. UNIT AVAILABILITY FACTOR................. 68.4% 62.8% 62.0%
- 16. UNIT CAPACITY FACTOR (Using MDC),........ 53.5% 58.7% 56.1%
- 17. UNIT CAPACITY FACTOR (Using Design MWe)., 53.5% 58.7% 56.1%
- 18. UNIT FORCED OUTAGE RATE...... .........., 0.0% 21.01 21.0%
L 19. SHUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACll):
l N/A
- 20. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
.1 ATTACHMENT d ST HL AE 3049 PAGE A __0F- 6 i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-499 UNIT 2 DATE Jan. 3. 1991 COMPLETED BY A.P. Kent TELEPHONE 512/972-7786 MONTH DECEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (KWe Net) (HWe-Net) 1 0 17 943 2 0. 18 1126 3 0 19 1224 4 0 20 1233 5 0 21 1244 6 0 22 1245 7 0 23 1240 8 0 24 1241 9 0 25 1248 10 -0 26 1251 11 130 27 1248 l
12 252 28 1256 13 297 29 1251 14 499 30 1250 1
15 824 31 1247 16 910 l
l I
d
- r- -
7'2v
~
' UNIT SHUTDOWNS AND EPOWER REDtiCTIONS -
~:4~ '
DOCKET NO. 50-499 .
UNIT 22' '
'DATE ~'Jan. 3. 1991'-
COMPLETED BYA.P. Kent TELEPHONE 512/972-7786
' REPORT MONTH ' DECEMBER'
< l 2 3 4 5
, No. Date Type Duration Reason Method'of Licensee System- Component Cause 6 Corrective Action to .
.(Hours) Shutting Event Code. Code Prevent Recurrence Down Report #
Reactor 90-13 900929 S 233,9' C 4'- N/A N/A N/A. Refueling .and scheduled maintenance" j outage.
90-14 901211 S 1.2 :B- 9. -N/A N/A N/A Turbine overspeed trip test.
f i
l I
i i !
l gm>l ~
1 '2 3 4 5 m F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 rny S: Scheduled A-Equipment Failure (Explain) 1-Manual i iz, l
B-Maintenance or Test C-Re fueling- .
2-Manual Scram 3-Automatic > Scram. 1 M[ WZ C
- D-Regulatory Restriction 4-Cont. of- Existing o I E-Operator Training & License Exam Outage Y '
F-Administrative '
G-Operational Error.(Explain) 5-Reduction 9-Other f -
'H-Other (Explain) l
! I
. . . , . . _y . .. . _ . . ._ . . _ . , , , . . . ~ ~ 1_.,J, . . _ . . .
~ n.,
ATf/4 HMENT s. - - -I ST hlAE Sou PAGE 3 0F L 0 -
J PORVs and Safety Valves SummaII There were no PORV or Safety Valves challenged during the reporting period.
,