ST-HL-AE-2817, Forwards Revised Us Tool & Die,Inc Documents Re Revised Spacing of High Density Spent Fuel Storage Racks from 0 Gap to 1 Inch,Per 880929 Commitment.W/Two Oversize Drawings

From kanterella
Jump to navigation Jump to search
Forwards Revised Us Tool & Die,Inc Documents Re Revised Spacing of High Density Spent Fuel Storage Racks from 0 Gap to 1 Inch,Per 880929 Commitment.W/Two Oversize Drawings
ML20205B779
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/14/1988
From: Mcburnett M
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20205B783 List:
References
ST-HL-AE-2817, NUDOCS 8810260317
Download: ML20205B779 (4)


Text

/

i The Light company P.O. Ilox 1700 liouston. Texas 77001 (713) 228 9211 llouston Lighting & Power - - -- - - - - - - - - - - - -

October 14, 1988 ST liL-AE-2817 File No.: C20.02.01, M20.1 10CFR50 U. S. Nuclear Regulatory Commission Attention: Docurnent Control Desk Washington, U'; 20555 South Texas Proj ect Electric Gens.' ting Station Units 1 and 2 Docket Nos. STN 50 498, STN 50-499 s Revised Documentation Based on One Inch Spacing of liigh Density Spent Fuel Racks Refereice (1): llMP Letter to USNRC, ST liL- AL-2417, dated March 8, 1988; Expansion of the Spent Fuel Pool Storage capacity Using liigh Density Spent Fuel Racks. j l

(2): llL&P Lerter to USNRC, ST-liL- AE-2738, dated August 10, 1988; Summary of Meetirig on July 11 & 12, 1988 to discuss liigh Density Spent Fuol Racks. 1 (3): llL6P Letter to USNRC, ST-HL-AE 2750, dated August 9, 1988; Summary of NRC Technical Audit of U. S. Tool & Die, Inc. on July 20 to 21, 1988.

(4): llL6P Letter to USSRC, ST-liL AE 2756, dated August 19, 1988; Response to NRC Questions.

(5): JilnP Le t t er to USNRC , ST-llL-AE 2764, dated August 30, 1988; Pevised Responses to NRC Questions, j (6): lilAP Letter to USNRC, ST llL AE 2775, dated September 21, 1988; Response to Additional NRC Questions in August 22, 1988 rne c t i ng .

(7): ilMP Letter to USNRC, ST-llL AE-2790, dated September 22, 1988;  ;

Respon:,e to Additional NRC Questions '

(8): lilAP Letter to USNRC, ST ilL-AE 2795, dated September 29, 1988; Revised Spacing of liigh Density Spot .: Fuel Racks.

IA\NRC\cq l (

.\ Subsidiary of linuston Industries inwrimrated GG10260317 881014 PDR ADOCK 05000498 P PDC

, e S

flointon I.ighting & Power unnp.in)

F eh .02.01, M20.1 Page 2 As a result of the revised spacing of the high density spent fuel storage racks from zero gap to one (1) inch, Houston Lighting and Power committed (See Reference 8) to submit revised U.S. Tool & Die, Inc. (UST6D) documents which were previoo=1v 'ubmitted to the NRC. The original design basis analysis to support th- wing submittal (Reference 1) as well as NRC requested c o n f i rma '. , . , studies (outlined in References 2 through 8) did not require any reanalysts due to the incressed rack spacing.

If you should have any questions on this matter, please contact Mr.

A. W. Harrison at (512) 972-7298. -

a A. cBurnett N

Manager, Operations Support Licensing RLE/hg Attachments: (1) Revised pages to UST&D Seismic Analysis Report (Submitted in Reference 2, Attachment 3)

(2) Revised UST&D Drawings (Submitted in Reference 4, Attachment 2);

8709 60; Installation Plan Phase II 8709-01; Installation Plan Phase III (3) Revised pages to UST6D Spent Fuel Rack Handling and Installation Instructions (Submitted in Reference 4, Attachment '. )

(4) Revised pages to UST6D Mechanical Report (Submitted in Reference 2, Attachment 4) 1A\NRC\cq

llouston 1.ighting & Power unnpany ST HL AE-2817 File No.: C20.02.01, M20.1 Page 3 cc:

Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 llouston, TX 77001

  • George Dick, Project Manager U.S. Nuclear Regulatory. Commission INPO Washington, DC 20555 Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, CA 30339-3064 Senior Resident Inspector / Operations c/o U.S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 J. I. Tapia Senior Reeldent Inspector / Construction c/o U.S. Nuclear Regulatory Comnission P, O. Box 910 Bay City. TX 77414 j J. R. Newman, Esquire Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 l

R. John Minor (2 copies)

Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. liardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296

(*) To receive all Attachments. All others shall receive no Attachments.

Revised 08/24/88

L4\NRC\cq

m ATTACHMENT 1 REVISED PACES TO UST&D SEISMIC ANALYSIS REPORT (SUBMITTED IN REFERENCE 2. ATTACHMEN? 3) i l

i l

i l l

1 4

l

\

i L4\NRC\cq y . ._ ._ _

,_ . _ _ _ . . _ , _ _ _ _ , , , _ -_ - _ . _ ..,____