Text
______ _____
ESTaDmc NttclearPmdttcts RACK HANDLING AND INSTALLATION INSTRUCTIONS I
SOUTH TEXAS PROJECT SPENT FUEL STORAGE RACKS UNITS 1 & 2 HOUSTON LIGHTING & POWER COMPANY 8709-00-0500 PREPARED FOR BECHTEL ENERGY CORPORATION HOUSTON, TEXAS P.
O.
- 14926-4480/8480 SPECIFICATION NO. 3F239NS1007 f
l REVISION 0, MAY, 1988 REVISION 1, JULY, 1988 REVISION 2, OCTOBER 1988 l
l l
PREPARED BY: _.8
/FNM/
r l
4030 Route 8 Allison Park, PA 15101 i
412 487-7030 l
8G'.02604G3 831014 DA (40GCK e5000499 PDC
SOUTH TEXAS ERQJECT SPENT FUEL SMRAGE RACKS BACE liANDLIMG AND INSTALLATION INSTRUCTIONS 1.0 BACE liANDLING On-site handling consists of removal of a rack horizontally from the shipping truck, upending to vertical, and vertical lifting.
The necessary equipment will be shipped with the first rack.
The maximum estimated weight of the heaviest rack is not more than 15 tons.
Three reduced size drawings each for Region 1 and Region 2, Figures 1 through 6, are included here, showing rack handling and equipment.- These were reduced from drawings 8709-46, Region 1 and 8709-47, Region 2.
1.0.1 Horizontal lift is accomplished with a pair of nylon straps slung around the rack and attached to a I
spreader bar.
The spreader bar is rigged with a two-leg sling hung on the lifting crane hook.
1.0.2 Upending is accomplished by using two of four vertical lifting adapters and attaching them to a pair of cables hung from a spreader bar.
The spreader bar is rigged to a two-leg sling hung on the upending crane hook at the top end of the rack.
Two brackets are bolted through bottom plates at the bottom end of the rack.
The horizontal lift nylon straps are looped through these brackets and hung on a second crane hook which provides stability as the top end is raised.
If the second crane hook is not available the upending operation can be accomplished by carefully rolling the rack about its bottom edge using the crane at the top end.
1.0.3 Vertical lift is accomplished by using the four ver-tical lifting adapters which have a bayonet end at the bottom and extend tuil length into storage cells which have a bayonet slot jn the bottom plate.
The top ends of the adapters are pinned to the ends of a pair of spreader bars to which is attached a four-leg sling hung on the lifting crane hook.
The pair of syrer. der bars ptcvide the required lift redundancy in accord-ance with NUREG-0612.
l
2.0 INSTALLATION There are three phases of rack installation.
These phases are defined below:
Phase I (Unit 2 only) - Region 1 racks (6 racks) installed to store new fuel dry (Ref. dwg 8709-59).
Phase II (Units 1 and 2) - Region 1 and 2 wet spent fuel and consolidated fuel storage without a three rack row at the south end of the spent fuel pool (Ref.
dwg 8709-60).
Phase III (Units 1 and 2) - Region 1 and 2 wet spent fuel and consolidated fuel storage, full pool (Ref.
dwg. 8709-1).
2.1 EllASE I INSTALLATION 2.1.1 Place Rack #1 (dwg. 8709-2) in the pool, dimensionally spaced from the north and west walls as shown on the plan arrangement for Phase I rack installation (dwg.
8709-59).
Level the rack by using a six to eight foot long spirit level across the top of the rack.
Leve-ling requires that the rack be lifted clear off the floor while using the pedestal adjusting screw tool down through the appropriate cell over the screw.
Level the rack to i 1/16 inch.
2.1.2 Place Rack #2 (dwg. 8709-3) in the pool, dimensionally spaced from the west wall and Rack #1 as ohown on the plan arrangement for Phase I rack installation (dwg.
8709-59).
Place Rack #3 (dwg. 3709-4) in the pool, dimensionally spaced from the north wall and Rack #1; place Rack #4 (dwg. 8709-5) in the pool, dimensionally spaced from Rack #2 and Rack #3; place Rack #5 (dwg.
8709-6) in the pool, dimensionally spaced from the north wall and Rack #3; and place Rack #6 (dwg.8709-7) in the pool, lidensionally spaced from Rack #4 and Rack #5 as shown on the plan arrangement for Phase I rack installation (dwg. 8709-59).
For Rack #5 and Rack #6 confirm that the minimum dimensions from the east wall are met.
Racks #2,
13, 14, #5, and 16 shall be leveled as described in Section 2.1.1.
2.2 PJi&SE 11 INSTALTATION 2.2.1 Place Rack #1 (dwg. 8709-2) in the pool, dimensionally spaced from the north and west walls as shown on the plan arrangement for Phase II rack installation (dwg.
8709-60).
This placement will be accomplished by measuring or using gage blocks if available.
Level the rack, if the installation is dry, or diver assisted if wet, by using a six to eight foot long spirit level across the top of the rack.
Leveling requires that the rack be lifted clear off the floor while using the pedestal adjusting screw tool down through the appropriate cell over the screw.
Level the rack to i 1/16".
2.2.2 Place Rack #2 (dwg. 8709-3) alongsjde Rack #1 and dimensionally spaced from Rack 11 and the west wall as i
required on the plan arrangement for Phase II rack installation (dwg. 8709-60).
All racks shall be installed with a minimum 1" rack-to-rack gap.
The l
maximum rack-to-rack gap shall not exceed 1.25" as noted on (dwg. 8709-60).
Place Rack #3 (dwg. 8709-4) alongside Rack #1 at the same dimension from the north wall.
Place Rack #4 (dwg. 8709-5) alongside Rack #3 and #2.
Place Rack #5 (dwg. 8709-6) alongside Rack #3 and at the same dimension from the north wall.
Place Rack 16 (dwg. 8709-7) alongside Rack 15 and #4.
Level each rack as it is installed as described in Section 2.2.1.
The south face line-up of Racks #2, 14 and #6 shall be porpondicular to the west wall.
The north face lino-up of Racks fl, 13 and #5 shall be parallel to the north wall.
2.2.3 Place Rack #7 (dwg. 8709-8) alongside east face of Rack #5 and dimensionally spaced from the north wall as shown on the plan arrangement for Phase II rack installation (dwg. 8709-60).
Place Rack #8 (dwg.
8709-9) alongside the south face of Rack #7.
Line-up the cast face of Rack #8 with the east face of Rack
- 7.
In sequence, install Racks #9, #10, #11 (dwgs.
8709-10, -11, -12, respectively), with the previously installed rack south face.
The east face of these five racks are to be in-line and parallel to the east
wall.
Each rack shall be leveled as it is installed as described in Section 2.2.1.
2.2.4 Place Rack #13 (dwg. 8709-14) alongside Racks 16 and
- 9.
The first row of storage cells in Rack #13 in the east-west direction shall be in-line with the last row of storage cells in Rack 18 in the east-west direction.
Place Rack #14 (dwg. 8709-15) alongside Rack #13 and Rack #10.
Place Rack #15 (dwg. 8709-16) alongside Rack #14 and Rack #11.
Each rack shall be Jevel.ed as it is installed as described in Section 2.2.1.
2.2.5 Place Rack #17 (dwg. 8709-18) alongside Rack #2 and Rack #13.
Place Rack #18 (dwg. 8709-19) alongside Rack #17 and Rack #14.
Place Rack #19 (dWg. 8709-32) alongside Rack #18 and Rack #15.
Each rack shall be leveled as it is installed as described in Section 2.2.1.
2.3 PEASE 111 IHSTALLATION Phase III rack installation (dwg. 8709-1) is identical to Phase II rack installation (dwg. 8709-60) with the addition of three racks at the south end of the spent 1
fuel pool.
Specifically, Racks #12, #16, and #20 will be installed alongside Racks ill, #15, and #19.
2.3.1 Place Rack #12 (dwg. 8709-13) alongside the south face of Rack #11 and in-line with the east face of Racks 17, 18, 19, #10 and ill as shown on the plan arrange-nent for Phase III rack installation (dwg.
8709-1).
The east face of Racks #7, #8, #9, #10, #11 and #12 shall be parallel to the east wall.
Rack #12 shall be leveled an described in Section 2.2.1.
1 2.3.2 Place Rack #16 (dwg. 8709-17) alongside the south face of Rack #15 and the west face of Rack #12 as shovn on the plan arrangement for Phase III rack inntallation (dwg.
8709-1).
Rack #16 shall be leveled as described in Section 2.2.1.
2.3.3 Place Rack #20 (dwg. 8709-33) alongside the south face of Rack #19 and the west face of Rack #16 as shown on the plan arrangement for Phase III rack installation 1
I
o i
4 (dwg. 8709-1).
The west face of Racks #17, #18, #19, and #20 shall be in-line and parallel to the east wall.
The south face of Racks #12, #16, and #20 shall be in-line and parallel to the south wall.
Rack #20 shall be leveled as described in Section 2.2.1.
2.4 SPECIAL TOOLS (a)
Horizontal Lift Spreader Bar & Cable Rigging (b) 2 Horizontal Lift Nylon Straps (c) 4 Vertical Lift Adapters (d)
Upending Spreader Bar & Cable Rigging (e) 2 Upending Botton-Side Brackets (f) 2 Vertical Lift Spreader Bars & Cable Rigging (g)
Pedestal Adjusting Too.1 (h) 3 Gage Blocks, Wall-To-Rack (if required)
(i)
Handling Tool, Portable Lead-In Funnel (j)
Handling Tool, Region 1 Removable Poison i
i i
F b
i i
i J..
i
Twwo LECI. SLa w JGo*4'O AT T*WFL r
ceu)~a an.Lov um ( n.c. m.mEe s%S) ee
" * ' ^ ~ Kif.i1JW m oP..4& M',?)
a
&MPM%"d'#' 4%'.h>
s tu :s-.-s.1,1--e - m.,4.o.s.. Me..,
s mm wr o O.
o cran s
-- u. z...
v==g cm -.co s=m.se :noc To w-oc o m m c-- x a
Pteg= h tUCMLS TO q.OF TauO AJVSTesewT) 1 AT f
us s-
{
.Y iw sc.ew -
- s - s-o To.mc wv u.e - s cwon me-
- en-(% -in e s:i) esi.2, eTos-**
Y c s eciAhe.vs_oce metuso.e sm. cac-esse s:.)
su
_3
( V a=mo o.)
_- e _.
I i A N o.=.to v.a. a.ur.r.m--
i i -
5 AS ND
_E
_' E M =_-
r..
J 1
1 4,
_u au4 _ o 4 y
\\-wooo ca.new.e RACK HORtIONTAL LtFT SOUTH TEXAS PROJECT - REGION 1 - ORAWING 8709-46 FIGURE 1
i-ii N
9i p}q'.idlF Il2 3(i
,h;!. @li
- c.
3 y
d)!i ll
=
L A
N L" g
55
(
l E
I l7 ll 1
m 9,nel I
25 n
3 z
d l, g?
-.=.
w
=. =+
e a
, s.
L. Iff h
g
=
=
- g 7
1 t
f;-E W
T 5I:
nl!!
k I
g
!((I l d j! j!! pll hlgsl!.-
l.1 !
3,,g. I!.i,
hn;bB i
f lid l Ia s; f
{g
$!!I!
I'
,, i'
- w.f "
~
n,ydpg r"t VERTICAL LIFT SLINGS d"
bb
- t. FOR GR 2. B 109-40 (UPPER SPME ADER REAM)
- D' k
Two LEG SLtNG JotNED AT
?.* wtLDLass OBLCC*G ALLOY L'M M'- C R C
- 3G* ST @ 5 a) p o y 9 l} ' ;[ il jj LE4
- A* -l*- G = 37 IW8tC (t%S. = 44.ST), EwTRA HEAVY THinAGLE CNE ENO AND (West W EACER BEM cc'EN SWAAE N')CMET OTWR EMD 5S*t.G.
GR.2.8709-%USE m e >40LES
( *M540E Tt**d4LE TO Q cp SWAGE.
SOCMT AN.)
b LEG *B* - 1%N 24* Ls. JAW 4 jaw Tumeuce LOwEn sr stEAMR m
@EN 4OC
- 28 M yt) TumeuCxL u'_
on. i. a7ow-ao.
SS.
9 et NO. t HOLES
- 2. FOR GR. l. 6709-40 (t.OWER SPWtFADEWL BT.AM)
TWO LEG SLtNG - LE4
- S* TYP. FOR SOTH Lt&S '
=.
M-JOsNED AT O*
DLESS DELONS ALLov Lim (R.C. = SG.ST 4 TMt. EACH LES COMSt1 T"5 OF
(,qt.c.. ;g,es@ 5;t)4 JAW TumMSuCwtE.N OrtM M S%
A tYa* = 24 - LG. JA M
2C-O.
l l
l REF RACK VERTICAL LIFT I. A h*EthE VesETICAL LIFT SLe*45 Mc SysteAcets AND HAP *G ON TME C9EANE 44004(
- 2. EPe4.Aet THE UPPEft, SpetEADWpk TO THE TWO Os A40 MALI Y OPPOS47M VWFE.T. LIFT *1t'*4 ADAPTTsqLS.
INSERT THE ADAPTRR PtMS 4 SECUSIE WITM TheE j
'", p
'#,s BALL-LOCK PtNS. AD3UST TME N TustMtEk"ts4.E RAC1 VERTICAL.1M TM PLANE
' ""~
TO MANS THE SPREADGEL.'A f,#
l OF TME
,s
- 3. ENGAGE DW. LOWVEfL SPULEADER "It3 THE OT>etsL TWO DL AMONALLY OPPOSETE W84LT. LaFTtMe ADAsrTerAS.
PIN 9 St. cup 4E AS ABOVE. WITH STACK WEbeMT ON AD.3UST TM "TWO THE OPPEst SPvtEADSL,T*4 WEACM. NCAL IM TU5tNOUCKLES TO )#N4 THE. PLANE OF THE. SPREADER. 54MCNE ANY St.ACK AT F.tTb4ER TURNBUCKLE...
a k
U RACK VERTICAL UFT SOUTH TEXAS PROJECT - REGiCN 1 - DRAWING 8709-46 FIGURE 1
m TWO LECa SLING JOWED AT 2
- WTt.D LE.S6 ceLoees ALLov Laren (vtc. 36.av 4 s.::) (nSo.= 44.*T)
A L.ags
- A*
t*- G
- TT Iwstc ww4e vuto**E exTxx mAvv Twunta owe.o cw-w w leg
- A*
swaina secuzT oT**en v.no,so2-ts.
(nftS4DE NOLE TO Q oc SoCMET EMN)
LacG* n* t"-%rr twsute wima. s= ope ras.44.wr)
Errvia tetAvv TwwmLE ombr<o ore.x t
war.ar socwaty oTwast ar4o c _ _.o
.W1Y1? EE12
- Eva TusmNsucKLa.
II rm.-
s:t io:*La. rsnseca.
Il tme. a.
_7w To q os much ete<-
_.wsua exLg, Ay amo-AJusTmenNT3 y
1 1
I
(
i'4 sesEw ms
- - s*
><:sutowTAL AnCucat m utz Lt*T st"5*EADER (R.C.= 81T e 5;t )
zumsr s=.z.
31oe-43 G* SPECIAL NYt ON 84ETUsue tvz SL p* *4o* C sec-sTe a:i) w%
I L
6' 1
I I
\\
i i !
I i
l i
a i
i N
N j
i i i
i i
I 4
i t
- eocuts-pgus r (s **eet.),s7os-44 LoAo % c.a.i
! i i i
l i q
{
i ll l'
I i
l I
t I
I l
t i i i l__ i i
y m
m WOOO CRicatr4G RACK HORIZONTAL LIFT g
9-@ en 9
SOUTH TEXAS PROJECT - REG 10f4 2 - ORAWIf4G 8709-47 FIGURE 4
F me.o.w se-a. cwa seu.s sa..use e.o.z.a otus.m>=
ets mAM,o+-4s.
a
.umctPT es.. zo.v =
- o. : oun s.
< a s. 3.,. e. -cer we w l
.-s.
t
. e.oe,-
t use.
- a vu=T. twt stie s wiv>t Two *s (Tume. mets) Laas oenn To *o %.'
mm me + w *a to a.
wr rms.
5 v* q pg C" "
w.w v it c m.-- m= verr
,c.c.%...m.u.
yw
~
- r - = ~ = L. ===
4.
o 2.i.
.m.
ome,.
, e.-- o = x 4sure.-
1r T**uL2 N OF M 'T**
U ^E*.o ~w ? vomiv " o v %
usrTING e s (A t.
ucy w w
A a70s-4s A Ten Assum amouws 3.s:2. wo sr.4,swo-as.
av o
W me - m-v m-e.rswe h. N
- y[
9 P'lf - 6 g
L OCle.
w eep.*
amor =T r.
p [UPENO Ts'd3
}
<-. <~.
[ '"$ M"d['"
m y,i w
q
- v. -v ces om is M N CP gm g L..'[ j cg N'
i, i t :' !
h a
ru s m m
i13 e
y
/
sMal E 3lo mas % iT ema-*. a7o g-
- C "" ** >
w svcac vimicv.tary r ;.
su.w o,vwn se - = x. =u. st.w7 %-i,,-
ane-e r e wo swv s
.mDv ATW.
Sup* M KN
.",- 4** w*T
- ^QWM iNiX.
c
\\
.wa
+L.m
^^
T = ca T&*Jr m.
m* - w i
- illiii
.a A. un un r
\\ wooo m3 190TToes or STACK Top cr stAcx RACK UPENOtNG ___ N 73-1Mm PLYween SOUTH TEXAS PROJECT - REGION 2 - ORAWING 8709-47 FIGURE 5
t *
.l.
6 I
i,i i
~
!*Jii!
VER.TICAL UFT SL1NGS uprest SpotstAceret mEAna) r i ii
!i
- s. Feet GR. 2 e m -40cet42 Two les Sures.To AT 2* wetotusS i
i ie ii ost.oree ALW UNe(
R.C. e 36.&T @ S;9 )
LEG
- A* - s* - G = 5 I TW8tC (B.S. = 44 9T E%TMA UU'* Tut SP8U'AOt"5% BEAaA WAVY *D45 tele. M WHO set TABLgt=t OPEN SWAet. SOCKET ON WHO 35*L6 ONSaDEL THeeeQE. TO S 08' SWuAeEL l
4 SOChutT mee.y Ls9G
- n*- 6%*
o Sat E TAnts - t 7,
over. 4 ov.
ron c.R....,o., s*ur<e= 42 ktow=n - -25 Two te a-L s
- W TYP Mm. tow 4 u 25'-O JOsnto AT 2*
1% runa twes Au_ cps' L eel McF.
(544.= %.eT e Ett. W.ACn 4 LE4 CosmeSsSTS Car 4 J AW TUWLN EtuCKLE 3
A S Y * = 24
- 4 TUuutRUCMLE ON TO 59'4 2
(K C.
- 24,400* @ Sit 4
RACK VERTICAL LIFT
.. wMMte wstT. cat. uwT wMas Ano macent Areo MAmes Cet TMEL CRANW HOOn.
'p- 'a O. t'w "net h WAN TO M Tws0 cwa 40** ALLY OPymosaTw. vWET. LaerTens Aomptgges.
(NSeptT THE ADAPTM P9*4S 4 6 wth M sLALL - LOCmL pa r4S. AOJUST THE SureeLC TLambremuo45 TO Mares THE SMACK veRTh WP4 TME. 9'LAret, our THEL SPWmEADept.
.h DeGAdS t". M LOWWit SP8tt.Acept 70 THE OTHest TWO O* AGsON ALLY O p r o set E v estr. Lar Tures SMPe 9 SECU8lhEL A% ASOVE.W4TH WEIAO4 A N EFE%
ab.7utv THe.
WeseMT OM Twa ursuest SuaumaADept TtastrertuCKLES TO 94Aree TM sd NMCAA. SM THE PLAreAL OF TMS SP4EEAccum.. WEWMOVE AreY I
SLACD4 AT EtN TusEIPteucesLE.
RACK WRTICAL LIFT TABLE -I RACK reO. : 64EE. N ',,",,pc,,,,
G8t.2 CaA 4 T. S.S. I a. e 2.
7 4%,tG,s7, e 46 8ROO-40 8109-40 30.83404 OS at. 2 Gst e
~
59420 2A SOUDI TEXAS PROJECT - REGION 2 - DRAWING 8709-47 flGURE 6
7-t 0
a 1
J l
l 1
l l
i L'
1 ATTACHMENT 4 i
REVISED PACES TO UST&D MECHANICAL REPORT (SUBMITTED IN
(