05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER

From kanterella
Jump to navigation Jump to search
Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER
ML20196G666
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/17/1999
From: Lovell J
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196G670 List:
References
NOC-AE-000556, NOC-AE-556, NUDOCS 9907010240
Download: ML20196G666 (2)


LER-2099-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER
Event date:
Report date:
4982099005R00 - NRC Website

text

'

O Nuclear Operating Company South TeethqfectEkctrkGamtkgStatkn 20 Bar289 Mbdmurth Teas 17483 m _

June 17,1999 NnC-AE-000556

{

File No: G26 10CFR50.73 STI: 30892497 v

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 .

1 South Texas Project j Unit 1 i Docket No. STN 50-498

! Licensee Event Report 99-005 l Auxiliary Feedwater Train D Inoperable 1 for Greater Than 72-hour Technical Specification Limit I l

Pursuant to 10CFR50.73, the STP Nuclear Operating Company submits the attached Unit 1 Licensee Event Report 99-005 mgarding a failure to meet the mquirements of Technical Specification Surveillance 3.7.1.2 Action b for the Auxiliary Feedwater system. This event did not have an adverse effect on the health and safety of the public.

l The only commitments contained in this letter are located in the Corrective Actions section of the attachment. If you should have any questions on this matter, please contact Mr. S. M. Head at (512) 972-7136 or me at (512) 972-7799.

l l-A w)

L J. R. Imvell Manager Generation Support

\

. ' ', 4 l JRM/

Attachment:

LER 99-005 (South Texas, Unit 1) fi:

,1

/

}'/

9907010240 990617 ,'

PDR ADOCK 05000498

.. .. \

NOC-AE-000556 File No.: G26 Page 2

)

cc:

3 Ellis W. Merschoff Jon C. Wood l l

Regional Administrator, Region IV Matthews & Branscomb j U. S. Nuclear Regulatory Commission One Alamo Center 611 Ryan Plaza Drive, Suite 400 106 S. St. Mary's Street, Suite 700 Arlington, TX 76011-8064 San Antonio,TX 78205-3692 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 Cornelius F. O'Keefe Richard A.Ratliff Sr. Resident Inspector Bureau of Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 1100 West 49th Street Bay City, TX 77404-0910 Austin, TX 78756-3189 J. R. Newman, Esquire D. G. Tees /R. L. Balcom Morgan,Ixwis & Bockius Houston Lighting & Power Co.

I800 M. Street, N.W. P. O. Box 1700 Washington, DC 20036-5869 Houston,TX 77251 M. T. Hardt/W. C. Gunst Central Power and Light Company City Public Service ATTN: G. E. Vaughn/C. A. Johnson j P. O. Box 1771 P. O. Box 289, Mail Code: N5012 j San Antonio,TX 78296 Wadsworth,TX 77483 A. Ramirez/C. M. Canady U. S. Nuclear Regulatory Commission City of Austin Attention: Document C~itrol Desk  !

Electric Utility Department - Washington, D.C. 2055t-0001 )

721 Barton Springs Road Austin,TX 78704 i l

4