NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls

From kanterella
Jump to navigation Jump to search
Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls
ML20196H126
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/24/1999
From: Calvert J
HOUSTON LIGHTING & POWER CO.
To: Bundy H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
RTR-NUREG-1021 NOC-AE-000571, NOC-AE-571, STI:30902435, NUDOCS 9907060043
Download: ML20196H126 (2)


Text

_ .

e 4

  • Nuc r Operating Company sown nunsn 5

n ecttartrecarrsingstatsm ra earisr nssmorir raas 77<si w_

June 24,1999 NOC-AE-000571 File No.: G30 NUREG 1021 STI: 30902435 Mr. Howard Bundy ChiefExaminer U. S. Nuclear Regulatory Conunission 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011-8064 South Texas Proiect "

Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 South Texas Project Initial License NRC On-Site Exam scheduled for July 5,1999 This letter is accompanying the Final Operating Examination Materials for the South Texas Examination scheduled for July 5,1999.

+

Three copies of the examination materials are provided for the Public Document Room, NRC Examination Files, and NRC Examination Review. The review copy also includes the  !

necessary reference materials to facilitate your exam review.

Additionally, copies of'.he Revised Operating Examination Outline and Post-Validation Change Summary have been included.

None of these materials are to go the Public Documents Room until after the examination has been completed.

Please contact me at (512) 972-7435 or Ted Werk at (512) 972-8654 if you have any questions. .

Sincerely,

,sn. Ca b k J s H. Calvert Manager, Operations Training JC/dl

Attachment:

Final Operating Examination Materials

[jh l

Revised Operating Examination Outline Post-Validation Change Summary j l t 9907060043 990624 PDR V

ADOCK 05000498 PDR

. of 7 NOC-AE-000571 9 ,,

File No.: G30 STI: 30902435 Page 2 c: copies distributed without attachments:

Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U. S. Nuclear Regulatory Commission One Alamo Center 611 Ryan Plaza Drive, Suite 400. 106 S. St. Mary's Street, Suite 700 Arlingtoa, TX 76011-8064 San Antonio,TX 78205-3692 Thomas W. Alexion Insutute ofNuclear Power Project Manager, Mail Code 0-13 D18 Operations- Records Csnter U. S. Nuclear Regulatory Commission - 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 Cornelius F. O'Keefe Richard A. Ratliff Sr. Resident Inspector Bureau of Radiation Control c/o U.S. Nuclear Regulatory Comm. Texas Department of Health P. O. Box 910 1100 West 49th Street Bay City,TX 77404-0910 Austin, TX 78756-3189 J. R. Newman, Esquire - D. G. Tees /R. L. Balcom Morgan, Lewis & Bockius Houston Lighting & Power Co.

I 800 M Street, N. W. P. O. Box 1700 Washington, DC 20036-5869 Houston,TX 77251 W. C. Gunst/ M. T. Hardt Central Power and Light Company City Public Service ATIN: G. E. Vaughn/C. A. Johnson P. O. Box 1771 P. O. Box 289, Mail Code: N5012 l San Antonio,TX 78296 Wadsworth,TX 77483 A. Ramirez/C. M. Canady U.S. Nuclear Regulatory Commission

. City of Austin Attention: Document Control Desk l

Electric Utility Department Washington, DC 20555-0001 l i

l 721 Barton Springs Road l

Austin,TX 78704 l

I'